PNO-III-88-042, on 880427,State of Il Notified Region III of Lost of Byproduct Matl Package Containing Total of 160 Mci of Various Isotopes P-32,I-125,H-3 & Cr-51
ML20198M907 | |
Person / Time | |
---|---|
Issue date: | 04/28/1988 |
From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | |
References | |
PNO-III-88-042, PNO-III-88-42, NUDOCS 9710300114 | |
Download: ML20198M907 (1) | |
Similar Documents from NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) | |
---|---|
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-III-99-047, on 991015,NRC Inspectors Evaluating Work at Plant Amid Strike Update Made.Oxide Plant Is Expected to Operate Only Until Sufficient UO2 Powder Has Been Made to Handle Current Customer Fuel Order.Leak Was Detected1999-10-20020 October 1999
[Table view]Some use of "" in your query was not closed by a matching "".PNO-III-99-047:on 991015,NRC Inspectors Evaluating Work at Plant Amid Strike Update Made.Oxide Plant Is Expected to Operate Only Until Sufficient UO2 Powder Has Been Made to Handle Current Customer Fuel Order.Leak Was Detected PNO-III-99-046, on 991018,licensee Reported That Medical Misadministration Had Occurred on 990907.Written Directive Has Been Prepared by Patient Physician for 200 Mci Dose of I-131 for Thyroid Treatment1999-10-19019 October 1999 PNO-III-99-046:on 991018,licensee Reported That Medical Misadministration Had Occurred on 990907.Written Directive Has Been Prepared by Patient Physician for 200 Mci Dose of I-131 for Thyroid Treatment PNO-III-99-045, on 991001,brush Fire Was Reported on Licensee Site in Unused Area one-fourth to one-half Mile from Plant Itself.Massac County Fire Dept Responded with Two Trucks & Tanker & Extinguished Fire in About 1 H1999-10-0101 October 1999 PNO-III-99-045:on 991001,brush Fire Was Reported on Licensee Site in Unused Area one-fourth to one-half Mile from Plant Itself.Massac County Fire Dept Responded with Two Trucks & Tanker & Extinguished Fire in About 1 H PNO-III-99-044, on 990928,all Nuclear Fuel Processing & Fabrication Activities Were Shut Down,After Plant Employees Represented by Teamsters Union Voted to Go on Strike.Union Represents 112 Employees at Plant.Region III Was Notified1999-09-30030 September 1999 PNO-III-99-044:on 990928,all Nuclear Fuel Processing & Fabrication Activities Were Shut Down,After Plant Employees Represented by Teamsters Union Voted to Go on Strike.Union Represents 112 Employees at Plant.Region III Was Notified PNO-III-99-043, on 990923,patient Being Treated for Cancer of Esophagus,Received Radiation Dose to Unintended Area of Esophagus During First of Two Treatments Using High Dose Rate Afterloading Treatment Device with About 10 Ci Ir-1921999-09-27027 September 1999 PNO-III-99-043:on 990923,patient Being Treated for Cancer of Esophagus,Received Radiation Dose to Unintended Area of Esophagus During First of Two Treatments Using High Dose Rate Afterloading Treatment Device with About 10 Ci Ir-192 PNO-III-99-042, on 990921,large Sanitary Water Line Ruptured at Portsmouth Gaseous Diffusion Plant,Causing Loss of Sanitary Water to Plant.Resident Inspector Monitored Plant Response to Incident.State of Oh,Oh EPA & NRC Ctr Contacted1999-09-21021 September 1999 PNO-III-99-042:on 990921,large Sanitary Water Line Ruptured at Portsmouth Gaseous Diffusion Plant,Causing Loss of Sanitary Water to Plant.Resident Inspector Monitored Plant Response to Incident.State of Oh,Oh EPA & NRC Ctr Contacted PNO-III-99-041, on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found1999-09-0303 September 1999 PNO-III-99-041:on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found PNO-III-99-040A, on 990901,licensee Resumed Shipments from Nuclear Pharmacy Facility,Following Recovery Activities from Contamination Incident Which Occurred on 990831.Vial Was One of Eight Being Prepared.Individuals Were Decontaminated1999-09-0202 September 1999 PNO-III-99-040A:on 990901,licensee Resumed Shipments from Nuclear Pharmacy Facility,Following Recovery Activities from Contamination Incident Which Occurred on 990831.Vial Was One of Eight Being Prepared.Individuals Were Decontaminated PNO-III-99-040, on 990831,vial Burst in Dispensing Room of Nuclear Pharmacy,Spreading Low Levels of Radioactive Contamination Throughout Facility.Technician & One Other Worker Received