Text
-a
.s November 7,T1997-Southern Nuclear Operating. Company Inc.
ATTN: Mr. C. /.. McCoy.
Vice President-P. O. Box:1295 Birmingham -AL 35201-1295 l
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - V0GTLE-
Dear Mr. McCoy:
On October l9.1997 the regional staff completed the semiannual Plant Performance Review (PPR)-for Vogtle. -The staff conducts these reviews for all operating nuclear power plants to develop and integrate understanding-of safety performance. The results are used by regional management to facilitate planning and allocation-of inspection resources.
The PPR for Vogtle involved the participation of all Region 11 technical divisions in evaluating inspection results and safety aerformance information for the period from LMarch 1 to August 31, 1997, P)Rs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance and senior management meeting reviews.
This ' letter advises you of our planned inspection effort resulting from the Vogtle PPR review and the general time frame of planned inspections plus the exact dates of. team inspections.
It is 3rovided to minimize the resource
-impact on your staff and to allow for scleduling conflicts and personnel availability to be resolved in advance of inspector-arrival onsite.
The
-enclosure details our inspection plan for the next six months.
Indiviaual 4
inspections are identified by the month (s)-in which we intend to conduct the inspection.
Exact dates are not provided for non-team inspections because experience has-proven'that we must often change dates as a result of higher priority requirements and conflicts at your site or other sites.
You will be contacted three to six weeks prior to individual inspections to confirm dates.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the' reasons for emphasis in these program areas.
Resident inspections are not listed due to their engoing and continuous nature;
- The.NRCls, general policy for reactor inspections is that each insaection shall be announced c except when-announcing the inspection could reasonaMy compromise the objectives of the inspectors. Therefore, some_ specific insp6ctions'. such as in the security and radiological protection areas, may not'be announced.
)'
9711190119-971107
\\
PDR ADOCK 05000424 5
-e PDR m
3 SNC 2
- As part-of the regional initiative-' inspection program, we plan to conduct six months. pections of fire barrier penetration seal issues during the next followup ins The issues are. discussed-in Information Notice (IN) 88-04.
Inadequate Qualification and Documentation of Fire Barrier Penetration Seals," and IN 88-56. " Potential Problems with Silicone Foam Fire Barrier Penetration Seals.".The specific plants that will be inspected have not yet been determined. We will notify you separately if the inspections are
~
scheduled at your facility in the next six months.
We will inform you of any changes to the inspection plan.
If you have any questions. please contact me at-(404) 562-4520.
Sincerely.
(Original signed by Pierce H. Skinner)
Pierce H. Skinner. Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-424.:50-425 License Nos. NPF-68. NPF-81
Enclosure:
Inspection Plan cc w/ encl:
J. D. Woodard Executive Vice President Southern Nuclear Operating Company. Inc.
P. O. Box 1295 Birmingham. AL 35201-1295 J.- B. Beasley General Manager Plant Vogtl Southern Nuclear Operating Company, Inc.
P. O. Box 1600 Waynesboro, GA 30830 t
J. A. Bailey Manager-Licensing Southern Nuclear Operating Company. Inc.
P. O. Box 1295-birmingham AL 35201-1295 cc w/ encl cont'd: -(See Page 3)
~
i b
4 SNC 3
- cc w/ encl: Continued Jim Hurt.. Director Consumers' Utility-Counsel Division Governor's Office of Consumer Affairs 2 M. L. King Jr. Drive-Plaza level - East: Suite 356-Atlanta.-GA: 30334-4600 Office of Planning and Budget
- Room 61EB 270 Washington 1 Street. SW Atlanta. M-30334 Office of the County Commissioner Burke County Commission Waynesboro GA-30830
- Harold Reheis. Director Department of Natural Resources 205 Butler Street. SE. Suite 1252
- Atlanta, GA :30334 Thomas Hill. Manager Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta. GA 30354 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 R. D. Barker Program Manager Fossil: & Nuclear Operations Oglethorae-Power Corporation 2100 E.
