Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195G811 + (23:29:01, 10 December 2024)
- ML20195G810 + (23:29:01, 10 December 2024)
- ML20195G809 + (23:29:02, 10 December 2024)
- ML20195G808 + (23:29:02, 10 December 2024)
- ML20195G807 + (23:29:03, 10 December 2024)
- ML20195G803 + (23:29:07, 10 December 2024)
- ML20195G802 + (23:29:08, 10 December 2024)
- 05000282/LER-1988-006, :on 881027,failure to Perform Airlock Seal Test within Required Time Period as Result of Personnel Error. Caused by Failure of Reactor Operator to Identify Containment Entry of 880526.Airlock Seal Test Performed + (23:29:10, 10 December 2024)
- ML20195G798 + (23:29:11, 10 December 2024)
- ML20195G796 + (23:29:12, 10 December 2024)
- ML20195G797 + (23:29:12, 10 December 2024)
- 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed + (23:29:13, 10 December 2024)
- TXX-8851, Forwards Table Listing Revised Completion Dates for 21 Rescheduled Open Items from NRC Design Validation Program Insp Repts 50-445/88-29,50-446/88-25,50-445/87-27, 50-446/87-28,50-445/87-19 & 50-446/87-15 + (23:29:13, 10 December 2024)
- ML20195G793 + (23:29:14, 10 December 2024)
- ML20195G792 + (23:29:15, 10 December 2024)
- 05000322/LER-1988-007, :on 880528,unplanned ESF Actuations Occurred When Equipment Operator Inadvertently Opened Wrong Breaker During Tagging Operation.Caused by Personnel Error.Personnel Involved Counseled + (23:29:16, 10 December 2024)
- ML20195G790 + (23:29:18, 10 December 2024)
- ML20195G789 + (23:29:18, 10 December 2024)
- ML20195G788 + (23:29:19, 10 December 2024)
- 05000293/LER-1998-024, :on 981015,determined That CR High Efficiency Aire Filtration Sys (Crheafs) Found Outside Design Basis Due to Installation of Duct Tape on Trains a & B Crheafs Supply Fans.Installed Mechanical Seals on Crheafs Supply Fans + (23:29:26, 10 December 2024)
- 05000354/LER-1988-015, :on 880526,unanticipated Loss of Second Control Room Emergency Filtration Chiller Occurred.Caused by Component Design Deficiency.Operation Procedure Reviewed & Design Mod to Chiller Installed + (23:29:29, 10 December 2024)
- L-88-278, Forwards Rev 15 to Physical Security Plan.Change Revised Canal Barrier Integrity Insp Interval Based on NRC .Rev Withheld (Ref 10CFR2.790) + (23:29:30, 10 December 2024)
- ML20195G782 + (23:29:30, 10 December 2024)
- ML20195G780 + (23:29:31, 10 December 2024)
- B17498, Application for Amend to License DPR-65,revising FSAR Due to Increase in Radiological Consequences Caused by Changes in Assumptions Used in Updated Dose Consequences Analysis of Sgtr.Rvised FSAR Pages Encl + (23:29:32, 10 December 2024)
- ML20195G777 + (23:29:32, 10 December 2024)
- ML20195G775 + (23:29:34, 10 December 2024)
- ML20195G774 + (23:29:34, 10 December 2024)
- ML20195G773 + (23:29:35, 10 December 2024)
- ML20195G771 + (23:29:36, 10 December 2024)
- ML20195G766 + (23:29:37, 10 December 2024)
- ML20195G764 + (23:29:38, 10 December 2024)
- ML20195G765 + (23:29:38, 10 December 2024)
- ML20195G762 + (23:29:39, 10 December 2024)
- ST-HL-AE-2874, Forwards Revised Response to Violations Noted in Insp Repts 50-498/88-54 & 50-499/88-54.Response Addressed Addl Concerns in Insp Repts 50-498/88-61,50-499/88-61,50-498/88-72 & 50-499/88-72.Corrective Actions:Procedures Revised + (23:29:39, 10 December 2024)
- IR 05000166/1999201 + (23:29:40, 10 December 2024)
- ML20195G759 + (23:29:41, 10 December 2024)
- 05000413/LER-1988-020, :on 880520,violation of Tech Spec Occurred When PORVs & Associated Block Valves Had Only One Position Indication Channel Per Valve.Caused by Mgt Deficiency.Tech Spec Interpretation Issued + (23:29:43, 10 December 2024)
- ML20195G756 + (23:29:44, 10 December 2024)
- ML20195G753 + (23:29:45, 10 December 2024)
- ML20195G754 + (23:29:45, 10 December 2024)
- ML20195G752 + (23:29:46, 10 December 2024)
- ML20195G751 + (23:29:47, 10 December 2024)
- IR 05000461/1988008 + (23:30:29, 10 December 2024)
- ML20195G742 + (23:30:30, 10 December 2024)
- U-603110, Informs That Maint Rule Followup Insp at Clinton Power Station Is Scheduled to Start on 981214 & of Util Readiness for Insp of Maint Rule Program & Implementation at Plant + (23:30:31, 10 December 2024)
- ML20195G738 + (23:30:31, 10 December 2024)
- ML20195G735 + (23:30:32, 10 December 2024)
- ML20195G734 + (23:30:33, 10 December 2024)
- ML20195G733 + (23:30:33, 10 December 2024)
- ML20195G732 + (23:30:34, 10 December 2024)
- ML20195G730 + (23:30:34, 10 December 2024)