ML20151M916
| ML20151M916 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/16/1988 |
| From: | Ronald Bellamy NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20151M919 | List: |
| References | |
| NUDOCS 8804250159 | |
| Download: ML20151M916 (2) | |
See also: IR 05000277/1988009
Text
-
-
- .-
,-
.
'
,
.
,-
.
1
APR 1619&8
,
Docket Nos.
50-277
License Nos. DPR-44
50-278
Philadelphia Electric Company
ATTN: Mr. J. S. Kemper, Sr.
Vice President
Nuclear
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject: Combined Inspection Report Nos. 50-277/88-09 and 50-278/88-09
A routine safety inspection of your emergency preparedness program was
conducted by Mr. C. Gordon of this office on February 29 through March 3,
1988 at the Peach Bottom Atomic Power Station, Delta, Pennsylvania.
Discussions of our findings were held by Mr. Gordon with Mr. D. Smith and
other members of your statf at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
inspection report which is enclosed. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector.
Based upon the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Appendix A.
This
violation has been categorized by severity level in accordance with the
"General Statement of Policy and Procedure for NRC Enforcement Actions",10 CFR Part 2, Appendix C (Enforcement Policy 1987).
You are required to
respond to this letter and in preparing your response, you should follow the
instructionsinAppendlxA.
The response directed by this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
)\\
O@O4250159 880416
k
"
.
ADOCK 05000277
)
Q
G
=
'
..
,
.
,
'
..
,
.
0 00
Philadelphia Electric Company
2
-
MNgnedBT.
Racald R. Bellamy
Ronald R. Bellamy, Chief,
Facilities Radiological Safety
,"n
and Safeguards Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Combined Inspection Report Nos. 50-277/88-09 and
50-278/88-09
'
cc w/ enc 1:
E. C. Kistner, Chairman, Nuclear Review Board
Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
Dickinson M Smith, Vice President, Peach Bottom Atomic Power Station
J. W. Gallagher, Vice President, Nuclear Services
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic
Electric
Peach Bottom Atomic Power Station
John F. Franz, Plant Manager,(Without Report)
Troy B. Conner ,Jr., Esquire
EugoneJ.Bradiey, Esquire,AssistantGeneralCounsel
Thomas Magette, Power Plant Siting, Nuclea)r Evaluations
Raymond L. Hovis, Esquire (Without Report
W. M. Alden, Director,. Licensing Section
Dcris Poulsen, Secretary of Harford County Council
PDR)
Public Document Room (Room (LPDR)
Local Public Document
Nuclear Safety Information Center (NSIC)
NRC Resident Ins 3ector
Commonwealth of )ennsylvania
n
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
Robert J. Bores, DRSS
Co[klin
0/
k
CCr
Lazar s
Bellamy
Gordon
4/g/88
4/g/88
4/[/88
4/q/88
0FFICIAL RECORD COPY
v
.,
,
+ . , - --
, . ,
. - - - . -
,,,
- - ,
, ,- -..
. - ---- .
..