Low Levels of Radioactive Contamination1999-08-31031 August 1999 PNO-III-99-040:on 990831,vial Burst in Dispensing Room of Nuclear Pharmacy,Spreading Low Levels of Radioactive Contamination Throughout Facility.Technician & One Other Worker Received Low Levels of Radioactive Contamination PNO-III-99-038, on 990812,arms Storage Room at Fort Drum,Ny Contaminated.Caused by Damaged Tritium Radiation Source in M224 Mortar Range Indicator.Urine Samples Were Collected from Two Maint Personnel.Region I Will Perform Insp1999-08-18018 August 1999 PNO-III-99-038:on 990812,arms Storage Room at Fort Drum,Ny Contaminated.Caused by Damaged Tritium Radiation Source in M224 Mortar Range Indicator.Urine Samples Were Collected from Two Maint Personnel.Region I Will Perform Insp PNO-III-99-037, on 990721,licensee Reported Theft of Moisture Density Gauge While in Employee Vehicle Parked at Employee Residence in Harrison,Oh.Guage Contained Nominal 8 Mci of Cs-137 & 40 Mci of Am-241.Licensee Notified NRC1999-07-22022 July 1999 PNO-III-99-037:on 990721,licensee Reported Theft of Moisture Density Gauge While in Employee Vehicle Parked at Employee Residence in Harrison,Oh.Guage Contained Nominal 8 Mci of Cs-137 & 40 Mci of Am-241.Licensee Notified NRC PNO-III-99-036, on 990720,gauge Containing 8 Mci Cs-137 Sealed Source & 40 Mci Am-241 Sealed Source Was Taken from Locked Storage Case Which Was Also Chained to Back Rear of Truck.Licensee Has Reported Theft to State & Local Police1999-07-21021 July 1999 PNO-III-99-036:on 990720,gauge Containing 8 Mci Cs-137 Sealed Source & 40 Mci Am-241 Sealed Source Was Taken from Locked Storage Case Which Was Also Chained to Back Rear of Truck.Licensee Has Reported Theft to State & Local Police PNO-III-99-035, on 990707,licensee Notified NRC of Misadministration,Involving Implanting Leaking I-125 Seed Into Patient.Licensee Believes That One of Seeds Had Been Cut Through During Implantation Into Patient1999-07-0808 July 1999 PNO-III-99-035:on 990707,licensee Notified NRC of Misadministration,Involving Implanting Leaking I-125 Seed Into Patient.Licensee Believes That One of Seeds Had Been Cut Through During Implantation Into Patient PNO-III-99-034A, on 990702,all Criticality Accident Alarms Administratively Declared Inoperable.Criticality Accident Alarms Administratively Was Declared Inoperable After Engineering Plant Staff,During Review of Calculations1999-07-0606 July 1999 PNO-III-99-034A:on 990702,all Criticality Accident Alarms Administratively Declared Inoperable.Criticality Accident Alarms Administratively Was Declared Inoperable After Engineering Plant Staff,During Review of Calculations PNO-III-99-034, on 990702,all Criticality Accident Alarms Adminstratively Declared Inoperable.Certficatee Issued Press Release.Certificatee Remains in Alert Pending Resolution of Operability Issue.Senior Inspector Responded to Site1999-07-0202 July 1999 PNO-III-99-034:on 990702,all Criticality Accident Alarms Adminstratively Declared Inoperable.Certficatee Issued Press Release.Certificatee Remains in Alert Pending Resolution of Operability Issue.Senior Inspector Responded to Site PNO-III-99-029, on 990601,NRC Was Notified of Misadmin Re Therapeutic Quantity of Radiopharm.Caused by Personnel Error.Referring Physician Was Notified by Licensee of Misadministration1999-06-0101 June 1999 PNO-III-99-029:on 990601,NRC Was Notified of Misadmin Re Therapeutic Quantity of Radiopharm.Caused by Personnel Error.Referring Physician Was Notified by Licensee of Misadministration PNO-III-99-028, on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed1999-05-28028 May 1999 PNO-III-99-028:on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed PNO-III-99-027, on 990514,Unit 1 Was Manually Tripped Due to Steam Leak from 4B Feedwater Heater.Nrc Resident Inspectors Monitored Activities in CR Following Reactor Trip & Monitoring Progress of Repair Work.Licensee Notified NRC1999-05-19019 May 1999 PNO-III-99-027:on 990514,Unit 1 Was Manually Tripped Due to Steam Leak from 4B Feedwater Heater.Nrc Resident Inspectors Monitored Activities in CR Following Reactor Trip & Monitoring Progress of Repair Work.Licensee Notified NRC PNO-III-99-026A, on 990502,source Rack for Pool Irradiator Stuck,Due to Cable Clutch Failure Update Made.Sterigenics Authorizes Up to Six Million Curies of Co-60 