Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P733 + (14:32:10, 10 December 2024)
- ML20198P734 + (14:32:10, 10 December 2024)
- ML20198P732 + (14:32:11, 10 December 2024)
- B16842, Provides Revised Commitment Stated in Which Responded to Recommendations Made by Little Harbor Consultants Inc During 970603 Meeting + (14:32:12, 10 December 2024)
- ML20198P728 + (14:32:12, 10 December 2024)
- 05000338/LER-1997-008, :on 971027,both EDGs Inoperable During Testing. Caused by TS Surveillance Requirement to Demonstrate Operability of Remaining EDG When One Inoperable.Required TS Actions Cleared Following 1J EDG Testing + (14:32:14, 10 December 2024)
- ML20198P726 + (14:32:15, 10 December 2024)
- ML20198P725 + (14:32:17, 10 December 2024)
- ML20198P723 + (14:32:18, 10 December 2024)
- L-97-049, Submits Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, + (14:32:26, 10 December 2024)
- ML20198P718 + (14:32:29, 10 December 2024)
- ST-HL-AE-5783, Submits 30-day Rept Re Significant Changes to Accepted Large Break LOCA ECCS Evaluation Model at Units 1 & 2 + (14:32:30, 10 December 2024)
- 05000455/LER-1997-003-08, :on 971010,reactor Trip Occurred,Due to age-related Failures of Redundant Power Supplies That Went Undetected by Alarm Sys.Modification to Power Supply Failure Alarm Will Be Submitted to TRC for Review + (14:32:32, 10 December 2024)
- ML20198P713 + (14:32:33, 10 December 2024)
- ML20198P712 + (14:32:33, 10 December 2024)
- ML20198P710 + (14:32:34, 10 December 2024)
- ML20198P706 + (14:32:35, 10 December 2024)
- ML20198P709 + (14:32:35, 10 December 2024)
- ML20198P705 + (14:32:36, 10 December 2024)
- ML20198P703 + (14:32:37, 10 December 2024)
- ML20198P702 + (14:32:37, 10 December 2024)
- BSEP-97-0454, Application for Amends to Licenses DPR-71 & DPR-62,revising Design Basis Qualification Requirements for CREVS & CREVS Instrumentation,For Limited Period of Time + (14:32:38, 10 December 2024)
- ML20198P699 + (14:32:39, 10 December 2024)
- 05000454/LER-1997-016-04, :on 971007,projected SG Leak Rate Combined with TS Limit for Dose Equivalent Iodine Creates Potential for Operation Outside Design Basis.Caused by Projected Leakage & Leakrate Limits.Sg Are Being Replaced + (14:32:41, 10 December 2024)
- ML20198P695 + (14:32:42, 10 December 2024)
- ML20198P696 + (14:32:42, 10 December 2024)
- ML20198P690 + (14:32:43, 10 December 2024)
- ML20198P692 + (14:32:43, 10 December 2024)
- ML20198P689 + (14:32:44, 10 December 2024)
- ML20198P684 + (14:32:45, 10 December 2024)
- ML20198P687 + (14:32:45, 10 December 2024)
- ML20198P680 + (14:32:46, 10 December 2024)
- ML20198P676 + (14:32:47, 10 December 2024)
- U-602857, Provides 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Util Will Submit Info Requested within 90 Days + (14:32:47, 10 December 2024)
- ML20198P674 + (14:32:48, 10 December 2024)
- ML20198P673 + (14:32:49, 10 December 2024)
- BSEP-97-0488, Provides 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Commitment Made by Util,Encl + (14:32:50, 10 December 2024)
- ML20198P672 + (14:32:50, 10 December 2024)
- ML20198P669 + (14:32:51, 10 December 2024)
- ML20198P670 + (14:32:51, 10 December 2024)
- ML20198P666 + (14:32:52, 10 December 2024)
- ML20198P660 + (14:32:53, 10 December 2024)
- ML20198P664 + (14:32:53, 10 December 2024)
- ML20198P659 + (14:32:54, 10 December 2024)
- ML20198P656 + (14:32:55, 10 December 2024)
- ML20198P657 + (14:32:55, 10 December 2024)
- ML20198P654 + (14:32:56, 10 December 2024)
- ML20198P655 + (14:32:56, 10 December 2024)
- L-97-052, Proposed TS Change Request 243 to License DPR-66,modifying TS Table 3.3-4 Re Emergency Bus Undevoltage Trip Setpoint, Allowable Valve & Time Delay for DG Start + (14:32:57, 10 December 2024)
- ML20198P650 + (14:32:57, 10 December 2024)
- ML20198P648 + (14:32:58, 10 December 2024)
- ML20198P647 + (14:32:59, 10 December 2024)