Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 1CAN109401, Monthly Operating Rept for Sept 1994 for ANO Unit 1 + (14:34:19, 11 December 2024)
- ML20149G293 + (14:34:20, 11 December 2024)
- SVP-94-048, Forwards Response to Violations Noted in Insp Repts 50-456/94-18 & 50-457/94-18.Response Withheld + (14:34:20, 11 December 2024)
- ML20149G291 + (14:34:21, 11 December 2024)
- PY-CEI-NRR-1871, Monthly Operating Rept for Sept 1994 for Perry Nuclear Power Plant + (14:34:22, 11 December 2024)
- ML20149G289 + (14:34:22, 11 December 2024)
- ML20149G285 + (14:34:23, 11 December 2024)
- ST-HL-AE-2500, Application for Amend to License NPF-71,revising Tech Spec 3.5.3.1 to Clarify Limiting Condition for Operation for High Head Safety Injection Pumps in Mode 4.Fee Paid + (14:34:24, 11 December 2024)
- 2CAN109403, Monthly Operating Rept for Sept 1994 for ANO Unit 2 + (14:34:25, 11 December 2024)
- NRC-94-0085, Monthly Operating Rept for Sept 1994 for Fermi 2 + (14:34:26, 11 December 2024)
- ML20149G281 + (14:34:26, 11 December 2024)
- ML20149G279 + (14:34:28, 11 December 2024)
- ML20149G277 + (14:34:29, 11 December 2024)
- ML20149G276 + (14:34:30, 11 December 2024)
- BVY-94-101, Monthly Operating Rept for Sept 1994 for Vermont Yankee Nuclear Power Station + (14:34:31, 11 December 2024)
- ML20149G273 + (14:34:32, 11 December 2024)
- ML20149G271 + (14:34:33, 11 December 2024)
- ML20149G272 + (14:34:33, 11 December 2024)
- ML20149G270 + (14:34:34, 11 December 2024)
- ML20149G269 + (14:34:35, 11 December 2024)
- ML20149G266 + (14:34:35, 11 December 2024)
- ML20149G265 + (14:34:36, 11 December 2024)
- BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 + (14:34:37, 11 December 2024)
- 05000327/LER-1988-005, :on 880116,turbine Bldg Sump Release Line Radiation Monitor Inappropriately Declared Operable on 880115 Resulting in Failure to Take Grab Samples for 25.5 H. Caused by Operator Error.Grab Samples Resumed + (14:34:39, 11 December 2024)
- B16566, Responds to RAI Re Erosion of Cement from Underlying Porous Concrete Drainage Sys + (14:34:40, 11 December 2024)
- ML20149G261 + (14:34:41, 11 December 2024)
- ML20149G260 + (14:34:42, 11 December 2024)
- ML20149G259 + (14:34:42, 11 December 2024)
- 05000370/LER-1988-001-01, :on 880112,steam Generator Level Deviation Alarm Received in Control Room.Caused by Design & Const/ Installation Deficiency.Operational Protection Sys Implemented Reactor Trip Recovery Procedure + (14:34:44, 11 December 2024)
- ML20149G257 + (14:34:46, 11 December 2024)
- ST-HL-AE-2503, Monthly Operating Rept for Jan 1988 + (14:34:47, 11 December 2024)
- ML20149G255 + (14:34:48, 11 December 2024)
- ML20149G254 + (14:34:49, 11 December 2024)
- ML20149G252 + (14:34:49, 11 December 2024)
- ML20149G251 + (14:34:50, 11 December 2024)
- ML20149G248 + (14:34:54, 11 December 2024)
- ML20149G249 + (14:34:54, 11 December 2024)
- ML20149G246 + (14:34:56, 11 December 2024)
- ML20149G245 + (14:34:59, 11 December 2024)
- 05000461/LER-1988-003, :on 880114,containment Monitoring Sys Containment Isolation Valves Isolated.Caused by Malfunction of Process Radiation Monitor.Procedures Revised to Require Addl Check Source Valve Confirmation + (14:35:01, 11 December 2024)
- ML20149G243 + (14:35:02, 11 December 2024)
- ML20149G242 + (14:35:03, 11 December 2024)
- ML20149G240 + (14:35:04, 11 December 2024)
- ML20149G239 + (14:35:05, 11 December 2024)
- ML20149G238 + (14:35:06, 11 December 2024)
- ML20149G237 + (14:35:06, 11 December 2024)
- ML20149G235 + (14:35:10, 11 December 2024)
- ML20149G232 + (14:35:11, 11 December 2024)
- ML20149G231 + (14:35:12, 11 December 2024)
- ML20149G229 + (14:35:12, 11 December 2024)
- TAC:52159 + (14:35:13, 11 December 2024)
- ML20149G228 + (14:35:14, 11 December 2024)