to Be Used in Irradiation Cell.Idns Investigating Incident1999-05-0303 May 1999 PNO-III-99-026A:on 990502,source Rack for Pool Irradiator Stuck,Due to Cable Clutch Failure Update Made.Sterigenics Authorizes Up to Six Million Curies of Co-60 to Be Used in Irradiation Cell.Idns Investigating Incident PNO-III-99-026, on 990429,source Rack Failed to Return to Shielded Position in Pool.Licensee Staff Manually Freed Rack by Pulling on Cable on Cell Roof.Idns Investigating Incident & Licensee Will Provide 30-day Rept1999-04-30030 April 1999 PNO-III-99-026:on 990429,source Rack Failed to Return to Shielded Position in Pool.Licensee Staff Manually Freed Rack by Pulling on Cable on Cell Roof.Idns Investigating Incident & Licensee Will Provide 30-day Rept PNO-III-99-025, on 990429,licensee Reported That Patient Had Received Series of Co-60 Teletherapy Treatments with Weekly Total Dose of 33% Greater Than,Prescribed for Teletherapy Series.Licensee Intends to Modify Patient Treatment Plan1999-04-30030 April 1999 PNO-III-99-025:on 990429,licensee Reported That Patient Had Received Series of Co-60 Teletherapy Treatments with Weekly Total Dose of 33% Greater Than,Prescribed for Teletherapy Series.Licensee Intends to Modify Patient Treatment Plan PNO-III-99-024, on 990416,licensee Commenced Controlled Power Reduction to Approx 10% to Identify & Repair Main Generator Field Ground.Troubleshooting Efforts Are Still in Progress. Ris Monitored SD & Troubleshooting & Will Review Activities1999-04-19019 April 1999 PNO-III-99-024:on 990416,licensee Commenced Controlled Power Reduction to Approx 10% to Identify & Repair Main Generator Field Ground.Troubleshooting Efforts Are Still in Progress. Ris Monitored SD & Troubleshooting & Will Review Activities PNO-III-99-023, on 990409,Troxler Portable Moisture Density Gauge Containing 10 Mci of Cs-137 & 40 Mci of AM-241/Be Sealed Sources Fell Out Licensee Truck.Licensee Plans to Issue Press Release.Region III Will Conduct Facility Insp1999-04-15015 April 1999 PNO-III-99-023:on 990409,Troxler Portable Moisture Density Gauge Containing 10 Mci of Cs-137 & 40 Mci of AM-241/Be Sealed Sources Fell Out Licensee Truck.Licensee Plans to Issue Press Release.Region III Will Conduct Facility Insp PNO-III-99-022, on 990413,licensee Notified NRC of Missing Tritium Exit Sign.Sign Was Declared Missing After Extensive Search of Property & Interviews with Staff.Licensee Will Send follow-up Rept in 30 Days1999-04-14014 April 1999 PNO-III-99-022:on 990413,licensee Notified NRC of Missing Tritium Exit Sign.Sign Was Declared Missing After Extensive Search of Property & Interviews with Staff.Licensee Will Send follow-up Rept in 30 Days PNO-III-99-021, on 990409,licensee Discovered That Fixed Gauge Containing 1 Curie Am-241 Was Missing from Storage Location at Facility in Greenwood,In.Licensee Notified Local Police.Region III Will Conduct Insp1999-04-13013 April 1999 PNO-III-99-021:on 990409,licensee Discovered That Fixed Gauge Containing 1 Curie Am-241 Was Missing from Storage Location at Facility in Greenwood,In.Licensee Notified Local Police.Region III Will Conduct Insp PNO-III-99-020, on 990409,Unit 2 Had Been Shut Down Since Sept 1996 for Refueling Outage That Was Extended in Order to Address Extensive Equipment Condition.Util Completed Comprehensive Corrective Action Program1999-04-13013 April 1999 PNO-III-99-020:on 990409,Unit 2 Had Been Shut Down Since Sept 1996 for Refueling Outage That Was Extended in Order to Address Extensive Equipment Condition.Util Completed Comprehensive Corrective Action Program PNO-III-99-019, on 990408,informed NRC Operations Ctr of 990407 Contamination Event Resulting from Package Picked Up by Medi-Physics Pharmacy Driver at West Suburban Hosp in Il.Il Conducting Investigation at West Suburban Hosp1999-04-0909 April 1999 PNO-III-99-019:on 990408,informed NRC Operations Ctr of 990407 Contamination Event Resulting from Package Picked Up by Medi-Physics Pharmacy Driver at West Suburban Hosp in Il.Il Conducting Investigation at West Suburban Hosp PNO-III-99-018, on 990408,failure of Transfer at Portsmouth Gaseous Diffusion Plant Caused 9,500 Gallons of Oil to Leak Into Onsite Drainage Pond.Pond Is Designed to Prevent Matl from Entering Offsite Waterways.Nrc Notified of Event1999-04-0808 April 1999 PNO-III-99-018:on 990408,failure