Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199B850 + (13:29:47, 10 December 2024)
- ML20199B848 + (13:29:48, 10 December 2024)
- ML20199B847 + (13:29:49, 10 December 2024)
- ML20199B841 + (13:29:51, 10 December 2024)
- ML20199B839 + (13:29:51, 10 December 2024)
- ML20199B838 + (13:29:52, 10 December 2024)
- ML20199B837 + (13:29:52, 10 December 2024)
- ML20199B835 + (13:29:53, 10 December 2024)
- ML20199B834 + (13:29:54, 10 December 2024)
- ML20199B830 + (13:29:54, 10 December 2024)
- ML20199B828 + (13:29:55, 10 December 2024)
- 05000362/LER-1997-003-02, :on 971218,determined That Pressurizer Safety Valve Setpoints Were Out of Tolerance.Caused by Setpoint Drift.Valves Will Be Disassembled,Inspected,Reassembled & Reset by Proper Personnel + (13:29:57, 10 December 2024)
- ML20199B825 + (13:29:58, 10 December 2024)
- ML20199B820 + (13:30:19, 10 December 2024)
- ML20199B815 + (13:30:20, 10 December 2024)
- ML20199B812 + (13:30:21, 10 December 2024)
- ML20199B813 + (13:30:21, 10 December 2024)
- ML20199B810 + (13:30:22, 10 December 2024)
- ML20199B809 + (13:30:22, 10 December 2024)
- ML20199B808 + (13:30:23, 10 December 2024)
- ML20199B803 + (13:30:25, 10 December 2024)
- ML20199B800 + (13:30:26, 10 December 2024)
- ML20199B801 + (13:30:26, 10 December 2024)
- ML20199B799 + (13:30:27, 10 December 2024)
- ML20199B797 + (13:30:27, 10 December 2024)
- ML20199B796 + (13:30:28, 10 December 2024)
- ML20199B794 + (13:30:29, 10 December 2024)
- ML20199B790 + (13:30:30, 10 December 2024)
- ML20199B789 + (13:30:30, 10 December 2024)
- ML20199B787 + (13:30:37, 10 December 2024)
- ML20199B785 + (13:30:37, 10 December 2024)
- ML20199B780 + (13:30:39, 10 December 2024)
- ML20199B778 + (13:30:40, 10 December 2024)
- ML20199B777 + (13:30:40, 10 December 2024)
- NSD-NRC-97-5436, Forwards Response to NRC RAI on AP600 Solid Waste Storage Capacity.W Status for FSER Open Item 460.28F Will Be Changed to Action N + (13:30:41, 10 December 2024)
- ML20199B773 + (13:30:41, 10 December 2024)
- ML20199B772 + (13:30:42, 10 December 2024)
- ML20199B769 + (13:30:44, 10 December 2024)
- PNO-V-86-031, on 860609,operation Resumed After Completing First Refueling Outage.Licensee Plans to Complete post-refueling Startup Testing & Fuel Preconditioning. Facility May Be Placed in Reserve Shutdown Status + (13:30:44, 10 December 2024)
- A97063, Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event + (13:30:45, 10 December 2024)
- ML20199B767 + (13:30:45, 10 December 2024)
- B16852, Monthly Operating Rept for Oct 1997 for Millstone Nuclear Power Station,Unit 1 + (13:30:46, 10 December 2024)
- ML20199B759 + (13:30:47, 10 December 2024)
- ML20199B758 + (13:30:47, 10 December 2024)
- 05000317/LER-1986-002, :on 860322,shutdown Cooling Return motor- Operated Valve in Suction Line of LPSI Pump Inadvertently Closed.Caused by Failure in Procedures to Ensure That Test Input Signal Will Not Close Valve + (13:30:50, 10 December 2024)
- ML20199B756 + (13:30:51, 10 December 2024)
- ML20199B755 + (13:30:51, 10 December 2024)
- ML20199B751 + (13:30:52, 10 December 2024)
- ML20199B754 + (13:30:52, 10 December 2024)
- ML20199B749 + (13:30:53, 10 December 2024)
- ML20199B746 + (13:30:54, 10 December 2024)