Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148D842 + (16:59:27, 11 December 2024)
- ML20148D843 + (16:59:27, 11 December 2024)
- ML20148D841 + (16:59:28, 11 December 2024)
- ML20148D839 + (16:59:29, 11 December 2024)
- ML20148D834 + (16:59:30, 11 December 2024)
- ML20148D836 + (16:59:30, 11 December 2024)
- ML20148D833 + (16:59:31, 11 December 2024)
- ML20148D831 + (16:59:31, 11 December 2024)
- PNO-III-88-023, on 880317,vacuum Pump on Testing Device Blew Up,Releasing 50 Ci Kr-85 Into Environ.No Injuries Reported. One Employee Had Minor Contamination on Leg from Kr-85 Contaminated Oil from Damaged Pump + (16:59:32, 11 December 2024)
- ML20148D826 + (16:59:33, 11 December 2024)
- ML20148D825 + (16:59:33, 11 December 2024)
- NSD-NRC-97-5151, Forwards W Responses to NRC RAI Re AP600 Level 1 PRA + (16:59:34, 11 December 2024)
- ML20148D815 + (16:59:35, 11 December 2024)
- ML20148D817 + (16:59:35, 11 December 2024)
- ML20148D814 + (16:59:36, 11 December 2024)
- ML20148D810 + (16:59:37, 11 December 2024)
- ML20148D808 + (16:59:37, 11 December 2024)
- PNO-III-88-024, on 880317,moisture Density Gauge Lost from Tail Gate of Licensee Vehicle & Returned by Private Citizen. Device Not Placed in Storage Container & Secured to Truck Bed.Radiation Sources in Shielded Position But Not Locked + (16:59:38, 11 December 2024)
- ML20148D804 + (16:59:38, 11 December 2024)
- 05000269/LER-1987-013-04, :on 871119,containment Isolation Valve IN-106 Opened in Violation of Tech Spec 3.6.1.Caused by Personnel Error.Valve Closed,Procedures Reviewed & Senior Reactor & Nuclear Equipment Operator Counseled + (16:59:41, 11 December 2024)
- ML20148D799 + (16:59:42, 11 December 2024)
- ML20148D800 + (16:59:42, 11 December 2024)
- ML20148D797 + (16:59:43, 11 December 2024)
- IR 05000334/1997002 + (16:59:58, 11 December 2024)
- ML20148D792 + (16:59:59, 11 December 2024)
- ML20148D790 + (17:00:01, 11 December 2024)
- ML20148D785 + (17:00:02, 11 December 2024)
- ML20148D786 + (17:00:02, 11 December 2024)
- ML20148D781 + (17:00:03, 11 December 2024)
- ML20148D779 + (17:00:04, 11 December 2024)
- ML20148D772 + (17:00:05, 11 December 2024)
- ML20148D775 + (17:00:05, 11 December 2024)
- ML20148D768 + (17:00:06, 11 December 2024)
- ML20148D765 + (17:00:07, 11 December 2024)
- ML20148D761 + (17:00:07, 11 December 2024)
- ML20148D757 + (17:00:08, 11 December 2024)
- ML20148D751 + (17:00:09, 11 December 2024)
- ML20148D746 + (17:00:10, 11 December 2024)
- ML20148D741 + (17:00:11, 11 December 2024)
- ML20148D737 + (17:00:13, 11 December 2024)
- PNO-II-80-114, on 800623,stop Work Order Was Issued for Earthfill Placement Around Emergency Raw Cooling Water Spray Pond.Order Was Issued Because of Region 2 Concerns Re Performance of QC Program.Immediate Action Ltr to Be Issued + (17:00:14, 11 December 2024)
- ML20148D734 + (17:00:14, 11 December 2024)
- ML20148D731 + (17:00:15, 11 December 2024)
- PNO-III-80-163, on 800903,two FBI Agents Plan Site Visit Re Grand Jury Probe of Improper Reporting & Repair of Concrete Imperfections.Region 3 Resident Inspector Will Accompany Agents During Visit + (17:00:15, 11 December 2024)
- PNO-III-80-170, on 800904,efforts to Remove Bolts from Steam Generator Upper Supports Resulted in Breaking Two Bolts. Ultrasonic Examination of All of Bolts Identified Addl Defects.Cause Could Be Stress Corrosion Cracking + (17:00:16, 11 December 2024)
- ML20148D727 + (17:00:17, 11 December 2024)
- PNO-III-80-169A, since 800905,extensive Investigations by Region 3 & Util Personnel Into Allegations of Radioactive Release Has Not Determined Whether Actual Release of Low Level Radioactive Water Occurred + (17:00:19, 11 December 2024)
- PNO-III-80-164, on 800902,licensee Found Leakage from 10-inch Core Spray Piping Inside Drywell.Two Welds in a Loop Have Seepage & One Weld in B Loop Has Visible Crack.Unit Is in Refueling Outage + (17:00:19, 11 December 2024)
- ML20148D722 + (17:00:21, 11 December 2024)
- PNO-III-80-164A, on 800919,no Addl Cracking in Core Spray Piping Has Been Identified Other than Pipe Cracks Previously Identified.Licensee Intends to Replace Defective Piping Elbows W/Different Matl + (17:00:22, 11 December 2024)
- ML20148D721 + (17:00:22, 11 December 2024)
- ML20148D716 + (17:00:23, 11 December 2024)