of Transfer at Portsmouth Gaseous Diffusion Plant Caused 9,500 Gallons of Oil to Leak Into Onsite Drainage Pond.Pond Is Designed to Prevent Matl from Entering Offsite Waterways.Nrc Notified of Event PNO-III-99-017, on 990402,medical Misadministration Occurred, When Patient Received Single Fraction Radiation Dose of 200 Rads to Head Area with Theratron Co-60 Teletherapy Unit Containing Nominal 13,000 Ci.Licensee Notified NRC1999-04-0606 April 1999 PNO-III-99-017:on 990402,medical Misadministration Occurred, When Patient Received Single Fraction Radiation Dose of 200 Rads to Head Area with Theratron Co-60 Teletherapy Unit Containing Nominal 13,000 Ci.Licensee Notified NRC PNO-III-99-016, on 990330,employee Discovered That Moisture Density Gauge Containing 10 Mci Cs-137 Sealed Source & 50 Mci Am-241 Sealed Source Was Stolen.Licensee Has Reported Theft to Local Police & Informed Local News Media of Gauge1999-03-31031 March 1999 PNO-III-99-016:on 990330,employee Discovered That Moisture Density Gauge Containing 10 Mci Cs-137 Sealed Source & 50 Mci Am-241 Sealed Source Was Stolen.Licensee Has Reported Theft to Local Police & Informed Local News Media of Gauge PNO-III-99-015, on 990326,IL Dept of Nuclear Safety Informed NRC Region III of Three Medical Misadministrations.Caused by Incorrect Source Strength for Iridium-192 Source in Nucletron Microselection HDR Remote Afterloader1999-03-29029 March 1999 PNO-III-99-015:on 990326,IL Dept of Nuclear Safety Informed NRC Region III of Three Medical Misadministrations.Caused by Incorrect Source Strength for Iridium-192 Source in Nucletron Microselection HDR Remote Afterloader PNO-III-99-014, on 990325,NRC Region III Was Notified by Oh Dept of Health That Liquid Was Leaking from Container of LSA Radioactive Matl.State of Oh,Cleveland Fire Dept,Shipper & NRC Region III Dispatched Personnel to Survey Leakage1999-03-26026 March 1999 PNO-III-99-014:on 990325,NRC Region III Was Notified by Oh Dept of Health That Liquid Was Leaking from Container of LSA Radioactive Matl.State of Oh,Cleveland Fire Dept,Shipper & NRC Region III Dispatched Personnel to Survey Leakage PNO-III-99-013, on 990318,licensee Removed Gynecological Radiation Treatment Device from Patient & Found That One of Two 27.5 Mci Cs-137 Sealed Sources Was Missing.Patient Has Been Informed of Misadministration1999-03-22022 March 1999 PNO-III-99-013:on 990318,licensee Removed Gynecological Radiation Treatment Device from Patient & Found That One of Two 27.5 Mci Cs-137 Sealed Sources Was Missing.Patient Has Been Informed of Misadministration PNO-III-99-012, on 990315,patient Received Radiation Dose to Unintended Site in Last of Six Fractional Treatments. Treatment Plan Called for Six Treatments of 500 Rads Each Using Afterloader.Region III Notified of Misadministration1999-03-17017 March 1999 PNO-III-99-012:on 990315,patient Received Radiation Dose to Unintended Site in Last of Six Fractional Treatments. Treatment Plan Called for Six Treatments of 500 Rads Each Using Afterloader.Region III Notified of Misadministration PNO-III-99-011, on 990309,licensee Discovered During Quality Mgt Program Review That Medical Misadministration Occurred on 990217.Patient Doctor Had Prescribed 4 Mci of Sodium I- 131 for Whole Body Scan.Preliminary Notification Reviewed1999-03-11011 March 1999 PNO-III-99-011:on 990309,licensee Discovered During Quality Mgt Program Review That Medical Misadministration Occurred on 990217.Patient Doctor Had Prescribed 4 Mci of Sodium I- 131 for Whole Body Scan.Preliminary Notification Reviewed PNO-III-99-010, on 990304,notified NRC That Garbage Truck Returning from Residential Area Waste pick-up Set Off Radiation Monitors at Entrance to Facility in Evansville,In. Info in Preliminary Notification Has Been Reviewed1999-03-0505 March 1999 PNO-III-99-010:on 990304,notified NRC That Garbage Truck Returning from Residential Area Waste pick-up Set Off Radiation Monitors at Entrance to Facility in Evansville,In. Info in Preliminary Notification Has Been Reviewed PNO-III-99-006, on 990205,licensee Reported That Patient Had Received 12.3 Percent Underdose During Treatment on 990106 for Brain Cancer.Licensee Used Co-60 Gamma Stereotactic Radiosurgery.Licensee Reported Misadministration to NRC1999-02-0909 February 1999 PNO-III-99-006:on 990205,licensee Reported