Forwards Monthly Operating Repts for Dec 1997 for San Onofre Nuclear Generating Station Units 2 & 3.No Challenges to Pressurizer Safety Valves for Either Unit 2 or 3
ML20198P204
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/15/1998
From: Gibson G
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198P212 List:
References
NUDOCS 9801220035
Download: ML20198P204 (1)


Text

-

%OUlillifN LAllf 0RM4 e

EDISON An iDt10% /%71RN4flOV41* Lanpany e

- January 15,1998 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for December 1997 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, includir:g documentation of all challenges to pressi'rizer safety valves, for each unit. Enclosures 1 cnd 2 provide the December 1997 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 cr 3.

If you have any questions, please contact Mr. C. E. Williams at (714) 368-6707.

Sincerely, a

Gregory T. Gibson Manager, Compliance Enclosures cc:

E. W. Merschoff, Regional Administratcr, NRC Region IV K. E. Porkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. B. Fields, NRC Project Manager, San Onofre Units 2 C.

J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 g

L

$t u

9001220035 900115 PDR ADOCK 05000361 H

pgg l

.P. O.Ikn i28 s.m Ckmente, CA 920'4 0128

.