Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198E593 + (16:26:09, 10 December 2024)
- ML20198E592 + (16:26:09, 10 December 2024)
- ML20198E589 + (16:26:10, 10 December 2024)
- ML20198E590 + (16:26:10, 10 December 2024)
- B11852, Forwards Addl Info Re Request for Deviation from Branch Technical Position Cmeb 9.5-1 & Revised Responses to Fire Protection Audit Open Items + (16:26:28, 10 December 2024)
- IR 05000289/1986002 + (16:26:28, 10 December 2024)
- ML20198E582 + (16:26:29, 10 December 2024)
- ML20198E585 + (16:26:29, 10 December 2024)
- ML20198E581 + (16:26:30, 10 December 2024)
- ML20198E580 + (16:26:31, 10 December 2024)
- ML20198E578 + (16:26:31, 10 December 2024)
- ML20198E577 + (16:26:32, 10 December 2024)
- ML20198E575 + (16:26:32, 10 December 2024)
- ML20198E574 + (16:26:33, 10 December 2024)
- PNO-III-85-093C, on 851106,licensee Submitted Request for Restart Concurrence,Per 851030 Confirmatory Action Ltr.Insp & Testing of Reactor Trip Breakers Completed.Failed Breakers Shipped to Vendors for Testing & Evaluation + (16:26:34, 10 December 2024)
- ML20198E569 + (16:26:36, 10 December 2024)
- ML20198E566 + (16:26:37, 10 December 2024)
- ML20198E567 + (16:26:37, 10 December 2024)
- RBG-23671, Special Rept:On 860301,actuation of Div III ECCS Occurred Following Unit Scram.Caused by Feedwater Pump Trip Due to Voltage Transient in Associated 13.8-kV Switchgear. Evaluation Continuing + (16:26:38, 10 December 2024)
- ML20198E561 + (16:26:39, 10 December 2024)
- ML20198E562 + (16:26:39, 10 December 2024)
- ML20198E559 + (16:26:40, 10 December 2024)
- ML20198E558 + (16:26:41, 10 December 2024)
- 05000458/LER-1986-033, :on 860426,reactor Scrammed Due to Combination of Planned half-scram from Surveillance Test & Unplanned half-scram.Caused by Blown Fuse in Reactor Protection Sys. Fuse Replaced + (16:26:42, 10 December 2024)
- ML20198E555 + (16:26:43, 10 December 2024)
- ML20198E553 + (16:26:44, 10 December 2024)
- ML20198E552 + (16:26:45, 10 December 2024)
- ML20198E550 + (16:26:45, 10 December 2024)
- IR 05000508/1985006 + (16:26:47, 10 December 2024)
- ML20198E547 + (16:26:48, 10 December 2024)
- 05000413/LER-1986-022, :on 860419,reactor Tripped During Venting of High Pressure Line to RCS Loop C Flow Transmitter.Caused by Defective Procedures.Procedures IP/1/A/3222/15A,B & C Revised + (16:26:49, 10 December 2024)
- ML20198E545 + (16:26:50, 10 December 2024)
- PNO-III-85-094, on 851107,bypass Reactor Trip Breaker B Failed to Operate During Performance of Tests Per IE Bulletin 85-002.Cause Not Stated.Plant Restored to Condition in Which Both Main Reactor Trip Breakers Operable + (16:26:51, 10 December 2024)
- ML20198E543 + (16:26:52, 10 December 2024)
- 05000275/LER-1986-005, :on 860422,opening Created in Fire Barrier W/O Establishing Continuous Fire Watch.Caused by Misinterpretation of Const Requirements by Plant Fire Protection Personnel.Procedure Revised + (16:26:53, 10 December 2024)
- ML20198E541 + (16:26:54, 10 December 2024)
- ML20198E540 + (16:26:55, 10 December 2024)
- ML20198E539 + (16:26:55, 10 December 2024)
- ML20198E536 + (16:26:56, 10 December 2024)
- 05000440/LER-1986-005, :on 860421,0510,17 & 19,control Room HVAC Sys Shifted to Emergency Recirculation Mode Due to High Chlorine Gas Monitor Trip Signal.Caused by Defective Optical Lamp Filament.Lamp Replaced + (16:26:58, 10 December 2024)
- IR 05000409/1998005 + (16:27:00, 10 December 2024)
- ML20198E529 + (16:27:00, 10 December 2024)
- ML20198E528 + (16:27:01, 10 December 2024)
- 05000395/LER-1986-007, :on 860422,reactor Bldg Space Spray Pump B Inadvertently Started.Cause Not Determined.Spray Pump Discharge Valve Remained Closed & No Flow Introduced Into Reactor Bldg + (16:27:03, 10 December 2024)
- ML20198E524 + (16:27:04, 10 December 2024)
- ML20198E523 + (16:27:05, 10 December 2024)
- TXX-4808, Interim Deficiency Rept CP-84-12 Re Impact of high-energy Line Break Temps on Qualified Equipment Outside Containment. Initially Reported on 840604.Thermal Analysis Completed & Operability of Equipment Under Review.Next Rept by 860716 + (16:27:05, 10 December 2024)
- RBG-44783, Provides Entergy Operations,Inc Input as Discussed in Call, for Consideration by NRC in Enforcement Process Re Insp Rept 50-458/98-13 + (16:27:06, 10 December 2024)
- PNO-II-98-001, on 980106,licensee Reported to Fl Bureau of Radiological Health That Troxler,Model 3430,moisture Density Gauge Stolen from Licensee pick-up Truck.State Will Require Licensee to Issue Press Release + (16:27:07, 10 December 2024)
- NUREG/CR-5549, Forwards NUREG/CR-5549, Environmental Assessment Renewal of Materials Licenses for Alaron Corp Northeast Regional Service Facility,Wampum,Pa, for Placement Into Nudocs + (16:27:08, 10 December 2024)
- IR 05000423/1986012 + (16:27:18, 10 December 2024)
- TXX-4806, Interim Deficiency Rept CP-85-42 Re Possible Adverse Effects of Substituting Rectangular & Oversized Preformed Sections of Thermolag on Conduit Support Design Installations. Initially Reported on 850920 + (16:27:19, 10 December 2024)