Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151U042 + (10:03:26, 11 December 2024)
- 05000315/LER-1985-057, :on 851025,reactor Trip Signal Generated When Power Range Instruments Taken from Svc to Allow Installation of Design Change.Caused by Technician & Supervisor Error. Personnel Counseled + (10:03:27, 11 December 2024)
- ML20151U040 + (10:03:28, 11 December 2024)
- ML20151U039 + (10:03:29, 11 December 2024)
- ML20151U036 + (10:03:30, 11 December 2024)
- ML20151U037 + (10:03:30, 11 December 2024)
- ML20151U035 + (10:03:31, 11 December 2024)
- 05000458/LER-1985-061, Corrected Ltr Forwarding LER 85-061-00.Tracking Number Changed to RBG-23041 + (10:03:32, 11 December 2024)
- ML20151U032 + (10:03:32, 11 December 2024)
- ML20151U031 + (10:03:33, 11 December 2024)
- ML20151U030 + (10:03:33, 11 December 2024)
- ML20151U029 + (10:03:34, 11 December 2024)
- ML20151U026 + (10:03:35, 11 December 2024)
- ML20151U028 + (10:03:35, 11 December 2024)
- ML20151U025 + (10:03:36, 11 December 2024)
- ML20151U024 + (10:03:38, 11 December 2024)
- 05000346/LER-1985-005-01, :on 851230,12 Boot Seal Seams Determined to Have Inadequate Overlap.Caused by Inadequate Procedure. Procedure MP 1700.29, Fabrication Installation of Flexible Pressure & Fire Seals Generated + (10:03:40, 11 December 2024)
- ML20151U020 + (10:03:41, 11 December 2024)
- ML20151U019 + (10:03:41, 11 December 2024)
- ML20151U018 + (10:03:42, 11 December 2024)
- ML20151U017 + (10:03:43, 11 December 2024)
- ML20151U015 + (10:03:46, 11 December 2024)
- ML20151U012 + (10:03:47, 11 December 2024)
- ML20151U013 + (10:03:47, 11 December 2024)
- ML20151U011 + (10:03:48, 11 December 2024)
- BVY-98-130, TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4)) + (10:03:49, 11 December 2024)
- IR 05000309/1985037 + (10:03:58, 11 December 2024)
- U-600427, Final Deficiency Rept 55-85-14 Re Torquing of Cover Plate Screws on Namco EA170 & EA180 Limit Switches.Initially Reported on 851227.Field Engineering Change Notices 13714 & 13715 Issued to Provide Addl Engineering Instructions + (10:03:59, 11 December 2024)
- ML20151U006 + (10:03:59, 11 December 2024)
- ML20151U003 + (10:04:01, 11 December 2024)
- ML20151U002 + (10:04:02, 11 December 2024)
- ML20151T999 + (10:04:03, 11 December 2024)
- ML20151U000 + (10:04:03, 11 December 2024)
- 05000346/LER-1988-016, :on 880713,walkdown of Relay Cabinets Identified Nonconforming Electrical Cable Separation Conditions.Caused by Poor Control of Design Implementation & Designer/Const Interface + (10:04:05, 11 December 2024)
- ML20151T995 + (10:04:06, 11 December 2024)
- ML20151T994 + (10:04:06, 11 December 2024)
- ML20151T993 + (10:04:07, 11 December 2024)
- ML20151T988 + (10:04:08, 11 December 2024)
- ML20151T991 + (10:04:08, 11 December 2024)
- ML20151T985 + (10:04:09, 11 December 2024)
- ML20151T983 + (10:04:10, 11 December 2024)
- ML20151T982 + (10:04:10, 11 December 2024)
- ML20151T978 + (10:04:11, 11 December 2024)
- ML20151T976 + (10:04:12, 11 December 2024)
- RBG-28432, Monthly Operating Rept for Jul 1988 for River Bend Station Unit 1 + (10:04:12, 11 December 2024)
- ML20151T974 + (10:04:13, 11 December 2024)
- ML20151T973 + (10:04:14, 11 December 2024)
- ML20151T972 + (10:04:15, 11 December 2024)
- 05000324/LER-1985-002, :on 850215,HPCI Sys & RHR LPCI Loop B Inoperable.Caused by Mispositioned HPCI Pump Discharge Valve E41-F006 & switch,E11-DPIS-N021B,outside Calibr Tolerances. DPIS-N021B Calibr & F006 Repositioned + (10:04:16, 11 December 2024)
- ML20151T969 + (10:04:17, 11 December 2024)
- ML20151T967 + (10:04:18, 11 December 2024)