ML20198P204
| ML20198P204 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/15/1998 |
| From: | Gibson G SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20198P212 | List: |
| References | |
| NUDOCS 9801220035 | |
| Download: ML20198P204 (1) | |
Text
-
%OUlillifN LAllf 0RM4 e
EDISON An iDt10% /%71RN4flOV41* Lanpany e
- January 15,1998 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for December 1997 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, includir:g documentation of all challenges to pressi'rizer safety valves, for each unit. Enclosures 1 cnd 2 provide the December 1997 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 cr 3.
If you have any questions, please contact Mr. C. E. Williams at (714) 368-6707.
Sincerely, a
Gregory T. Gibson Manager, Compliance Enclosures cc:
E. W. Merschoff, Regional Administratcr, NRC Region IV K. E. Porkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. B. Fields, NRC Project Manager, San Onofre Units 2 C.
J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 g
L
$t u
9001220035 900115 PDR ADOCK 05000361 H
pgg l
.P. O.Ikn i28 s.m Ckmente, CA 920'4 0128
.