Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-86-0100, Provides Addl Info Re Intraplant Communication Sys Test, Per 860402 Request.Amplified Public Address Headsets Will Be Installed to Provide Adequate Communications W/Control Room from Deficient Areas.Summary of Test Results Encl + (15:23:40, 10 December 2024)
- ML20198K428 + (15:23:41, 10 December 2024)
- ML20198K427 + (15:23:42, 10 December 2024)
- 3F0198-06, Provides Addl Info for LAR 224 Re Reactor Bldg Fan Starting Logic Mod + (15:23:43, 10 December 2024)
- ML20198K426 + (15:23:43, 10 December 2024)
- ML20198K424 + (15:23:44, 10 December 2024)
- ML20198K421 + (15:23:45, 10 December 2024)
- ML20198K422 + (15:23:45, 10 December 2024)
- ML20198K418 + (15:23:46, 10 December 2024)
- ML20198K420 + (15:23:46, 10 December 2024)
- ML20198K416 + (15:23:47, 10 December 2024)
- ML20198K415 + (15:23:48, 10 December 2024)
- ML20198K412 + (15:23:48, 10 December 2024)
- ML20198K410 + (15:23:49, 10 December 2024)
- ML20198K409 + (15:23:50, 10 December 2024)
- IR 05000373/1986019 + (15:23:51, 10 December 2024)
- ML20198K405 + (15:23:52, 10 December 2024)
- ML20198K406 + (15:23:52, 10 December 2024)
- ML20198K404 + (15:23:53, 10 December 2024)
- ML20198K402 + (15:23:54, 10 December 2024)
- ML20198K403 + (15:23:54, 10 December 2024)
- ML20198K398 + (15:23:55, 10 December 2024)
- ML20198K399 + (15:23:55, 10 December 2024)
- ML20198K397 + (15:23:56, 10 December 2024)
- PNO-V-90-049, on 901207,w/plant Operating at Full Power, Explosion Occurred in Area of B Phase Insulator of Plant Main Transformer,Which Caused Turbine & Reactor Trip.Unusual Event Was Declared Due to Explosion + (15:23:57, 10 December 2024)
- U-600584, Provides Current Status of Design,Const & Preoperational Phase Testing of Facility,Describing Status as Revised from on Readiness to Load Fuel.Progress Continues to Support Jul 1986 Fuel Load + (15:23:57, 10 December 2024)
- ML20198K392 + (15:23:58, 10 December 2024)
- PNO-V-90-034, on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed + (15:23:58, 10 December 2024)
- ML20198K389 + (15:23:59, 10 December 2024)
- ML20198K388 + (15:24:00, 10 December 2024)
- 3F0198-23, Provides Notification That Due Date for Commitment Re Calibr of TS Instruments Is Being Extended + (15:24:01, 10 December 2024)
- ML20198K383 + (15:24:01, 10 December 2024)
- ML20198K382 + (15:24:02, 10 December 2024)
- ML20198K381 + (15:24:06, 10 December 2024)
- ML20198K379 + (15:24:07, 10 December 2024)
- IR 05000454/1997017 + (15:24:09, 10 December 2024)
- ML20198K377 + (15:24:10, 10 December 2024)
- ML20198K376 + (15:24:10, 10 December 2024)
- ML20198K374 + (15:24:11, 10 December 2024)
- ML20198K373 + (15:24:11, 10 December 2024)
- ML20198K372 + (15:24:12, 10 December 2024)
- ML20198K370 + (15:24:12, 10 December 2024)
- ML20198K366 + (15:24:13, 10 December 2024)
- ML20198K363 + (15:24:14, 10 December 2024)
- ML20198K362 + (15:24:14, 10 December 2024)
- ML20198K360 + (15:24:15, 10 December 2024)
- PNO-III-90-069, Univ of Iowas Plan to Incinerate Remains of Hundreds of Radioactively Contaminated Research Animals Has Drawn Interest of Environ & Animal Rights Groups & News Media.More than 40 Persons Staged Protest at Univ Campus + (15:24:18, 10 December 2024)
- RBG-44348, Informs That Entergy Operations,Inc Will No Longer Submit Annual Financial Repts for Cajun Electric Power Cooperative, Inc.Entergy Gulf States Has Been Awarded Thirty Percent Share of River Bend,Previously Owned by Cajun Electric + (15:24:19, 10 December 2024)
- 05000348/LER-1998-006-03, :on 981124,PRF Sys Suction Damper Was Outside Design & Licensing Basis.Caused by 1976 Personnel Failure to Identify Noted Inconsistency.Scheduled Design Change in 1999 to Modify Dampers to Ensure Licensing Basis Are Met + (15:24:21, 10 December 2024)
- B16928, Forwards 90-day Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (15:24:22, 10 December 2024)
- PNO-III-90-048, on 900713,employee Loading 10 Curie Cs-137 Source Into Source Holder Received Radiation Dose of 714 Rems to Right Hand.Nrc Regulations Limit Occupational Extremity Dose to 18.75 Rems in Cy + (15:24:22, 10 December 2024)
- ML20198K351 + (15:24:23, 10 December 2024)