ML20149G238

From kanterella
Jump to navigation Jump to search
Rev 0,change 1 to 755.1-3, Battery Weekly Surveillance - Neutron Monitoring Sys Battery
ML20149G238
Person / Time
Site: Millstone  
Issue date: 07/16/1997
From: Mcnerney T
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20149G222 List:
References
755.1-3, NUDOCS 9707230068
Download: ML20149G238 (2)


Text

..

I l-]

Procedure and Form Change Request l [

(Sheet 1 ofi)

! U l

Section 1: Change initiation Information l

Document No.: 755.1-3 Revision No.

O Change No.

1 l

Title:

Battery Weekly Surveillance-Neutron Monitoring System Battery 1

Initiated By: T. McNerney Change Type: Intent Non Intent X Nr*du9tjngg,,ng]Q,[,

h o correct transposed words in temperature and level correction factor measurements.

l Expiration Date or Condition:

l Removed Date:

1 g

Section 2: Instructions for Entering Change Replace page 2.

Section 3: Non-Intent Change Interim Approval Section 3a. Approved by S RC or PORC Member or First une Supervisor Signature:

,/

Date:

97

~~^

~~'

Interim Approval [ f '

l l

Section 3b. Approved by Shift Manag or SRO Ucensed on Unit h[ p Date:

7 5 97 Signature:

(3 Section 4: Reviews

v QA Reviewer Signature
(if required)

Date:

Independent Reviewer Signature:

t h g2 L ef,tl( -

//j/py Date:

Ch1 l Nocommentsg cp-Attachment 10 from DC 3 not required NO { ~ PORC orSORC review is required.

+ Sarety Evaluation Required?

YES ifeither question is answered "YES,"

+ Environmental Review Required?

YES NO '

Section 5: Review and Approval YES NO l'une o r sun' Review Required?

Date Mg 7

d v d al i na u e:

(Common Department Procedures require Date:

l-each affected Deparunent IIcad's signatures)

Date:

Section 6: ?,PPROVAL Meeting Number: /M7-/dh h orSORC hp Appr valDate P /h) @

Chairperson Signature:

' R s

. x l

('_)

DC1, AM. 6, Ret 5, (06-0W)

Effective Date:

7/3/97 St tion Admin Procedures Group OSCAR Report u

i 9707230068 970716 l

PDR ADOCK 05000245 l

P PDR l

.. _. ~ -. -_

n Battery Weekly Surveillance-Neutron Monitoring System Battery Data and Comments i

j

\\

BATTERYID SJpp Measurement Acceptance Criteria Value 4.2 Battery Terminal Voltage l

26 to 27 volts volts 4.4 Pilot Cell Number i

Pilot Cell Electrolyte Level and o e el es inch 4.5 Pilot Cell Measured ICV l

a 2.13 volts volts Pilot Cell Temp

%MN2A F

i Pilot Cell Measured SpGr i

Left Adjacent Cell Temp

  • F

.jj, 4.7

I Right Adjacent Cell Temp
  • F i-j 4.8.1 Pilot Cell SpGrWCorrection Factor gi 4'8'2 i

Factor (Bulb-Type /ManualHydrometer Only!) -

SpGr: Corrected for Level and Temperature

(+Pil t Cell Measured SpGr 2 1.205 4.8.3 Level Correction Factor

+ Temp Correction Factor) i Comments 1,

1 Maint. Form 755.1-3 Rev.0 i

Pake 2 of 2 j