That Patient Had Received 12.3 Percent Underdose During Treatment on 990106 for Brain Cancer.Licensee Used Co-60 Gamma Stereotactic Radiosurgery.Licensee Reported Misadministration to NRC PNO-III-99-005, on 990202,truck with Empty UF6 Cylinders Involved in Traffic Accident.Local Fire & Police Personnel Responded Immediately to Scene of Accident.Driver of tractor-trailer Received Minor Injuries1999-02-0303 February 1999 PNO-III-99-005:on 990202,truck with Empty UF6 Cylinders Involved in Traffic Accident.Local Fire & Police Personnel Responded Immediately to Scene of Accident.Driver of tractor-trailer Received Minor Injuries PNO-III-99-004, on 990128,patient Apparently Removed Ribbon Containing Ir-192 Seeds During Radiation Therapy Procedure. Ribbon Had Been Inserted Through Patient Nose & Into Lungs for Treatment of Lung Cancer.Treating Physician Notified1999-02-0101 February 1999 PNO-III-99-004:on 990128,patient Apparently Removed Ribbon Containing Ir-192 Seeds During Radiation Therapy Procedure. Ribbon Had Been Inserted Through Patient Nose & Into Lungs for Treatment of Lung Cancer.Treating Physician Notified PNO-III-99-058B, second Update on 981209 Fire in Process Bldg.Exit Meeting on 990205 Rescheduled from 990108 Due to Severe Weather.Cause of Fire Still Being Investigated by Usec.Some Release of Hex in Process Bldg Occurred1999-01-13013 January 1999 PNO-III-99-058B:second Update on 981209 Fire in Process Bldg.Exit Meeting on 990205 Rescheduled from 990108 Due to Severe Weather.Cause of Fire Still Being Investigated by Usec.Some Release of Hex in Process Bldg Occurred PNO-III-99-002, on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump1999-01-0808 January 1999 PNO-III-99-002:on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump PNO-III-99-001, on 990105,Unit 1 Station Auxiliary Transformer Exploded Ignited Oil Fire.Fire Extinguished within 15 Minutes by Onsite Fire Brigade.Unit 2 Operating at 60 Percent Power,Was Not Affected by Explosion & Fire1999-01-0606 January 1999 PNO-III-99-001:on 990105,Unit 1 Station Auxiliary Transformer Exploded Ignited Oil Fire.Fire Extinguished within 15 Minutes by Onsite Fire Brigade.Unit 2 Operating at 60 Percent Power,Was Not Affected by Explosion & Fire PNO-III-98-058A, on 981214,update of Fire in Process Made. Insp Exit Meeting,Open to Public,Will Be Scheduled in Early Jan.Certificate Holder,Us Enrichment Corp,Continuing Its Investigation of Fire,Including Determination of Causes1998-12-15015 December 1998 PNO-III-98-058A:on 981214,update of Fire in Process Made. Insp Exit Meeting,Open to Public,Will Be Scheduled in Early Jan.Certificate Holder,Us Enrichment Corp,Continuing Its Investigation of Fire,Including Determination of Causes PNO-III-98-059, on 981214,Campbell-Pacific Portable Moisture Density Gauge Containing 10 Mci Cs-137 & 50 Mci Am-241 Sealed Sources Stolen from Licensee Locked Const Trailer. Licensee Notified Charleston Police Dept of Theft1998-12-15015 December 1998 PNO-III-98-059:on 981214,Campbell-Pacific Portable Moisture Density Gauge Containing 10 Mci Cs-137 & 50 Mci Am-241 Sealed Sources Stolen from Licensee Locked Const Trailer. Licensee Notified Charleston Police Dept of Theft PNO-III-98-058, on 981209,fire Started in Process Bldg 326. Plant Onsite Fire Brigade Responded & Extinguished Fire About 2 H Later.Certificatee Does Not Know Cause of Fire at Present Time.Treated Four Plant Workers for Minor Injuries1998-12-0909 December 1998 PNO-III-98-058:on 981209,fire Started in Process Bldg 326. Plant Onsite Fire Brigade Responded & Extinguished Fire About 2 H Later.Certificatee Does Not Know Cause of Fire at Present Time.Treated Four Plant Workers for Minor Injuries PNO-III-98-057, on 981204,licensee Reported Teletherapy Treatments with Higher Dose than Intended for 15 Treatments in Planned Series of 25 Treatments.Caused by Calculational Error.Region III Will Conduct Special Insp1998-12-0707 December 1998 PNO-III-98-057:on 981204,licensee Reported Teletherapy Treatments with Higher Dose than Intended for 15 Treatments in Planned Series of 25 Treatments.Caused by Calculational Error.Region III Will Conduct Special Insp PNO-III-98-056, on 981202,licensee Reported That Patient Had Received Co-60 Gamma Sterotactic Radiosurgery Treatment to Unintended Area of Patients Brain.Error Was Discovered