Summary of 981027 Meeting with Nei,Members of NUPIC & NRC to Present Overview of Procurement Source Evaluation Process.List of Attendees & Matls Handed Out by NUPIC During Meeting Encl
ML20155K398
Person / Time
Issue date: 11/06/1998
From: Albert R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Shankman S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9811130230
Download: ML20155K398 (27)


Text

l

, e n:

p t UNITED STATES j

g NUCLEAR REGULATORY COMMISSION 2 WASHINGTON, D.C. 30seH001

,,,,, November 6, 1998 MEMORANDUM TO: Susan F. Shankman, Deputy Director Licensing and inspection Directorate Spent Fuel Project Office Office of Nuclear Material Safety and Safegu s THROUGH: Patricia L. Eng, Chief Transportation and Storage inspection Sect' p

Spent Fuel Project Office Office of Nuclear Material Safety and Saf rds r FROM: Ronald J. Albert, Transportation and Stor ge afety in >ector Transportation and Storage inspection Section Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards

SUBJECT:

SUMMARY

OF OCTOBER 27,1998, MEETING BETWEEN THE NUCLEAR PROCUREMENT ISSUES COMMITTEE AND THE U.S. NUCLEAR REGULATORY COMMISSION STAFF On October 27,1998, a meeting was held between the Nuclear Regulatory Commission (NRC) staff, the Nuclear Energy Institute (NEl), and members of the Nuclear Procurement issues Committee (NUPIC). NUPIC met with the NRC to present an overview of its procurement source evaluation process. An attendance list is included (Attachment 1). Materials handed out by NUPIC during the meeting are also included (Attachments 2 and 3). Notification of this meeting was published on September 28,1998.

After brief introductory remarks by the NRC, NEl, and NUPlC, NUPIC presented an overview of its membership, structure, committees and working groups, objectives, and process improvements. NUPIC then provided an overview of its Dry Storage Quality Working Group (DSQG). Having recently begun audits of the processes associated with dry-cask storage,  ;

NUPIC explained its auditing program. NUPlc also provided an overview of its approaches to overseeing and monitoring dry-cask suppliers and sub-suppliers.

Following the presentation, the NRC suggested that NEl develop a standardized audit program for dry-cask storage activities. NEl noted NRC's aggestion and stated that the ultimate responsibility for such activities rests with the utilities.

9811130230 981106 PDR REVGP ERGNUMRC h

l an

/-f /(MM .

- - - - - - - - )

l f 2 No proprietary information was discussed or presented during the meeting. No regulatory decisions were requested or made.

1 Attachments: 1. Attendance List l 2. NUPIC: Nuclear Procurement issue Committee  !

l 3. Dry Storage Quality Working (Group DSQG) l l cc: W. Kane i

l Distribution:

l NRC File Center PUBLIC NMSS R/F SFPO R/F SShankman l LEKokajko PEng EEaston FSturz Document Name: a:\nupic. min. ,

To receive a copy of thle docurnent. indicate in the box: "C" = Copy without attach ent/ enclosure *E' = Copy with attachment / enclosure *N* = No i copy l OFFICE SFPO D M E SFPO lN SFPM / lC NAME RAlbert GBenningtsn PEM i DATE 11/05/98 11 4 /98 % 11///98 j OFFICIAL RECORD COPY I

l ii i

l 1

i l

I

l ATTENDANCE LIST NUCLEAR PROCUREMENTISSUES COMMITTEE /NRC MEETING OCTOBER 27,1998 NAME ORGANIZATION, TITLE TELEPHONE NO.

Ron Albert NRC/SFPO Inspector (301)415-1986 Marissa Bailey NRC/SFPO (301)415-8531 Barry Bobo Hartford Steam Boller Col (770) 396-9820 Director, Engineering Services Ken Battige NRC/SFPO (301) 415-2730 Rita Bowser Westinghouse /SF Deputy Director (202) 945-6458 Larry Campbell NRC/NRR/HOMB (301) 415-2976 Jerry Delezenski Rancho Seco (916)732-2914 G.M. Eisenberg Director, NC&S ASME (212) 591-8510 Patricia Eng NRC/ Chief, QA & Inspection Section (301) 415-8577 Ernie Farrow Hartford Steam Boiler Co. (423) 870-2769 Jim Gill WEPCO (414) 221-2824 Lynette Hendricks NEl (202) 739-8109 Wayne Hodges NRC/SFPO (301) 415-2398 Allen Hows NRC/SFPO (301) 415-3561 William F. Kane NRC/SFPO (301) 415-8500 Dennis Kierpa GPUN (973) 316-7302 Kirke Lathrop NRC/SFPO/TSIS (301) 415 8553 Eric Leeds NRC/SFPO (301) 415-8540 Thomas Matula NRC/SFPO (301)415-8563 Ron Matthews .PP&L (717)542-1789 Alam Neilson NEl (202) 739-8110 Ron Parkhill NRC/SFPO (301) 415-1376 James Pearson NRC/SFPO/TSIS (301) 415-1985 Dennis Reid NRC/SFPO (301) 415-8556 Ron Scott National Board (614) 888-8320 Susan F. Shankman NRC/SFPO (301) 415-2287 Steve Schulin The Bex Group /internet Svs (301) 762-6714 J.D. Stevenson NUPACK/Chairrnan, ASME (216) 587-3808 BPVC Section ill Div 3 John Thorp BGE/ Supervisor - Vendor Assessment (410) 495-4627 Bruce Tracey BGE (410)495 4078 William R. Ward NRC/SFPO Inspector (301) 415-8526 ATTACHMENT 1

