Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195G853 + (23:28:39, 10 December 2024)
- ML20195G851 + (23:28:40, 10 December 2024)
- ML20195G850 + (23:28:41, 10 December 2024)
- ML20195G848 + (23:28:41, 10 December 2024)
- ML20195G847 + (23:28:42, 10 December 2024)
- U-601190, Responds to NRC Re Violations Noted in Insp Rept 50-461/88-10.Lists Clarifications to Accurately Reflect Util Position on Issues Discussed at 880331 Enforcement Conference + (23:28:42, 10 December 2024)
- ML20195G844 + (23:28:43, 10 December 2024)
- ML20195G843 + (23:28:44, 10 December 2024)
- B17533, Updates & Corrects Discussion on Intervening Combustible Loads for Exemption Requested in Intake Structure. Clarification of Discussion on Intervening Combustibles in Sodium Hypochlorite Room Satisfies 10CFR50.12 + (23:28:45, 10 December 2024)
- ML20195G839 + (23:28:46, 10 December 2024)
- B13077, Forwards Response to SALP Rept 50-213/87-99.NRC Will Be Contacted Re Preoutage Presentation at Region I Ofcs Prior to 1989 Refueling & Maint Outage.Util Will Continue to Pursue Positive Initiatives in All Listed Areas + (23:28:47, 10 December 2024)
- ML20195G837 + (23:28:48, 10 December 2024)
- ML20195G835 + (23:28:48, 10 December 2024)
- 05000259/LER-1988-035-02, :on 881021,unplanned Actuation of Control Room Emergency Ventilation Sys Occurred.Caused by Procedural Inadequacy.Operating Instruction for Crev Revised to Describe How to Reset Initiation Logic + (23:28:50, 10 December 2024)
- ML20195G832 + (23:28:51, 10 December 2024)
- ML20195G831 + (23:28:52, 10 December 2024)
- ML20195G828 + (23:28:53, 10 December 2024)
- ML20195G830 + (23:28:53, 10 December 2024)
- NOC-AE-000350, Responds to GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment + (23:28:54, 10 December 2024)
- ML20195G827 + (23:28:54, 10 December 2024)
- ML20195G825 + (23:28:55, 10 December 2024)
- ML20195G824 + (23:28:56, 10 December 2024)
- ML20195G823 + (23:28:56, 10 December 2024)
- ML20195G819 + (23:28:57, 10 December 2024)
- ML20195G822 + (23:28:57, 10 December 2024)
- ML20195G818 + (23:28:58, 10 December 2024)
- TXX-8850, Responds to Notice of Violation,Item a from Insp Repts 50-445/88-20 & 50-446/88-17.Corrective Actions:Alternative Ultrasonic Digital Thickness (Ut/Dt) Being Evaluated to Eliminate Need for Removal of Primer & Paint Prior to Ut/Dt + (23:28:59, 10 December 2024)
- ML20195G817 + (23:28:59, 10 December 2024)
- TAC:55383 + (23:29:00, 10 December 2024)
- ML20195G811 + (23:29:01, 10 December 2024)
- ML20195G810 + (23:29:01, 10 December 2024)
- ML20195G809 + (23:29:02, 10 December 2024)
- ML20195G808 + (23:29:02, 10 December 2024)
- ML20195G807 + (23:29:03, 10 December 2024)
- ML20195G803 + (23:29:07, 10 December 2024)
- ML20195G802 + (23:29:08, 10 December 2024)
- 05000282/LER-1988-006, :on 881027,failure to Perform Airlock Seal Test within Required Time Period as Result of Personnel Error. Caused by Failure of Reactor Operator to Identify Containment Entry of 880526.Airlock Seal Test Performed + (23:29:10, 10 December 2024)
- ML20195G798 + (23:29:11, 10 December 2024)
- ML20195G796 + (23:29:12, 10 December 2024)
- ML20195G797 + (23:29:12, 10 December 2024)
- 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed + (23:29:13, 10 December 2024)
- TXX-8851, Forwards Table Listing Revised Completion Dates for 21 Rescheduled Open Items from NRC Design Validation Program Insp Repts 50-445/88-29,50-446/88-25,50-445/87-27, 50-446/87-28,50-445/87-19 & 50-446/87-15 + (23:29:13, 10 December 2024)
- ML20195G793 + (23:29:14, 10 December 2024)
- ML20195G792 + (23:29:15, 10 December 2024)
- 05000322/LER-1988-007, :on 880528,unplanned ESF Actuations Occurred When Equipment Operator Inadvertently Opened Wrong Breaker During Tagging Operation.Caused by Personnel Error.Personnel Involved Counseled + (23:29:16, 10 December 2024)
- ML20195G790 + (23:29:18, 10 December 2024)
- ML20195G789 + (23:29:18, 10 December 2024)
- ML20195G788 + (23:29:19, 10 December 2024)
- 05000293/LER-1998-024, :on 981015,determined That CR High Efficiency Aire Filtration Sys (Crheafs) Found Outside Design Basis Due to Installation of Duct Tape on Trains a & B Crheafs Supply Fans.Installed Mechanical Seals on Crheafs Supply Fans + (23:29:26, 10 December 2024)
- 05000354/LER-1988-015, :on 880526,unanticipated Loss of Second Control Room Emergency Filtration Chiller Occurred.Caused by Component Design Deficiency.Operation Procedure Reviewed & Design Mod to Chiller Installed + (23:29:29, 10 December 2024)
- L-88-278, Forwards Rev 15 to Physical Security Plan.Change Revised Canal Barrier Integrity Insp Interval Based on NRC .Rev Withheld (Ref 10CFR2.790) + (23:29:30, 10 December 2024)