Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195C989 + (00:20:14, 11 December 2024)
- IR 05000352/1988013 + (00:20:16, 11 December 2024)
- ML20195C984 + (00:20:17, 11 December 2024)
- L-99-090, Forwards Summary Review Completed to Verify Adequacy of Design Basis Accident Thermal Overpressure Protection for BVPS Unit 2 Containment Penetrations,Per Request + (00:20:17, 11 December 2024)
- ML20195C982 + (00:20:18, 11 December 2024)
- ML20195C979 + (00:20:19, 11 December 2024)
- ML20195C977 + (00:20:20, 11 December 2024)
- 05000298/LER-1988-026, :on 880930,momentary Undervoltage Condition on Emergency Transformer Sensed,Resulting in Auto Startup of Diesel Generators 1 & 2.Cause Unknown.Engineering Evaluation to Be Completed & Necessary Mods Made Prior to Startup + (00:20:21, 11 December 2024)
- ML20195C975 + (00:20:22, 11 December 2024)
- ML20195C974 + (00:20:23, 11 December 2024)
- ML20195C973 + (00:20:24, 11 December 2024)
- ML20195C972 + (00:20:25, 11 December 2024)
- 05000298/LER-1988-025, :on 880928,Div II Primary & Secondary Containment Isolations Occurred.Caused by Coil Failure of Normally Energized Relay in Reactor & Containment Isolation Logic.Failed Relay Coil Replaced + (00:20:27, 11 December 2024)
- ML20195C968 + (00:20:28, 11 December 2024)
- ML20195C967 + (00:20:29, 11 December 2024)
- ML20195C963 + (00:20:30, 11 December 2024)
- ML20195C960 + (00:20:30, 11 December 2024)
- ML20195C958 + (00:20:31, 11 December 2024)
- ML20195C957 + (00:20:32, 11 December 2024)
- ML20195C955 + (00:20:33, 11 December 2024)
- ML20195C956 + (00:20:33, 11 December 2024)
- 3F1088-13, Forwards Addl Info Completing Util Response to NRC Bulletin 87-002,Suppls 1 & 2,including Mfg Info for safety-related Inventoried & Noninventoried Items Not Provided in Util 8807220 Ltr + (00:20:34, 11 December 2024)
- ML20195C953 + (00:20:34, 11 December 2024)
- ML20195C951 + (00:20:35, 11 December 2024)
- ML20195C948 + (00:20:36, 11 December 2024)
- ML20195C950 + (00:20:36, 11 December 2024)
- U-600552, Requests Addl Exemptions to GDC of 10CFR50,App a Based on Results of Deferral Request Contained in Initial Test Program Activities Projected for Completion After Fuel Load. Justification Encl + (00:20:37, 11 December 2024)
- ML20195C946 + (00:20:37, 11 December 2024)
- ML20195C945 + (00:20:38, 11 December 2024)
- ML20195C943 + (00:20:41, 11 December 2024)
- ML20195C944 + (00:20:41, 11 December 2024)
- ML20195C942 + (00:20:42, 11 December 2024)
- ML20195C941 + (00:20:44, 11 December 2024)
- ML20195C939 + (00:20:45, 11 December 2024)
- ML20195C938 + (00:20:46, 11 December 2024)
- AECM-86-0158, Forwards marked-up Listing of Unit 1 Schedule for Implementation of Resolved Generic Issues,Per Request + (00:20:47, 11 December 2024)
- ML20195C934 + (00:20:47, 11 December 2024)
- PNO-III-86-049A, on 860519,reactor Trip Occurred Resulting in Multiple Equipment Failures Which Hindered Operator Response Due to Previous Equipment Problems.Augmented Investigation Team Completed Review on 860525 + (00:20:48, 11 December 2024)
- ML20195C931 + (00:20:49, 11 December 2024)
- ML20195C930 + (00:20:49, 11 December 2024)
- ML20195C929 + (00:20:50, 11 December 2024)
- ML20195C926 + (00:21:02, 11 December 2024)
- ML20195C927 + (00:21:02, 11 December 2024)
- ML20195C923 + (00:21:03, 11 December 2024)
- ML20195C919 + (00:21:04, 11 December 2024)
- ML20195C918 + (00:21:05, 11 December 2024)
- NRC-88-0151, Monthly Operating Rept for May 1988 for Fermi 2 + (00:21:05, 11 December 2024)
- ML20195C914 + (00:21:06, 11 December 2024)
- PY-CEI-NRR-0468, Forwards Fees for Review of 860408 Request for Relief from Inservice Testing Program + (00:21:06, 11 December 2024)
- 05000155/LER-1988-004-01, :on 880531,determined That Lubricant in Limit Switch Assembly of Environmentally Qualified Limitorque Operators Was Different than Std Recommended by Vendor. Caused by Misinterpretation of Procedure + (00:21:10, 11 December 2024)
- AECM-86-0157, Application for Proposed Amend PCOL-86/10 to License NPF-29, Changing Tech Specs Re Ac Electrical Sources in Response to Generic Ltr 84-15.Fee Paid + (00:21:11, 11 December 2024)
- ML20195C907 + (00:21:11, 11 December 2024)