Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155K464 + (01:49:37, 11 December 2024)
- ML20155K462 + (01:49:38, 11 December 2024)
- ML20155K461 + (01:49:38, 11 December 2024)
- ML20155K460 + (01:49:39, 11 December 2024)
- ML20155K458 + (01:49:40, 11 December 2024)
- 05000498/LER-1988-021, :on 880224,ESF Actuation Due to Inverter Failure.Caused by Dc to Dc Converter Assembly Failure.Plant Engineering Dept Reviewed Results of Vendor Failure Analysis.Failures Identified as Random + (01:49:41, 11 December 2024)
- ML20155K455 + (01:49:42, 11 December 2024)
- ML20155K454 + (01:49:46, 11 December 2024)
- ML20155K453 + (01:49:47, 11 December 2024)
- ML20155K451 + (01:49:49, 11 December 2024)
- ML20155K450 + (01:49:49, 11 December 2024)
- ML20155K448 + (01:49:50, 11 December 2024)
- ML20155K447 + (01:49:51, 11 December 2024)
- ML20155K443 + (01:49:52, 11 December 2024)
- ML20155K444 + (01:49:52, 11 December 2024)
- ML20155K442 + (01:49:53, 11 December 2024)
- 05000482/LER-1986-025, :on 860422,both Trains of Safety Injection Flow to RCS Cold Legs Disabled by Closure of Valve EM HV-8835. Caused by Personnel Failing to Recognize Plant Condition. Retraining on ECCS Manipulations Planned + (01:49:55, 11 December 2024)
- ML20155K439 + (01:49:56, 11 December 2024)
- IR 05000334/1998007 + (01:49:57, 11 December 2024)
- ML20155K437 + (01:49:57, 11 December 2024)
- ML20155K435 + (01:49:58, 11 December 2024)
- ML20155K431 + (01:49:59, 11 December 2024)
- ML20155K432 + (01:49:59, 11 December 2024)
- ML20155K429 + (01:50:00, 11 December 2024)
- ML20155K425 + (01:50:01, 11 December 2024)
- ML20155K421 + (01:50:06, 11 December 2024)
- ML20155K420 + (01:50:07, 11 December 2024)
- ML20155K419 + (01:50:07, 11 December 2024)
- ML20155K417 + (01:50:08, 11 December 2024)
- TXX-4827, Forwards Responses to NRC 860515 Questions Re Results Rept for Isap VII.b.2 on Valve Disassembly.No Cases of Using non-ASME Bonnet on ASME Valve Found.Valve Disassembly Accomplished Under Procedure CP-CPM-6.9 Prior to 830128 + (01:50:08, 11 December 2024)
- ML20155K416 + (01:50:33, 11 December 2024)
- 05000498/LER-1988-029, :on 880424,Tech Spec 3.0.3 Entered on Two Occasions for Total of 17 Minutes During Testing of Steam Generator Porvs.Caused by Shift Supervisor Determination Action Constituted Acceptable Entry + (01:50:49, 11 December 2024)
- ML20155K412 + (01:50:50, 11 December 2024)
- ML20155K411 + (01:50:51, 11 December 2024)
- ML20155K408 + (01:50:52, 11 December 2024)
- ML20155K406 + (01:50:53, 11 December 2024)
- ML20155K404 + (01:50:54, 11 December 2024)
- ML20155K403 + (01:50:55, 11 December 2024)
- ST-HL-AE-1667, Forwards Revised Response to NRC Question 440.57N Re Justification for MSIV Closure Logic.Rev Modifies Closure Logic to Be Consistent W/Other Westinghouse Plants.Fsar Will Be Revised When Design Change Completed + (01:50:55, 11 December 2024)
- ML20155K398 + (01:50:56, 11 December 2024)
- ML20155K396 + (01:50:56, 11 December 2024)
- NG-86-1809, Documents Commitments Made During 860513 Telcon Re Internal Wiring of Limitorque Motor Operators Covered by Equipment Qualification Program Located in Areas Subj to Harsh Conditions for Radiation Only in post-accident Situation + (01:50:57, 11 December 2024)
- ML20155K389 + (01:50:58, 11 December 2024)
- ML20155K384 + (01:50:59, 11 December 2024)
- ML20155K382 + (01:50:59, 11 December 2024)
- ML20155K378 + (01:51:00, 11 December 2024)
- ML20155K377 + (01:51:01, 11 December 2024)
- ML20155K375 + (01:51:02, 11 December 2024)
- ML20155K373 + (01:51:22, 11 December 2024)
- ML20155K369 + (01:51:23, 11 December 2024)
- ML20155K372 + (01:51:23, 11 December 2024)
- ML20155K368 + (01:51:24, 11 December 2024)