During Setup for Second Treatment.Licensee Notified NRC1998-12-0303 December 1998 PNO-III-98-056:on 981202,licensee Reported That Patient Had Received Co-60 Gamma Sterotactic Radiosurgery Treatment to Unintended Area of Patients Brain.Error Was Discovered During Setup for Second Treatment.Licensee Notified NRC PNO-III-98-055, on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions1998-11-13013 November 1998 PNO-III-98-055:on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions PNO-III-98-053, on 981104,loss of I-125 Seeds Occurred. Radiation Survey Did Not Detect Spare Seeds Because They Were Shielded within Sterilizer Pig.Operating Room Technician Was Not Trained to Recognize Seeds1998-11-0404 November 1998 PNO-III-98-053:on 981104,loss of I-125 Seeds Occurred. Radiation Survey Did Not Detect Spare Seeds Because They Were Shielded within Sterilizer Pig.Operating Room Technician Was Not Trained to Recognize Seeds PNO-III-98-054, on 981006,medical Event Involving Dose to Fetuses Occurred.Licensee Received Verbal Confirmation from Patient That She Was Not Pregnant,Prior to Administering Dose.Licensee Notified Referring Physician of Event1998-11-0404 November 1998 PNO-III-98-054:on 981006,medical Event Involving Dose to Fetuses Occurred.Licensee Received Verbal Confirmation from Patient That She Was Not Pregnant,Prior to Administering Dose.Licensee Notified Referring Physician of Event 1999-09-30 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000346/19990171999-10-26026 October 1999
[Table view]Some use of "" in your query was not closed by a matching "".Insp Rept 50-346/99-17 on 990928-1001.No Violations Noted. Major Areas Inspected:Implementation of Licensee Protected Area Ingress Search Program,Maint Support for Security Sys, Alarms Stations & Communications & QA IR 05000331/19993021999-10-25025 October 1999 NRC Operator Licensing Exam Rept 50-331/99-302OL(including Completed & Graded Tests) for Tests Administered on 990920- 24.Six Applicants Passed Exam & Were Issed Operating Licenses IR 05000263/19990061999-10-21021 October 1999 Insp Rept 50-263/99-06 on 990813-0923.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000341/19990171999-10-21021 October 1999 Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted. Major Areas Inspected:Incident Involving Loaded Firearm in Protected Area Identified on 990922 & Being Considered as Noncited Violation PNO-III-99-047, on 991015,NRC Inspectors Evaluating Work at Plant Amid Strike Update Made.Oxide Plant Is Expected to Operate Only Until Sufficient UO2 Powder Has Been Made to Handle Current Customer Fuel Order.Leak Was Detected1999-10-20020 October 1999 PNO-III-99-047:on 991015,NRC Inspectors Evaluating Work at Plant Amid Strike Update Made.Oxide Plant Is Expected to Operate Only Until Sufficient UO2 Powder Has Been Made to Handle Current Customer Fuel Order.Leak Was Detected PNO-III-99-046, on 991018,licensee Reported That Medical Misadministration Had Occurred on 990907.Written Directive Has Been Prepared by Patient Physician for 200 Mci Dose of I-131 for Thyroid Treatment1999-10-19019 October 1999 PNO-III-99-046:on 991018,licensee Reported That Medical Misadministration Had Occurred on 990907.Written Directive Has Been Prepared by Patient Physician for 200 Mci Dose of I-131 for Thyroid Treatment IR 05000282/19990141999-10-19019 October 1999 Insp Repts 50-282/99-14 & 50-306/99-14 on 990920-22. Violations Noted.Major Areas Inspected:Heat Sink Performance IR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000315/19990271999-10-15015 October 1999 Partially Deleted Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24 (Ref 10CFR73.21).Noncited Violation Noted.Major Areas Inspected:Plant Support Activities Re Physical Protection of Plant Facility. 15 IR 05000263/19990121999-10-13013 October 1999 Insp Rept 50-263/99-12 on 990913-17.No Violations Noted. Major Areas Inspected:Various Aspects of RP Program Including Radioactive Waste Processing,Storage,Packaging & Transportation & General RP Practices IR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support ML20217F5551999-10-0808 October 1999 Insp Rept 70-7002/99-12 on 990810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000346/19990101999-10-0808 October 1999 Insp Rept 50-346/99-10 on 990802-0913.One NCV Occurred. Major Areas Inspected:Operations,Maint & Engineering IR 05000254/19990011999-10-0707 October 1999 Insp Repts 50-254/99-01 & 50-265/99-01 on 990721-0908.No Violations Noted.Major Areas Inspected:Initiating Events, Mitigating Sys & Barrier Integrity IR 05000331/19990111999-10-0707 October 1999 Insp Rept 50-331/99-11 on 990820-0930.