Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199F712 + (12:41:55, 10 December 2024)
- ML20199F713 + (12:41:55, 10 December 2024)
- 05000482/LER-1986-027, :on 860524,Tech Spec 3.7.11 Found Violated Due to Missed Hourly Fire Watch Patrol Between 2 & 3 Am in Auxiliary Bldg.Caused by Cognitive Personnel Error by Fire Watch Individual.Personnel Reinstructed + (12:41:58, 10 December 2024)
- ML20199F706 + (12:41:59, 10 December 2024)
- ML20199F705 + (12:42:00, 10 December 2024)
- ML20199F701 + (12:42:01, 10 December 2024)
- 1CAN019901, Forwards Rev 8 to ANO-1 Simulator Performance Testing Rept. All Performance Issues Identified During Operability Testing Have Been Corrected.New Malfunctions Were Tested & Incorporated Into Continuing Testing + (12:42:01, 10 December 2024)
- ML20199F699 + (12:42:02, 10 December 2024)
- ML20199F696 + (12:42:05, 10 December 2024)
- ML20199F697 + (12:42:05, 10 December 2024)
- ML20199F692 + (12:42:06, 10 December 2024)
- ML20199F695 + (12:42:06, 10 December 2024)
- ML20199F691 + (12:42:07, 10 December 2024)
- ML20199F690 + (12:42:08, 10 December 2024)
- PNO-III-98-043, on 980904,licensee Reported Potential Discrepancy Between Dose Calibrator Measurements & Liquid Scintillation Counter Measurements Indicating Dose Administered to Patient Less than 20% of Prescribed Dose + (12:42:10, 10 December 2024)
- ML20199F685 + (12:42:11, 10 December 2024)
- ML20199F686 + (12:42:11, 10 December 2024)
- ML20199F683 + (12:42:13, 10 December 2024)
- PNO-III-98-042, on 980804,researcher Identified Contamination on Gloves & Finger After Radioiodination Procedure.Several Unsuccessful Attempts Were Made to Decontaminate Finger. Cause Under Investigation + (12:42:13, 10 December 2024)
- ML20199F681 + (12:42:14, 10 December 2024)
- PNO-III-98-041, on 980831,misadministration Occurred During Cervical Cs-137 Brachytherapy Cancer Treatment.Patient Removed Applicator 10 H Into 31 H Treatment.Radiation Safety Officer & Onocologist Recovered & Secured Source + (12:42:14, 10 December 2024)
- PNO-III-98-040, on 980821,licensee Reported Radiography Technician May Have Received Above Normal Radiation Exposure at Jon Site in Mishawaka,In.Individual Mistakenly Entered Controlled Area + (12:42:15, 10 December 2024)
- ML20199F679 + (12:42:15, 10 December 2024)
- ML20199F675 + (12:42:17, 10 December 2024)
- ML20199F674 + (12:42:17, 10 December 2024)
- PNO-III-98-050, on 981027,patient Being Treated for Uterine Cancer Received 5,000 Centigray Dose Instead of Prescribed 4,000 Centigray Dose.Caused by Calculational Error & Computer Program Error + (12:42:18, 10 December 2024)
- ML20199F671 + (12:42:19, 10 December 2024)
- PNO-III-98-046, on 980922,unplanned Contamination Occurred When 2-3 Milliliters of I-131 Solution Dripped Onto Floor in Lab.Individuals Were Decontaminated with Minor Contamination Remaining After Procedure + (12:42:19, 10 December 2024)
- ML20199F666 + (12:42:20, 10 December 2024)
- ML20199F665 + (12:42:21, 10 December 2024)
- PNO-III-98-044, on 980902,during Routine self-assessment Licensee Discovered Several Broken Fire Control Devices Containing Curie Quantities of Tritium Gas Unbagged in Storage Room + (12:42:21, 10 December 2024)
- ML20199F662 + (12:42:22, 10 December 2024)
- ML20199F661 + (12:42:22, 10 December 2024)
- ML20199F658 + (12:42:23, 10 December 2024)
- ML20199F657 + (12:42:24, 10 December 2024)
- ML20199F656 + (12:42:24, 10 December 2024)
- ML20199F655 + (12:42:25, 10 December 2024)
- HL-5506, Forwards Response to 970923 Request for Rept of Info Based on Results of Insps of Ei Hatch Nuclear Plant Torus Structures + (12:42:26, 10 December 2024)
- 05000322/LER-1986-023, :on 860520,Action Statement 120 of Tech Spec 3.3.7.11 Requiring Noble Gas Grab Samples Not Met.Caused by Poor Communication Between Technicians During Shift Change. Mgt Notified & Shift check-off List Revised + (12:42:28, 10 December 2024)
- ML20199F650 + (12:42:29, 10 December 2024)
- ML20199F651 + (12:42:29, 10 December 2024)
- ML20199F648 + (12:42:30, 10 December 2024)
- ML20199F647 + (12:42:30, 10 December 2024)
- 05000440/LER-1997-015, :on 971019,failure of Containment Penetration Leak Rate Test Was Noted.Caused by Failures of Valves to Maintain Test Pressure.Valve Body Seat Was Machined & Lapped to Achieve Proper Finish + (12:42:32, 10 December 2024)
- ML20199F644 + (12:42:33, 10 December 2024)
- 05000413/LER-1986-027, :on 860519,automatic Nuclear Svc Water Sys Alignment to Standby Nuclear Svc Water Pond Actuated. Caused by Defective Procedures.Procedure Change 15 to Encls 13.12 & 13.14 of PT/2/A/4200/09A Begun + (12:42:35, 10 December 2024)
- ML20199F640 + (12:42:37, 10 December 2024)
- ML20199F638 + (12:42:38, 10 December 2024)
- ML20199F637 + (12:42:39, 10 December 2024)
- ML20199F635 + (12:42:40, 10 December 2024)
- ML20199F634 + (12:42:43, 10 December 2024)
- ML20199F630 + (12:42:53, 10 December 2024)