Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198M968 + (15:00:30, 10 December 2024)
- ML20198M967 + (15:00:30, 10 December 2024)
- ML20198M964 + (15:00:31, 10 December 2024)
- ML20198M965 + (15:00:31, 10 December 2024)
- ML20198M963 + (15:00:32, 10 December 2024)
- ML20198M960 + (15:00:33, 10 December 2024)
- ML20198M961 + (15:00:33, 10 December 2024)
- PNO-I-88-044, on 880414,radiological Control Personnel Found Leaking Tritium Light Source,Containing 10 Curies of Activity Subject to X-ray Exam W/O Authority or Radiological Controls.Facility Shut Down Immediately on 880414 + (15:00:34, 10 December 2024)
- ML20198M959 + (15:00:34, 10 December 2024)
- ML20198M957 + (15:00:35, 10 December 2024)
- PNO-I-88-060, on 880607,while at 100% Power,Cedm 23 Dropped Into Core.Licensee Investigation Found CEDM 23 Breaker Had Tripped on Overcurrent & Upper Gripper Coil Had Electrical Short.Plant Shut Down for Estimated 4 Days for Repair + (15:00:36, 10 December 2024)
- ML20198M951 + (15:00:36, 10 December 2024)
- ML20198M948 + (15:00:37, 10 December 2024)
- PNO-I-88-061, on 880606,sewage Dumped on Whitaker Farm by Vynp Station & Contracted Hauler A-1 Sanitary.Agreement Made W/Contractor & Owners of Farm to Aid in Fertilization.In Jan 1986 Vynp Station Sewage Taken to Brattleboro,Vt + (15:00:37, 10 December 2024)
- ML20198M945 + (15:00:38, 10 December 2024)
- ML20198M939 + (15:00:39, 10 December 2024)
- ML20198M940 + (15:00:39, 10 December 2024)
- ML20198M938 + (15:00:40, 10 December 2024)
- PNO-III-88-046, on 880517,test Performed as Part of Investigation of Dec 1987 Incident in Which Air Line Became Disconnected on One MSIV & Did Not Fully Close.Ait Will Maintain Insp Coverage of Activities Associated W/Msiv + (15:00:41, 10 December 2024)
- ML20198M936 + (15:00:41, 10 December 2024)
- ML20198M932 + (15:00:42, 10 December 2024)
- ML20198M929 + (15:00:43, 10 December 2024)
- ML20198M931 + (15:00:43, 10 December 2024)
- ML20198M928 + (15:00:44, 10 December 2024)
- ML20198M927 + (15:00:45, 10 December 2024)
- ML20198M925 + (15:00:45, 10 December 2024)
- ML20198M922 + (15:00:46, 10 December 2024)
- ML20198M924 + (15:00:46, 10 December 2024)
- ML20198M919 + (15:00:47, 10 December 2024)
- ML20198M918 + (15:00:48, 10 December 2024)
- ML20198M917 + (15:00:49, 10 December 2024)
- ML20198M914 + (15:00:49, 10 December 2024)
- ML20198M912 + (15:00:50, 10 December 2024)
- ML20198M909 + (15:00:51, 10 December 2024)
- ML20198M911 + (15:00:51, 10 December 2024)
- PNO-III-88-042, on 880427,State of Il Notified Region III of Lost of Byproduct Matl Package Containing Total of 160 Mci of Various Isotopes P-32,I-125,H-3 & Cr-51 + (15:00:52, 10 December 2024)
- ML20198M906 + (15:00:56, 10 December 2024)
- ML20198M905 + (15:00:57, 10 December 2024)
- PNO-III-88-075, on 880827,w/reactor Operating at Full Power, Ph at Outlet of B Mixed Bed Demineralizer Decreased to Alarm Setpoint.Unit Taken Off Line 880829.Region III Will Monitor Licensee Course of Action + (15:00:57, 10 December 2024)
- NG-97-2114, Transmits Change to Rev 9 of Ies Util,Inc QA Program Description for Duane Arnold Energy Center.Changes to Rev 19 of QAPD Submitted + (15:00:58, 10 December 2024)
- ML20198M901 + (15:00:59, 10 December 2024)
- ML20198M900 + (15:00:59, 10 December 2024)
- PNO-III-88-016, on 880304,licensee Declared Alert After Both Trains of Decay Heat Removal Sys Were Declared Inoperable + (15:01:00, 10 December 2024)
- ML20198M896 + (15:01:01, 10 December 2024)
- PNO-III-88-068A, as of 880812,threat of Possible Strike Between Intl Brotherhood of Workers (Four Locals) & Licensee.Strike Under Negotiation + (15:01:01, 10 December 2024)
- ML20198M892 + (15:01:03, 10 December 2024)
- ML20198M893 + (15:01:03, 10 December 2024)
- ML20198M890 + (15:01:04, 10 December 2024)
- ML20198M891 + (15:01:04, 10 December 2024)
- PNO-III-88-053, on 880604,while Unit 3 Was Shutdown for Refueling Outage,Contractor Fire Watch Noticed Smoke Coming from Beneath Welder Working on Struts Being Installed on RWCU Sys Piping Penetration Inside RWCU Pipe Way Pit + (15:01:05, 10 December 2024)
- ML20198M887 + (15:01:06, 10 December 2024)
- PNO-III-88-012, on 880222,unit Operating at Approx 100% Power,Drywell Floor Drain Sump Instrumentation Detected Unidentified Leakage Increase from 2.5 Gpm to 4.6 Gpm + (15:01:06, 10 December 2024)