Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151M998 + (10:48:02, 11 December 2024)
- W3P85-3269, Responds to NRC 851023 & 1105 Telcons Re Violations Noted in Insp Repts 50-382/85-04 & 50-382/85-27.Corrective Actions:Util Will Submit Responses within 30 Days of Issue Date of Insp Rept 50-382/85-27 + (10:48:03, 11 December 2024)
- ML20151M995 + (10:48:03, 11 December 2024)
- ML20151M991 + (10:48:04, 11 December 2024)
- ML20151M987 + (10:48:05, 11 December 2024)
- ML20151M984 + (10:48:05, 11 December 2024)
- ML20151M979 + (10:48:07, 11 December 2024)
- ML20151M976 + (10:48:11, 11 December 2024)
- ML20151M973 + (10:48:12, 11 December 2024)
- NRC-88-0176, Forwards Endorsements 18 & 122 to Maelu Policy MF-120 & Nelia Policy NF-92,respectively.W/o Encl + (10:48:13, 11 December 2024)
- ML20151M965 + (10:48:14, 11 December 2024)
- IR 05000382/1985004 + (10:48:15, 11 December 2024)
- ML20151M960 + (10:48:15, 11 December 2024)
- ML20151M957 + (10:48:16, 11 December 2024)
- ML20151M950 + (10:48:20, 11 December 2024)
- ML20151M943 + (10:48:21, 11 December 2024)
- ML20151M937 + (10:48:22, 11 December 2024)
- IR 05000277/1988009 + (10:48:23, 11 December 2024)
- 0CAN068808, Responds to Violations Noted in Insp Repts 50-313/87-31 & 50-368/87-31 on 870921-25.Encl Corrective Actions Withheld (Ref 10CFR2.790) + (10:48:24, 11 December 2024)
- ML20151M923 + (10:48:27, 11 December 2024)
- ML20151M917 + (10:48:28, 11 December 2024)
- ML20151M921 + (10:48:28, 11 December 2024)
- ML20151M916 + (10:48:29, 11 December 2024)
- ML20151M903 + (10:48:32, 11 December 2024)
- 05000267/LER-1985-026, :on 851123,circulator D Trip Logic Actuated Due to Circulator Seal Malfunction.Caused by Leakage of High Pressure Separator Water Into buffer-midbuffer Differential Pressure Sensor Lines.Leaking Valves Repaired + (10:48:34, 11 December 2024)
- ML20151M899 + (10:48:35, 11 December 2024)
- ML20151M894 + (10:48:36, 11 December 2024)
- ML20151M888 + (10:48:37, 11 December 2024)
- ML20151M887 + (10:48:38, 11 December 2024)
- 05000302/LER-1985-027, :on 851123,spurious Actuation & Loss of Emergency Feedwater Occurred During Calibr of once-through Steam Generator Level Instruments.Caused by Pressure Surge. Changes to Actuation Circuitry Being Considered + (10:48:40, 11 December 2024)
- JPN-88-037, Proposed Tech Specs,Deleting Cycle 8 Re Discharged Fuel & Adding Cycle 9 to Reduce Fuel Cladding Integrity Safety Limit + (10:48:41, 11 December 2024)
- ML20151M880 + (10:48:42, 11 December 2024)
- ML20151M875 + (10:48:43, 11 December 2024)
- ML20151M869 + (10:48:44, 11 December 2024)
- ML20151M865 + (10:48:45, 11 December 2024)
- 05000302/LER-1985-026, :on 851122,feedwater Transient Resulted in Emergency Feedwater Initiation & Control (EFIC) Sys Actuation & Reactor Trip on High RCS Pressure.Further Training on EFIC Sys Provided to Operators + (10:48:47, 11 December 2024)
- ML20151M860 + (10:48:49, 11 December 2024)
- ML20151M855 + (10:48:50, 11 December 2024)
- ML20151M854 + (10:48:51, 11 December 2024)
- ML20151M845 + (10:48:52, 11 December 2024)
- 05000272/LER-1985-013-02, :on 851122,equipment Operator Inadvertently Deenergized Control Power for Centrifugal Charging Pump 12 Resulting in Loss of Two ECCS Subsystems.Caused by Operator Error.Operator Counseled + (10:48:54, 11 December 2024)
- ML20151M840 + (10:48:55, 11 December 2024)
- ML20151M834 + (10:48:56, 11 December 2024)
- ML20151M828 + (10:48:57, 11 December 2024)
- ML20151M825 + (10:48:59, 11 December 2024)
- ML20151M820 + (10:48:59, 11 December 2024)
- ML20151M816 + (10:49:00, 11 December 2024)
- ML20151M810 + (10:49:01, 11 December 2024)
- ML20151M798 + (10:49:38, 11 December 2024)
- IR 05000458/1988006 + (10:49:43, 11 December 2024)
- ML20151M789 + (10:49:44, 11 December 2024)