1

  • i 4

NUPIC J

Nuclear Procurement Issues Committee

.f ATTACHMENT 2

4 Membership

. All US Nuclear Utilities

' Currently 42;'

. Six International Utilities Brazil Canada Mexico Slovenia Spain -

Sweden L

h Structure l . Steering Committee

- Chairman

- Vice Chairman

- Secretary / Treasurer

- Regional

- Representatives from the 4 NRC Defined

Regions

- Representatives from

, each Member Utility

- Committees & Working Groups l-4

- - - - , , , . . _ , , , . - , . - . , , , . - . - - - . - - , , - , , , _ - ......,,--,--,y c .-- - - - - - - - --

k Committees &

Working Groups

. Audit Committee

. Survey Committee

. Nuclear Fuel Committee

. Com aliance Committee 1

. Vencor Interface Committee

. Dry Cask Storage Working Grou a

, ---- - - ---,-,s, --r - - ----

[

j..

l l Objectives i

i

. Cooperative Program for the

! Evaluation of Supplier j Performance l

. Perform Joint Audits / Surveys

. Share Reports with all Mem 3ers

. Monitor Su aplier Performance

e . l e

.f Objectives e Forum for Discussion of Procurement QA Issues l

. Exchange performance information

. Discuss concerns relative to Regulatory information

. Assist Su apliers in resolving inc ustry concerns .

6 I

i.- l l '

I Objectives i

l . Interface for Procurement QA l l Activities i i

i  :

l . Maintain interface with Industry Groups '

i i

l

! . Interface with NEl to coordinate communication l and dialogue with NRC 1

l- . Maintain an interface with NEl l for communicating industry j positions regarding l Procurement QA issues i

I Process Improvements

. Web Page (www.NUPIC.com)

. On-Line Database

. Electronic Communication I

i

, , , . - , -r, -

i l

t l

1 i,

s i

i Dry Storage Quality Working Group (DSQG) 7 i

i 4

?

i i

4 i

i

.g ATTACIPfENT 3 DSQGNRCI. DOC ev 4 es we -s v % -----ggg 45+gw egy -g g-wy = +9 u % sw7 y et$ y-= ewd9---sei 9 g9-g-pgwpN1r

  • y y- ge '--9% y-i*v-Naqq 9 umy-g-Neme 's 9914 m 1 m w N-w-*=$-l>-~e44 gt elvs a 'T$ _

l Background-4 i e In mid-December 1997, Comed and Wisconsin Electric jointly sponsored a

! request for a collaborative effort to form a utility working group to address l quality and performance related issues related to Dry Cask Storage activities.

i 1

  • Recent industry events in this arena demonstrate a need for the quality
orgamzations of the nuclear utility industry to develop and implement a j unified, structured approach to overviewing and monitoring dry cask storage i suppliers and sub-suppliers.

i i

1 4

DSQGNRCI. DOC 2

_ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ . _ . - _ _ _ _ . _ _ _ _ _ _ . - - _ . _ _ _ . . _ _ _ _ . - _ - ...______.m_._-______ _ _ ._- ._ _ _ _ _ _ _ . _ ___. ____ _ _ _ _ , _ __ _ . . - _ _ _ -...- <---ea -ww-+se e+ -m__-_ __m-

i i

i i

l Purpose / Benefits of Formation of DSQG 1

3 j e Standardized DFS Checklist for Review of Suppliers

  • Unified Supplier Oversight Through Resource Sharing
  • Integration & Sharing of Lessons Learned l

l

  • United Utility Approach to Address Dry Storage Issues 4
  • Interface with Existing Owners Groups l

!

