Suppls 860124 Response to Violations Noted in Const Appraisal Team Insp Rept 50-455/85-27 on 850819-30 & 0909-20.Engineering Disposition of Hunter Corp Nr 1148 Complete & Welds in Tanks & HXs Found Acceptable
ML20155K419
Person / Time
Site: Byron Constellation icon.png
Issue date: 04/09/1986
From: Ainger K
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1524K, NUDOCS 8605280143
Download: ML20155K419 (1)


Text

h Commonwealth Edison

) One First National Plaza, Chicago. Ilhnois O 7 Address Riply to. Post Office Box 767

/ Chicago;lilinois60690 April 9, 1986 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road - Region III Glen Ellyn, IL 60137 Subj ect: Byron Station Unit 2 IE Inspection Report 50-455/85-027 NRC Docket No. 50-455 Reference (a): January 24, 1986 letter from D. L. Farrar to J. G. Keppler

Dear Mr. Keppler:

Reference (a) provided Commonwealth Edison's response to the findings of the NRC Construction Appraisal Team (CAT) inspection conducted

- at Byron Station, Unit 2 on August 19-30, and September 9-20, 1985. This letter provides supplemental information concerning the response to a violation that resulted from the inspection.

Violation 2 contal:ied an item regarding undersized welds in tanks and heat exchangers. Hunter Corp. NR 1148 was issued to address the nonconforming welds. The engineering disposition of Hunter Corp. NR 1148 has beer. completed and the welds have been found acceptable.

Violation 2 also contained an item regarding fasteners for large pump -motor assemblies. Discrepancies were found regarding assembly and mounting bolts. With respect to the non-safety related positive displacement charging pump, further analysis has shown that the existing motor-to-base bolts are acceptable. Therefore, these bolts will not be replaced as originally planned. The engineering analysis of the motor end-to-pump base bolts on the RHR pumps (2RH01PA and 2RH0lPB) and the motor-to-skid bolts on centrifugal charging pump 2CVolPB has been completed. These installed bolts have also been found acceptable.

Please direct any questions you may have regarding this matter to this office.

^

Very truly yours, h

O K. A. Ainger Nuclear Licensing Administrator 1m cc: Byron Resident Inspector e