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990111999-10-0707 October 1999 Insp Rept 50-341/99-11 on 990724-0908.Two NCVs Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000373/19990151999-10-0606 October 1999 Insp Repts 50-373/99-15 & 50-374/99-15 on 990729-0916.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19990121999-10-0606 October 1999 Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems ML20212K9161999-10-0404 October 1999 Notice of Violation from Insp on 990720-0907.Violation Noted:Between 990720 & 0907,plant Staff Granted Personnel Unescorted Access to Controlled Access Area That Had Not Received General Employee or site-specific Training ML20212K9301999-10-0404 October 1999 Insp Rept 70-7001/99-10 on 990720-0907.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program PNO-III-99-045, on 991001,brush Fire Was Reported on Licensee Site in Unused Area one-fourth to one-half Mile from Plant Itself.Massac County Fire Dept Responded with Two Trucks & Tanker & Extinguished Fire in About 1 H1999-10-0101 October 1999 PNO-III-99-045:on 991001,brush Fire Was Reported on Licensee Site in Unused Area one-fourth to one-half Mile from Plant Itself.Massac County Fire Dept Responded with Two Trucks & Tanker & Extinguished Fire in About 1 H IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000155/19990051999-09-30030 September 1999 Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted.Major Areas Inspected: Routine Decommissioning Insp Covered Aspects of Facility Mgt & Control & Decommissioning Support Activities PNO-III-99-044, on 990928,all Nuclear Fuel Processing & Fabrication Activities Were Shut Down,After Plant Employees Represented by Teamsters Union Voted to Go on Strike.Union Represents 112 Employees at Plant.Region III Was Notified1999-09-30030 September 1999 PNO-III-99-044:on 990928,all Nuclear Fuel Processing & Fabrication Activities Were Shut Down,After Plant Employees Represented by Teamsters Union Voted to Go on Strike.Union Represents 112 Employees at Plant.Region III Was Notified ML20217J1361999-09-30030 September 1999 Notice of Violation from Investigation on 971028-980921. Violation Noted:During Jan 1997,QV Dept Discriminated Against Qv Inspector,For Having Engaged in Protected Activities IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000266/19990151999-09-30030 September 1999 Insp Repts 50-266/99-15 & 50-301/99-15 on 990830-0903.No Violations Noted.Major Areas Inspected:Operations & Training ML20217J1481999-09-30030 September 1999 Notice of Violation from Investigation Conducted from 991028-980921.In Jan 1997,CH Tewksbury Engaged in Deliberate Misconduct That Caused Util to Be in Violation of 10CFR50.7 IR 05000266/19990131999-09-29029 September 1999 Insp Repts 50-266/99-13 & 50-301/99-13 on 990714-0830.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20212J0251999-09-29029 September 1999 Insp Rept 70-0036/99-04 on 990907-10.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance Activities & Plant Support IR 05000282/19990071999-09-28028 September 1999 Insp Repts 50-282/99-07 & 50-306/99-07 on 990721-0831. Non-cited Violations Noted.Major Areas Inspected:Followup Y2K Readiness Review PNO-III-99-043, on 990923,patient Being Treated for Cancer of Esophagus,Received Radiation Dose to Unintended Area of Esophagus During First of Two Treatments Using High Dose Rate Afterloading Treatment Device with About 10 Ci Ir-1921999-09-27027 September 1999 PNO-III-99-043:on 990923,patient Being Treated for Cancer of Esophagus,Received Radiation Dose to Unintended Area of Esophagus During First of Two Treatments Using High Dose Rate Afterloading Treatment Device with About 10 Ci Ir-192 IR 05000263/19993011999-09-27027 September 1999 NRC Operator Licensing Exam Rept 50-263/99-301(including Completed & Graded Tests) for Tests Administered on 990823-26.Both Applicants Passed All Sections of Exam ML20212F1181999-09-22022 September 1999 Insp Rept 70-7001/99-12 on 990830-0902.No Violations Noted. Major Areas