Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13316A538 + (08:16:00, 11 January 2025)
- ML13316A537 + (08:16:03, 11 January 2025)
- ML13316A535 + (08:16:04, 11 January 2025)
- ML13316A530 + (08:16:05, 11 January 2025)
- ML13316A528 + (08:16:07, 11 January 2025)
- ML13316A525 + (08:16:08, 11 January 2025)
- ML13316A524 + (08:16:10, 11 January 2025)
- ML13316A522 + (08:16:11, 11 January 2025)
- ML13316A520 + (08:16:12, 11 January 2025)
- ML13316A516 + (08:16:13, 11 January 2025)
- ML13316A514 + (08:16:14, 11 January 2025)
- ML13316A512 + (08:16:18, 11 January 2025)
- PNO-V-90-007, on 900223,inadvertent ESF Actuation & Reactor Trip Occurred Resulting from Train B Main Steam Isolation Signal.Caused by Failure of Relay to Reset in One Channel. Plant Taken to Mode 4 to Allow Replacement & Testing + (08:16:20, 11 January 2025)
- TAC:73932 + (08:16:21, 11 January 2025)
- ML13316A485 + (08:16:23, 11 January 2025)
- PNO-V-89-038, on 890629,excessive Shaft Leakage Identified While Performing Inservice Testing of LPSI Pump.Walkdown to Verify Primary Plant Instrumentation Transmitters Properly Conformed to Equipment Qualification Requirements Performed + (08:16:24, 11 January 2025)
- PNO-V-89-025, on 890407,reactor Put Into Unscheduled Shutdown for More than 48 H.Caused by Reactor Trip Due to Drop in Voltage on Rod Drive Bus After Breaker Trip,Atmospheric Dump Valve V-8421 Not Operating Properly & Leak in Vent Line + (08:16:26, 11 January 2025)
- PNO-V-89-004, on 890106,reactor Trip & Safety Injection Actuation Occurred.Caused by Failure of non-1E Power Supply Due to Ground Jumper.Jumper Removed & Steam Generator Level Sensing Lines Blown Down for Sludge Accumulation + (08:16:28, 11 January 2025)
- PNO-V-88-047, on 880707,cavitation of Shutdown Cooling Pump Occurred During Draindown of Reactor Vessel.Caused by Blockage of Ref Level Sensing Port in Pressurizer by Installation of Temporary Camera Mounting Bracket + (08:16:30, 11 January 2025)
- PNO-V-88-046, on 880623,licensee Identified Potential Spent Fuel Pool Siphon Path.Drawings Indicate That Fuel Pool Purification Pump Has Capability of Pumping Water from Spent Fuel Pool to Other Locations.Controls Initiated + (08:16:32, 11 January 2025)
- ML13316A419 + (08:16:34, 11 January 2025)
- ML13316A417 + (08:16:35, 11 January 2025)
- ML13316A418 + (08:16:35, 11 January 2025)
- ML13316A409 + (08:16:37, 11 January 2025)
- ML13316A410 + (08:16:37, 11 January 2025)
- ML13316A408 + (08:16:38, 11 January 2025)
- ML13316A407 + (08:16:39, 11 January 2025)
- ML13316A405 + (08:16:40, 11 January 2025)
- Press Release-IV-13-034, NRC to Hold Meeting with Energy Northwest on Columbia Generating Station + (08:16:42, 11 January 2025)
- ML13316A403 + (08:16:42, 11 January 2025)
- Press Release-III-13-043, NRC Names New Resident Inspector at Point Beach Nuclear Station + (08:16:43, 11 January 2025)
- ML13316A363 + (08:16:44, 11 January 2025)
- ML13316A361 + (08:16:45, 11 January 2025)
- ML13316A359 + (08:16:46, 11 January 2025)
- ML13316A358 + (08:16:47, 11 January 2025)
- ML13316A355 + (08:16:48, 11 January 2025)
- ML13316A352 + (08:16:49, 11 January 2025)
- ML13316A351 + (08:16:50, 11 January 2025)
- ML13316A348 + (08:16:54, 11 January 2025)
- ML13316A347 + (08:16:55, 11 January 2025)
- ML13316A344 + (08:16:56, 11 January 2025)
- ML13316A343 + (08:16:57, 11 January 2025)
- ML13316A341 + (08:16:58, 11 January 2025)
- ML13316A336 + (08:16:59, 11 January 2025)
- ML13316A328 + (08:17:00, 11 January 2025)
- ML13316A327 + (08:17:01, 11 January 2025)
- ML13316A326 + (08:17:02, 11 January 2025)
- ML13316A325 + (08:17:03, 11 January 2025)
- ML13316A318 + (08:17:04, 11 January 2025)
- ML13316A317 + (08:17:05, 11 January 2025)
- HNP-13-108, Relief Request Accumulator Fill Valve Piping Weld, Inservice Inspection Program- Third Ten-Year Interval + (08:17:06, 11 January 2025)