Confirms Commitment as Discussed During Telcon Btween E Collins (USNRC) & M Peckham (Nppd),That Mod Will Be Installed During Midcycle Outage Scheduled to Begin on 980228,or During Unplanned Outage Should One Occur Before
ML20198K421
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/09/1998
From: Graham P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS980007, NUDOCS 9801140410
Download: ML20198K421 (3)


Text

-

e*

P.O. 90X LLE NCB 68321 -

Nebraska Public Power District

.-.=~

4..

NLS980007 -

January 9,1998 U.S.. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 x

' Gentlemen:

Subject:

Response to Request for unfirmation of Commitment Cooper Nuclear Station, NRC Docket 50-298, DPR-46

Reference:

1. Letter to U. R. Horn (NPPD) from Thomas P. Gwynn (USNRC) dated December 31,1997
2. Letter to Director, Office of Enforcement (USNRC) from G. R. Horn (NPPD) dated December 31,1997, " Reply to a Notice of Violation" (NRC Inspection Report Nos. 50-298/97-07 and 97-12)
3. Letter from Thomas P. Gwynn (USNRC) dated October 3,1997, " Notice of Licensee Meeting" (Predecisional Enforcement Conference to discuss apparent violations in NRC Inspection Report 50-298/97-12)

By letter dated December 31,1997 (Reference 1), the NRC requested a confirmation of commitment from Nebraska Public Power District (District) regarding a schedule change in the installation of essential power supplies to the elevated release point sump pumps (Z Sump pumps) This letter confirms the commitment as discussed during the telephone conversation between Mr. E. E. Collins (USNRC) and Mr. Mike Peckham (NPPD), that the modification will be installed during the midcycle outage scheduled to begin on February 28,1998, or during an unplanned outage should one occut before this time. Also, in the District's Reply to a Notice of Violation dated December 31,1997 (Reference 2), the District committed to the installation of essential power to the Z sump pumps no later than March 31,1998.

f A verbal'commitmeat was made during the Predecisional Enforcement Conference (Reference 3)

I to complete the installation by December 31,1997..However, during the modification process it was determined that personnel safety would be put at risk, due to the inability to de-energize the

- required circuits during power operation. Thus, in the interest of personnel safety, the installation will be completed during the midcycle outage. Also, as discussed in Reference 2, interim corrective raeasures have been taken to eliminate the potential for water accumulation in the fffffIffff[g

[

fff f 9001140410 900109 7

DR ADOCK O 298 l

e s

m m.

'gy 5

e u'

E

x y.

' :NLS980007.

i January 9,1998 '--

l_ Page 2 0f 2 ~

, offgas system 48 insh hold up line, to preclude rendering both trains of the standby gas treatment system inoperable. - Therefore, the schedule delay poses no undue risk to nuclear safety.

Should yot. have any questions concerning this matter, please contact me. _

Sin ~erel >,

k\\

/-

P. Dc Graham Vice President of Nuclear Energy.

L/Ird.

.cc: Director, Division of Reactor Projects

. USNRC - Region IV Regional Administrator USNRC - Region IV Senior Project Manager USNRC -NRR Project Directorate IV-1

- Senior Resident inspector USNRC-

~

NPG Distribution -

4-and

l I-ATTACHMENT 3 LIST OF NRC COMMITMENTS l

Correspondence No:NLS980007 The,following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE 1998 midcycle outage or sooner if an a e Essential Power will be supplied to the z-sump pumps, c

ter than March 31, 1998.

l PROCEDURE NUMBER 0.42 l

REVISION NU/SER S l

PAGE 8 OF 9 l