Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P234 + (14:38:47, 10 December 2024)
- 05000423/LER-1986-033, :on 860429,low Level Waste Tank Discharged W/Radiation Monitor Sample Pump Deenergized,Rendering Liquid Effluent Monitoring Instrumentation Inoperable.Caused by Operator Error + (14:38:49, 10 December 2024)
- ML20198P227 + (14:38:50, 10 December 2024)
- ML20198P220 + (14:38:56, 10 December 2024)
- ML20198P221 + (14:38:56, 10 December 2024)
- ML20198P219 + (14:38:57, 10 December 2024)
- 3F1197-28, Forwards Addl Info to Clarify Matl Included in Attachment G to EDG Test Plan of .Info Does Not Alter Any Conclusions of TS Change Request Notice 210 & Ltr Contains Info Requested by NRC in 971028 Meeting.Commitments Encl + (14:39:00, 10 December 2024)
- ML20198P216 + (14:39:00, 10 December 2024)
- 3F1197-33, Submits Response Relative to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Attachment Identifies Commitments Made in Ltr + (14:39:01, 10 December 2024)
- ML20198P213 + (14:39:01, 10 December 2024)
- IR 05000213/1986008 + (14:39:02, 10 December 2024)
- ML20198P206 + (14:39:03, 10 December 2024)
- ML20198P200 + (14:39:04, 10 December 2024)
- ML20198P204 + (14:39:04, 10 December 2024)
- ML20198P198 + (14:39:05, 10 December 2024)
- ML20198P197 + (14:39:06, 10 December 2024)
- ML20198P196 + (14:39:07, 10 December 2024)
- ML20198P194 + (14:39:08, 10 December 2024)
- ML20198P193 + (14:39:08, 10 December 2024)
- ML20198P189 + (14:39:09, 10 December 2024)
- ML20198P192 + (14:39:09, 10 December 2024)
- ML20198P186 + (14:39:10, 10 December 2024)
- ML20198P188 + (14:39:10, 10 December 2024)
- ML20198P183 + (14:39:11, 10 December 2024)
- ML20198P181 + (14:39:12, 10 December 2024)
- ML20198P182 + (14:39:12, 10 December 2024)
- ML20198P179 + (14:39:13, 10 December 2024)
- ML20198P176 + (14:39:13, 10 December 2024)
- ML20198P175 + (14:39:15, 10 December 2024)
- ML20198P174 + (14:39:15, 10 December 2024)
- LIC-97-0169, Responds to NRC Re Violations Noted in Insp Rept 50-285/97-13 on 970630-0718.Corrective Actions:Review of Category B Valves Tested Under IST Program Was Performed to Identify Valves That Are Ganged Together + (14:39:16, 10 December 2024)
- ML20198P172 + (14:39:16, 10 December 2024)
- ML20198P168 + (14:39:17, 10 December 2024)
- LIC-97-0168, Constitutes Withdrawal of Request for Exemption from 10CFR73.55(d)(5),allowing Use of Biometric Hand Geometry Reader Sys to Interface W/Existing Access Control Card Reader Sys in Controlling Unescorted Access + (14:39:18, 10 December 2024)
- ML20198P163 + (14:39:20, 10 December 2024)
- ML20198P161 + (14:39:24, 10 December 2024)
- ML20198P160 + (14:39:26, 10 December 2024)
- ML20198P157 + (14:39:27, 10 December 2024)
- ML20198P156 + (14:39:27, 10 December 2024)
- NSD-NRC-97-5409, Forwards W Responses to RAIs 640.98 & 640.99 Re Comments from Human Factors Assessment Branch on Rev 3 of AP600 Certified Design Matl Including ITAAC as Requested in Ltr from Staff + (14:39:28, 10 December 2024)
- ML20198P154 + (14:39:28, 10 December 2024)
- 05000327/LER-1986-020, :on 860501,quarterly Function Test for Sys Generator Blowdown Sys & Condenser Vacuum Exhaust Flow Instrumentation Not Performed.Caused by Not Including Channel in Procedure.Instruction Revised + (14:39:30, 10 December 2024)
- ML20198P151 + (14:39:31, 10 December 2024)
- ML20198P149 + (14:39:32, 10 December 2024)
- ML20198P147 + (14:39:32, 10 December 2024)
- A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 + (14:39:33, 10 December 2024)
- ML20198P141 + (14:39:34, 10 December 2024)
- ML20198P139 + (14:39:34, 10 December 2024)
- ML20198P137 + (14:39:35, 10 December 2024)
- ML20198P135 + (14:39:36, 10 December 2024)
- PNO-I-97-068, on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities + (14:39:37, 10 December 2024)
- ML20198P131 + (14:39:37, 10 December 2024)