Inspected:Security Insp Including Physical, Storage & Control of Classified Matter,Classification, Communications Security & Computer Security PNO-III-99-042, on 990921,large Sanitary Water Line Ruptured at Portsmouth Gaseous Diffusion Plant,Causing Loss of Sanitary Water to Plant.Resident Inspector Monitored Plant Response to Incident.State of Oh,Oh EPA & NRC Ctr Contacted1999-09-21021 September 1999 PNO-III-99-042:on 990921,large Sanitary Water Line Ruptured at Portsmouth Gaseous Diffusion Plant,Causing Loss of Sanitary Water to Plant.Resident Inspector Monitored Plant Response to Incident.State of Oh,Oh EPA & NRC Ctr Contacted IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000254/19990171999-09-15015 September 1999 Insp Repts 50-254/99-17 & 50-265/99-17 on 990823-27.No Violations Noted.Major Areas Inspected:Pilot Baseline Insp for Annual Review of Changes to Safety Analysis Rept & Biennial Review Permanent Plant Mod IR 05000440/19990131999-09-13013 September 1999 Insp Rept 50-440/99-13 on 990712-30.Violations Noted. Major Areas Inspected:Effectiveness of Pnpp Program for Identification,Resolution & Prevention of Technical Issues & Problems That Could Degrade Quality of Plant Operations IR 05000282/19990101999-09-10010 September 1999 Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12. Non-cited Violations Noted.Major Areas Inspected:Physical Protection Cornerstone,Within Safeguards Strategic Assessment Area IR 05000254/19990161999-09-0909 September 1999 Errata to Insp Repts 50-254/99-16 & 50-265/99-16 Conducted on 990819.Administrative Error Was Corrected on Page 8 of Subj Rept.One Open Item Was Deleted & re-numbering of Two Other Items Were Identified IR 05000440/19990091999-09-0909 September 1999 Insp Rept 50-440/99-09 on 990709-0825.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000282/19990111999-09-0909 September 1999 Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.NCV Noted.Major Areas Inspected:Public Radiation Safety & Included Review of Performance Indicators for Occupational & Public Radiation Safety IR 05000266/19993011999-09-0808 September 1999 NRC Operator Licensing Exam Repts 50-266/99-301OL & 50-301/99-301OL (Including Graded Tests) for Tests Administered on 990726-0802 IR 05000373/19990141999-09-0808 September 1999 Insp Repts 50-373/99-14 & 50-374/99-14 on 990809-13.No Violations Noted.Major Areas Inspected:Quality of Emergency Preparedness Program,Related Audits & Emergency Response Facilities & Equipment ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-III-99-041, on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found1999-09-0303 September 1999 PNO-III-99-041:on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found IR 05000331/19990081999-09-0202 September 1999 Insp Rept 50-331/99-08 on 990712-16 & 0810-12.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Programs 1999-09-09 |
_ - _ _ _ _ _ - _
'RELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-III-88 ) ate Apri_l- 28,.1988
()W b. f(A ?l.)
Ik/meliminary notification constitutes EARLY notice of events of v
)L; 1I safety or public interest significance. The information is as int v ly received without verification or evaluation -and is basically all that is known by the Region III staff on this date.
acility: Amersham Corporation Licensee Emergency Classification:
Arlington Heights Illinois Notification of an Unusual Event (AgreementStateLicensee) Alert '
Site Area Emergency General Emergency
_X_Not Applicable
Subject:
LOST MEDICAL BYPRODUCT MATERIAL PACKAGE REC =Dn: .
The Illinois _ Department of Nuclear Safety notified the NRC ~(Region III) lst 11:00 a.m. on April 27, 1988 l:ontaining a total of 160 mil 11 curies of a lost byp&s d%ot&pesliiWeludingroduct material package of var l phosphorus-32 iodine-125, hydrogen-3 and chromium-51. The package was-lto be shipped to Toronto, Canada. The material was intended for medical luse. The state has determined that the shipment did arrive at O' Hare International Airport. American Airlines has issued an all points bulletin describing the lost package. Region III will monitor t'e state's recovery lefforts. /
Th/~~4 formation is current as of 8:05 a.m., April 28, 1988.
Dh C/R Distribution: Chm, Cmrs, GPA, GC, Cf , PDR, Historian, SECY, Records.
Q .
97103001{4 880428 l DR 88-042 PDR l pNO- I l
. A