Exchange Place Tucker. GA 30085-1349 Charles A. Patrizia. Esq.
Paul.- Hastings. Janofsky & Walker 10th Floor 1299 Pennsylvania / venue-Washington. D, Cs 20004-9500 cc w/ encl cont'd: -(See Page 4)
W 4
5 SNC:
- 4
-)
- Steven M,lJacksoni
- cc w/ encl: 1 Continued
- JSenior Engineerf-_ Power Supply-
- Municipal Electric 1 Authority of-Georgiae
- 1470 Riveredge Parkway NW:
i Atlanta, GA 30328 4684-
- Distribution'w/ enc 1:
P;-$kinner. Ril
~
RF Carrion;: RIl- -
~,
'W.-P. Kleinsorgei Ril'
'M 'EL Ernstes. RII.
L.LWheeler NRR-1
-PUBLIC-r NRC' Senior-Resident l Inspector-U.S. Nuclear Regulatory Comission 8805 River Road-Waynesboro;sGA-. 30830:
t e
5
- SEE PREVIOUS _CONCU_RRENCE ONIff 9ff ORP'
Rf ? MODS 9 Rff PPS TfB'
-SIGNATURE NAME RPCarrion:dka*
PEfredrickson*
H0Christensen*
TAPeebles*
KPBarr*
GABelisle*-
DATE 11 /
l 97 11 / ~ ' / 97
'll '/~'
/ 97 11 / '
/ 97 11 /
/ 97 11 t'
/ 97
~
COPY 7 i YE5 -
NO YES -
NO YE$
NO
- TES -
- NO -
YES NO 4ES NO -
OfF NI A httVKu.t.urt..
. LXX,UMt.M MM. G; WUuiLE\\FFhVU6,LIR
.t 4
i 4
I T
I 4
er
}
s' 4
e
.#+--'su h
e,A s+
r d--
m 4 m -,.
M M-t-
y*, FIT f
r-F Cf-t' T#
SNC=
4 Distribution w/ encl: Continued-
.W.-P; Kleinsorge. RII~
M. E. Ernstes. Ril L. Wheeler. NRR PUBLIC NRC Senior Resident Inspector U.S. Nuclear Regulatory Comission
.8805 River Road Waynesboro',~ - GA - -30830 i
T Orrttr pi t.tpo pt!.ms up =
pit. cps.pg ptt Dog.n una pit-@s.pse ott.co w in
{}
k hp.
$1GNAYWE My
- Carrion-dka PtfrhrickTon ~
N0Christensen-TAPeebles PBarr
'GA8el151eJ)
DAll
'10/2.7/97 10 / V / 97-10l%)/ O -
MV7)/U 10 /Y / U LO b3 0 COPY?
h) NO YE5 '
NO -
[ TEM NO
( YES)
' NO pf)
- NO \\'[VE4 NO ortiu m wun.
ooutui we uavuumm.us v
i
--)
s
Ay V0GTLE INSPECTION PLAN'
- m. -
INSPECTION TITLE / PROGRAM AREA
-APPR0XIMATE-NUMBER OF
. INSPECTION-DATES INSPECTORS TYPE / COMMENTS-IP 71714 Cold Weather Protection 11/97 N/A Regional Initiative (Resident.
(Region-wide effort' Staff) based on previous issues)-
IP 81700 Physical Security 01/98 1
Core Inspection' IP 62706 Maintenance Rule Baseline Inspection 01/26/98 7
Generic Safety-Issue.
(Team)
IP 70001-Operator Licensing Requalification Exams 03/98 1
Core Inspection IP 83750 Occupational Radiation Exposure 03/98 1
Core Inspection IP 37550 Engineerim - Outage 04/98 1-Core Inspection' IP 73753 Inservice Inspection 04/98 1-Core Inspection-
..P - Inspection Procedure Core Inspection - Minimum NRC Inspection Program (mandatory all plants) 2 t
4 6
P Enclosure
-