ML20149G238
| ML20149G238 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/16/1997 |
| From: | Mcnerney T NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20149G222 | List: |
| References | |
| 755.1-3, NUDOCS 9707230068 | |
| Download: ML20149G238 (2) | |
Text
..
I l-]
Procedure and Form Change Request l [
(Sheet 1 ofi)
! U l
Section 1: Change initiation Information l
Document No.: 755.1-3 Revision No.
O Change No.
1 l
Title:
Battery Weekly Surveillance-Neutron Monitoring System Battery 1
Initiated By: T. McNerney Change Type: Intent Non Intent X Nr*du9tjngg,,ng]Q,[,
h o correct transposed words in temperature and level correction factor measurements.
l Expiration Date or Condition:
l Removed Date:
1 g
Section 2: Instructions for Entering Change Replace page 2.
Section 3: Non-Intent Change Interim Approval Section 3a. Approved by S RC or PORC Member or First une Supervisor Signature:
,/
Date:
97
~~^
~~'
Interim Approval [ f '
l l
Section 3b. Approved by Shift Manag or SRO Ucensed on Unit h[ p Date:
7 5 97 Signature:
(3 Section 4: Reviews
- v QA Reviewer Signature
- (if required)
Date:
Independent Reviewer Signature:
t h g2 L ef,tl( -
//j/py Date:
Ch1 l Nocommentsg cp-Attachment 10 from DC 3 not required NO { ~ PORC orSORC review is required.
+ Sarety Evaluation Required?
YES ifeither question is answered "YES,"
+ Environmental Review Required?
YES NO '
Section 5: Review and Approval YES NO l'une o r sun' Review Required?
Date Mg 7
d v d al i na u e:
(Common Department Procedures require Date:
l-each affected Deparunent IIcad's signatures)
Date:
Section 6: ?,PPROVAL Meeting Number: /M7-/dh h orSORC hp Appr valDate P /h) @
Chairperson Signature:
' R s
. x l
('_)
DC1, AM. 6, Ret 5, (06-0W)
Effective Date:
7/3/97 St tion Admin Procedures Group OSCAR Report u
i 9707230068 970716 l
PDR ADOCK 05000245 l
P PDR l
.. _. ~ -. -_
n Battery Weekly Surveillance-Neutron Monitoring System Battery Data and Comments i
- j
\\
BATTERYID SJpp Measurement Acceptance Criteria Value 4.2 Battery Terminal Voltage l
26 to 27 volts volts 4.4 Pilot Cell Number i
Pilot Cell Electrolyte Level and o e el es inch 4.5 Pilot Cell Measured ICV l
a 2.13 volts volts Pilot Cell Temp
%MN2A F
i Pilot Cell Measured SpGr i
Left Adjacent Cell Temp
- F
.jj, 4.7
- I Right Adjacent Cell Temp
- F i-j 4.8.1 Pilot Cell SpGrWCorrection Factor gi 4'8'2 i
Factor (Bulb-Type /ManualHydrometer Only!) -
SpGr: Corrected for Level and Temperature
(+Pil t Cell Measured SpGr 2 1.205 4.8.3 Level Correction Factor
+ Temp Correction Factor) i Comments 1,
1 Maint. Form 755.1-3 Rev.0 i
Pake 2 of 2 j