  • Formalized Group Under NUPIC 1

l

  • Increased Communication Among Utilities / Suppliers NEI/NRC i

l

  • Cross Pollination ofIdeas, Techniques, Lessons Leamed I

DSQGNRCl. DOC 3

i i

! Charter

The Dry Storage Quality Group is committed to promoting public health &

! safety by: Improving the quality of spent fuel dry cask storage and l transportation systems in support ofits nuclear electric utility membership.

]

I DSQGNRCI. DOC.- 4

i l t

i i

! l

Working Group Progress Checklist Development
  • Standards Applicable to DFS Identified / Incorporated
  • NUPIC Checklist used as starting point, questions added in Design &

Fabrication

  • Section Based on NRC Inspection Module for Management Assessment
  • Auditor Guidance Document in Draft Form
  • Endorsement of Checklist by DSQG Members to Use as Draft for Audits
  • InitialInput from DFS Designers Incorporated ,

DSQGNRCI. DOC 5

I l

5

Working Group Progress .

1

) Industry Lessons Learned

. Utilize PGE's Lessons Learned Document as a Baseline i

e Evaluation of the NUPIC Web-Site for Lessons Learned Information 1

. Compile Past Problems and Incorporate Accordingly i

  • Communication of Utility Issues E

h 4

DSQGNRCI. DOC 6

I Working Group Progress Administrative

  • Meeting Minutes Issued for all Meetings

! e Procedural Needs Identified

  • NEIInvolvement with Working Group Initiated
  • Joint Audits of Designers planned -
  • Sample Project Plan Distributed 1

. I'

  • Development of Utility Residents / Skills List Started 4

I DSQGNRCI. DOC 7

4 Joint Audits Scheduled .

1. Holtec ----------------August 10-14,1998 l 2.Transnuclear----------September 22-25,1998 i

i

3. NAC------------------- 1999 i
4. BNFL------------------ 1999

~

4 5.Transnuclear-West--- 1999

6. Westinghouse--------- 1999 -

i, 1

i I

s 1

i 8 DSQGNRCl. DOC

! l i

l  :

\

Schedeling/ Scoping of DSQG Audits .

l

  • Product Life Cycle i

l

  • Utility Project Status l
  • Utility Involvement With Designer / Fabricator I i i

i $

l 9

4 i

DSQGNRCI. DOC 9

i l

Product Life. Cycle .

! e Design Concept

  • Formalization of Design / Design Basis l

i e Finalize SAR I e Submittal of RAIs e NRC SER Finalized /C of C i e Fabrication Processes Defined

) e Beginning of Fabrication

e Fabrication Issues

)

  • NRC Inspections '
  • Product Event
  • Product / Process Mature -

t

  • Product Outmoded i e Product Unloaded / Shipped j

i l DSQGNRCI. DOC 10 i ,

I g

Joint Utility Audits

  • Performance Based
  • Concentrating on Design / Design Change, Fabrication.
  • Present Configuration Traceable to SAR/SER
  • Designer / Fabricator Interface with NRC e Design /LicenseInterface [
  • Management Controls DSQGNRCI. DOC 11

l i

l l Typical Utility Joint Audit Staffing:

  • Dependent on Utility In-Line Reviews, etc.
  • Usually Three Auditors, with Technical Support i.

I Utility Audit at Designer l Technical Specialist Thermo

! Technical Specialist Shielding l Technical Specialist Structural -

i. Technical Specialist Licensing  ;

etc.

i

Utility audit at fabricator  ;

2 Technical Specialist ASME Code ,

! Technical Specialist Welding Technical Specialist NDE etc.

DSQGNRCI. DOC 12

1 Utility Joint Audit Challenges: .

  • Utility Auditing When not Optimal for Their Project e Looking at Other Utilities Projects
  • Different Utility Requirements i

e Different Codes / Standards required j l

  • Different Designs I

DSQGNRCI. DOC 13

1 e l (

l i B

Utility Controls of Dry Fuel Storage Suppliers i

  • DSQG  ;

I e Owners Groups e UtilityInspections

  • Utility Surveillances  :

~

L e

DSQGNRCI. DOC 14

?

t h

i l Supplier Oversight Through Resource Sharing .

l.

  • Trust Each Others Expertise

! e Sharing of Lessons Learned 1

i j e Examine Potential Sharing of Resources k

I a

4 i

5 DSQGNRCI. DOC - 15

l J

(

What's Next

  • DSQG/ Designers / Fabricators /NEI e DSQG/NEI/NRC Briefings e Working Group Meeting - December e TNW Audit - January

. NUPIC Approval of Check List / Auditor Guidance Document

  • Development and Sharing of Lessons Learned -

l:

i

, i DSQGNRCI. DOC 16

. _ . . . . .