ML20199F671

From kanterella
Jump to navigation Jump to search
Responds to 971105 Request for 90 Day Extension to Respond to Demand for Info & Notice of Nonconformance Associated W/Nrc Insp Rept 99900081/97-01.Request for Extension Granted.Submittal of Response No Later than 980227
ML20199F671
Person / Time
Issue date: 11/18/1997
From: Spessard R
NRC (Affiliation Not Assigned)
To: Powers C
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
REF-QA-99900081 99900081-97-01, 99900081-97-1, NUDOCS 9711240297
Download: ML20199F671 (2)


Text

-

e *ec;g y

't.

UNITE 3 STATES NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D.C. 2006 & 4001 h.

f

,8 November 18, 1997 EA 97-495 Mr. Chris M. Powers, Director.

Quality and Regulatory Affairs Siemens Power Corporation - Nuclear Division P.O. Box 130 Richland, WA 99352-0130

SUBJECT:

REQUEST FOR EXTENSION TO RESPOND TO DEMAND FOR INFORMATION AND NOTICE OF NONCONFORMANCE (INSPECTION REPORT 99900031/97-01)

Dear Mr. Powers:

By letisr of Novomber 5,1997, Siemens Power Corporation (SPC) requested a 90 day extent. ton to respond to the Demand for Information and Notice of Nonconformance associated with NRC Inspection Report 99900081/97-01. We have reviewed your request and hereby grant that extension. It is expected that your response will be submitted to the NRC by no lator than February 27,1998.

Your response, to the extent possible, should not include any personal privacy, proprietary, or safguards information so that it can be placed in the POR without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protecteo and a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the basis for your claim of withholding (e.g.,

explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financia! information), if safeguards information is necessary to provide an acceptable respone*, please provide the level of protection described in 10 CFR 73.21.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC's Public Document Room.

Sincerely,

[b D)

O R. Lee S rd, Director g2gg g Division of Reactor Coatrols and Human Factors 99900001 PDR Office of Nuclear Reactor Regulation

,Zbld-/) q Ar ll ll'I.llil,lilli il,11 1

Docket No.: 99900081 e'

cc: See attached f7'd73 (hwai)

MIC fuf CENTER COPY 4Vf07

C. Powers cc :

Mr. David G. McAlees Senior Vice President and General Manager Siemens Power Corporation - Nuclear Division 115108th Avenue, NE P.O. Box 90777 Bellevue, WA 98009-0777

-