Text
-
M
== ENTERGY PcTle """ "*""*'
=
Krilona LA 7006G Ter 504 739 6774 R. F. Burski Daur<.
Nuclew SaMy VAMUf f )ft13 W3F1-94-0175 A4.05-PR October 12, 1994-U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report r
Gentlemen:
Attached is the subject' monthly report which covers the operating statistics for the month of September, 1994. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, i
/
,lIn
)
R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc:
L.J. Callan (NRC Region IV)
R.B. McGehee
-N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INP0 Records Center)
- NRC Resident ' Inspectors Office 941017o283 940930 DR ADOCK 0500 2
s.'
P 3
i NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 SEPTEMBER 1994 The unit operated at an average reactor power of 99.6% and experienced no shutdowns or significant power reductions during the period.
^
)
8 PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the rnonth of September 1994, there were no pressurizer safety valve failures or challenges.
f
OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: OCTOBER,1994 COMPLETED BY:
T.S. BECKER TELEPHONE: 504-739-6683 OPERATING STATUS 1.
Reporting Period: September,1994 Gross Hours in Reporting Period:.220_
2.
Currently Authorized Power Level (MWl): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 I
3.
Pcwer Level to which Restricted (if any) (Net MWe): N/A 4.
Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE 5.
Number of Hours Reactor was Critical r
720.0 5,413.8 66,513.8 6.
Reactor Reserve Shutdown Hours 7.
Hours Generator was On-line 720.0 5,347.1 65,635.3 9
8.
Unit Reserve Shutdown Hours 9.
Gross Thermal Energy Generated (MWH) 2,430,858 17,828,232 216,685,709
- 10. Gross Electrical Energy Generated (MWH) 798,130 5.839,270 72,260,050
- 11. Net Electrical Energy Generated (MWH) 761,839 5,559,960 68,870,405
- 12. Reactor Service Factor 100.0 82.6 84.1
- 13. Reactor Availability Factor 100.0 82.6 84.1
- 14. Unit Service Factor 100.0 81.6 83.0
- 15. Unit Availability Factor 100.0 81.6 83.0
- 16. Unit Capacity Factor (using MDC) 98.4 79.0 81.0
- 17. Unit Capacity Factor (Using DER) 95.8 76.9 78.9
- 18. Unit Forced Outage Rate 0.0 0.6 3.3
(l j
' OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: OCTOBER,1994 COMPLETED BY:
T.S. BECKER TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Con't) 19.
Shutdowns Scheduled over next 6 Months (type, date and duration of each):
N/A 20.
If Shutdown at end of report period, estimated date of startup:
21.
Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
- 22. Hours in Reporting Period 720.0 6,551.0 79,056.0
- 23. Unit Forced Outage Hours 0.0 31.5 2,210.2 24.
Nameplate Rating (Gross MWe): 1200 25.
If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons: N/A e
k f
1 1
l AVERAGE DAILY UNIT POWER LEVEL l.
DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: OCTOBER,1994 COMPLETED BY:
T.S. BECKER TELEPHONE: 504-739-6683 MONTH SEPTEMBER.1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET)
(MWe-NET) 1 1057 17 1064 2
1054 18 1064 3
1058 19 1065 4
1059 20 1065 5
1059 21 1065 6
1059 22 1064 7
1059 23 1065 8
1058 24 943 9
1059 25 1064 10 1061 26 1066 11 1060 27 1067 12 1059 28 1067 13 1059 29 1068 14 1061 30 1067 15 1064 31 N/A 16 1064 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
.e UNIT SHUTDOWNS AND POWER REDUCTIONS
~
DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: OCTOBER 1994 COMPLETED BY:
T.S. BECKER TELEPHONE: 504-739-6683 REPORT FOR SEPTEMBER.1994 Type Method of Shuttino F = Forced Duration Down the Reactor o.
Cause, Comments and Number Date S = Scheduled (Hours)
Reason (1)
Reducino Power (2)
Corrective Actions NONE (1) REASON (2) METHOD A=
Equipment Failure (explain) 1=
Manual B=
Maintenance or Test 2=
Manual Scram C=
Refueling 3=
Regulatory Restriction 4=
Continuation from Previous Period E=
Operator Training and 5=
Power Reduction License Examination 6=
Other (explain)
F=
Administrative G=
Operational Error (explain)
H=
Other (explain) 1 m--
-