ML20148D800

From kanterella
Jump to navigation Jump to search
Forwards Amend 26 to Facil Oper Lic R-28 Revising Tech Specs as Requested in W/Safety Evaluation
ML20148D800
Person / Time
Site: University of Michigan
Issue date: 10/13/1978
From: Reid R
Office of Nuclear Reactor Regulation
To: Kerr W
MICHIGAN, UNIV. OF, ANN ARBOR, MI
Shared Package
ML20148D805 List:
References
NUDOCS 7811060013
Download: ML20148D800 (2)


Text

- - - - __~___ -__ _-__ __

f S UNIT E D ST ATES

  • - /t NUCLE AR REGULATORY COMMisslON -

W ASHINGT ON, D. C. 20555 f,r & t, y October 13, 1978 (f;,gJ{g y

%.% ...+ f -

Docket No.: 50-2 Dr. William F. Kerr, Director Michigan tiemorial - Phoenix Project The University of Michigan Phoenix Memorial Laboratory North Campus Ann Arbor, Michigan 48105

Dear Dr. Kerr:

The Commission has issued the enclosed Amendment No. 26 to Facility The amend-Operating License No. R-28 for the Ford Nuclear Reactor.

ment consists of chany:s to the Technical Specifications in response to your application dated June 27, 1978 and supplemental information dated September 14, 1978, and September 28,1978, The amendment changes the Technical Specifications related to the maximum authorized power level for the Ford Nuclear Reactor when 10-plate fuel assemblies from the pennsylvania State University Research Reactor are utilized in the east, west and south fringe locations of the reactor core.

Some of your proposed Technical Specifications have been modified to meet our requirements. These modifications have been discussed with and accepted by your staff.

A copy of the Safety Evaluation is also enclosed.

Sincerely,

- e/ .

9y("j/

O Robert W. Reid, Chief

/ */2. b %Q l.-

Operating Reactors Branch #4 Division of Operating Reactors

Enclosures:

1. Amendment No. 26 . _
2. Safety Evaluation cc w/ enclosures: See next page

> W1106 col 3

The University of Michigan ,

cc w/ enclosure (s):

Attorney General Department of Attorney General 424 West Ottawa Street Lansing, flichigan 48913 cc w/ enclosure (s) and incoming dtd.: 9/14 & 9/28/78 Office of the Governor Room 1 - Capitol Building Lansing, liichigan 48913 I

9'

_