Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199H426 + (09:35:00, 8 December 2024)
- ML20199H424 + (09:35:01, 8 December 2024)
- 05000424/LER-1997-010-01, :on 971019,manual RT During CR Drop Time Testing Was Noted.Caused by Failed Detector/Encoder Card in Dpri B Data Cabinet.Crs Were Withdrawn,Selecting Data a Only W/No Valid Rod Deviations Indicated + (06:42:12, 9 December 2024)
- ML20199H420 + (06:42:19, 9 December 2024)
- ML20199H417 + (06:42:22, 9 December 2024)
- ML20199H416 + (06:42:23, 9 December 2024)
- ML20199H413 + (06:42:31, 9 December 2024)
- ML20199H409 + (06:42:32, 9 December 2024)
- ML20199H407 + (06:42:33, 9 December 2024)
- ML20199H406 + (06:42:34, 9 December 2024)
- ML20199H400 + (06:42:35, 9 December 2024)
- ML20199H399 + (06:42:35, 9 December 2024)
- ML20199H392 + (06:42:36, 9 December 2024)
- ML20199H390 + (12:17:35, 10 December 2024)
- 05000373/LER-1997-038, :on 971020,inadequate Calibr of HR Instrumentation Was Noted.Caused by Misinterpretation of Ts. Channel Functional Testing Requirements for HR Sys Will Be Corrected Through Procedure Changes + (12:17:40, 10 December 2024)
- ML20199H386 + (12:17:41, 10 December 2024)
- NRC-98-0016, Forwards Certified Copies of Listed Nuclear Liability Insurance Documents + (12:17:42, 10 December 2024)
- ML20199H381 + (12:17:43, 10 December 2024)
- ML20199H379 + (12:17:48, 10 December 2024)
- ML20199H378 + (12:17:48, 10 December 2024)
- 05000213/LER-1986-011, :on 860228,discovered That Fire Protection Water Sys Line & Sprinkler Line Inadvertently Isolated on 860226.Caused by Misinterpretation of Tech Specs.Hourly Fire Watch Established + (12:17:51, 10 December 2024)
- ML20199H375 + (12:17:54, 10 December 2024)
- ML20199H374 + (12:17:56, 10 December 2024)
- ML20199H371 + (12:17:57, 10 December 2024)
- ML20199H373 + (12:17:57, 10 December 2024)
- ML20199H369 + (12:18:14, 10 December 2024)
- ML20199H368 + (12:18:15, 10 December 2024)
- ML20199H367 + (12:18:15, 10 December 2024)
- ML20199H366 + (12:18:16, 10 December 2024)
- ML20199H365 + (12:18:17, 10 December 2024)
- ML20199H363 + (12:18:18, 10 December 2024)
- ML20199H362 + (12:18:19, 10 December 2024)
- ML20199H361 + (12:18:20, 10 December 2024)
- ML20199H359 + (12:18:21, 10 December 2024)
- ML20199H358 + (12:18:22, 10 December 2024)
- ML20199H356 + (12:18:32, 10 December 2024)
- ML20199H355 + (12:18:32, 10 December 2024)
- U-602869, Monthly Operating Rept for Oct 1997 for Clinton Power Station,Unit 1 + (12:18:33, 10 December 2024)
- ML20199H350 + (12:18:34, 10 December 2024)
- ML20199H351 + (12:18:34, 10 December 2024)
- RC-97-0236, Requests That NRC Exercise Discretion Not to Enforce Compliance to AOT for Addl 12 H Beyond Expiration of Listed Date & Times,Per TS 3.8.1.1.b + (12:18:38, 10 December 2024)
- ML20199H347 + (12:18:39, 10 December 2024)
- ML20199H343 + (12:18:40, 10 December 2024)
- JPN-99-002, Forwards Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 + (12:18:48, 10 December 2024)
- ML20199H333 + (12:18:49, 10 December 2024)
- 05000352/LER-1997-010, Forwards LER 97-010-00 Re Condition Outside Design Basis Involving Suppression Chamber Steam Bypass Leakage Path, Which Occurred on 841026 & 890812 + (12:18:49, 10 December 2024)
- ML20199H330 + (12:18:50, 10 December 2024)
- ML20199H327 + (12:18:51, 10 December 2024)
- ML20199H325 + (12:18:52, 10 December 2024)
- 3F0198-42, Forwards Rev 8 to Abnormal Procedure (AP) 961, Earthquake, as Supplemental Response for Resolution of USI A-46 + (12:18:53, 10 December 2024)
- JAFP-99-0012, Documents Util Position Re Methodology for LPRM Calibr During Reactor Operation Using Traversing In-core Probe Sys + (12:18:54, 10 December 2024)
- ML20199H323 + (12:18:54, 10 December 2024)