Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-37-110, Forwards Response to Rev 1 to Generic Ltr 92-01, Reactor Vessel Structural Integrity, Per 10CFR50.60 & 10CFR50.61 & Commitments Made in Response to Generic Ltr 88-11 + (July 2, 1992)
- ELV-03865, Comment Supporting Proposed Rule 10CFR50.63 Re Loss of All Alternating Current Power + (July 2, 1992)
- U-602001, Responds to Rev 1 to Generic Ltr 92-01 Re Reactor Vessel Structural Integrity.All Reactor Vessel Beltline Matls Determined to Be Capable of Maintaining Charpy Upper Shelf Energy Above 50-ft Pounds + (July 2, 1992)
- HL-2292, Forwards Response to GL 92-01,Rev 1 Re Reactor Vessel Structural Integrity + (July 2, 1992)
- HL-2280, Suppls Containing Commitments to Comply W/Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance,Per Findings in Insp Repts 50-321/92-04 & 50-366/92-04.Exceptions for in Situ Testing Discussed + (July 2, 1992)
- PY-CEI-NRR-1500, Forwards Response to Rev 1 to Generic Ltr 92-01, Reactor Vessel Structural Integrity. Util Utilized Assistance of GE to Performed Technical Analysis to Predict Effects of Neutron Irradiation on Reactor Vessel Matls + (July 2, 1992)
- ML20266F339 + (July 2, 1992)
- 05000352/LER-1992-010, :on 920605,north Stack wide-range Accident Monitor Discovered Inoperable & Unable to Perform Design Function Since 920507.Caused by Equipment Malfunction & Procedure Deficiency.Procedure Revised + (July 2, 1992)
- 05000395/LER-1992-004, :on 920521,reactor Tripped from 9% Power on low-low SG Water Level in C Sg.Caused by Condenser Steam Dump Valves Not Fully Opening on Demand.Transducers Were Replaced W/Lower Impedance Transducers + (July 2, 1992)
- 05000445/LER-1992-011, :on 920618,failure of thermo-lag Fire Barrier Endurance Tests Results in Some Raceways Declared Inoperable.Caused by Inadequate Vendor Installation Specs. Fire Watch Routes Adjusted + (July 2, 1992)
- 05000445/LER-1992-013, :on 920511,loss of Cooling Water Flow to Fuel Pool Heat Exchanger Occurred After Realignment.Caused by Personnel Error.Personnel Retrained & Reevaluated & Heat Exchanger X-02 Has Restricted Use + (July 2, 1992)
- ML20044B543 + (July 2, 1992)
- ML20101N626 + (July 2, 1992)
- ML20101N614 + (July 2, 1992)
- ML20127C693 + (July 2, 1992)
- IR 05000280/1992007 + (July 2, 1992)
- ML18096A809 + (July 2, 1992)
- ML18036A765 + (July 2, 1992)
- GO2-92-157, Requests Change in Reactor Vessel Capsule Withdrawal Schedule.Since Capsule Missed Some early-in-life Exposure, Placing Capsule in Standby Mode Rather than Being Withdrawn at 24 EFPY Appropriate + (July 2, 1992)
- IR 05000237/1992018 + (July 2, 1992)
- ML17157B894 + (July 2, 1992)
- ML17177A520 + (July 2, 1992)
- ML17177A518 + (July 2, 1992)
- ML17177A515 + (July 2, 1992)
- ML17177A511 + (July 2, 1992)
- ML17058A987 + (July 2, 1992)
- ML17058A991 + (July 2, 1992)
- ML18010A678 + (July 2, 1992)
- ML18036A764 + (July 2, 1992)
- ML18036A767 + (July 2, 1992)
- ML20045G617 + (July 2, 1992)
- ML20101K034 + (July 2, 1992)
- ML18058A955 + (July 3, 1992)
- ML18153D056 + (July 3, 1992)
- ML20101R169 + (July 3, 1992)
- ML20101P558 + (July 3, 1992)
- ML20101N479 + (July 3, 1992)
- ML20115F614 + (July 3, 1992)
- BECO-92-071, Forwards Annual Rept of Changes to QA Program Description for Jul 1991 to June 1992 + (July 3, 1992)
- ST-HL-AE-4143, Responds to Unresolved Item Noted in Insp Repts 50-498/92-10 & 50-499/92-10.Corrective actions:off-hours Augmentation Drill Conducted on 920617 & Personnel Reported to Facility within 1 H of Notification Except for Offsite Field Team + (July 3, 1992)
- ST-HL-AE-4133, Revises Commitment in 920311 Response to Emergency Preparedness Exercise Weaknesses Noted in Insp Repts 50-498/90-10 & 50-499/90-10.Use of Digital Dosimeters Will Not Reduce Effectiveness of Dose Monitoring + (July 3, 1992)
- 05000338/LER-1992-014, :on 920608,noted That EDG Response Time Test Procedures Did Not Include Circuit Between 27W Relay & EDG CO2 Trouble Alarm Due to Personnel Errors.Complex Instrumentation SRs Being Reviewed + (July 3, 1992)
- 05000302/LER-1992-011, :on 920605,failure to Install Electrical Isolation Device in Interlock Relay Branch Circuit Results in Potential Loss of Control Power to Containment Isolation Valve.Control Power Will Be Uninterrupted + (July 3, 1992)
- 05000302/LER-1992-010, :on 920604,determined That Inadequate Level of Detail of Initial Plant Design Calculation Causes Operation Outside Design Basis.Control Transformers Replaced W/Larger Control Transformers + (July 3, 1992)
- 05000440/LER-1992-014, :on 920603,steam Supply Pressure Low Isolation Signal & Associated RCIC Sys Isolation Were Initiated.Caused by Procedure Deficiency.Surveillance Instruction ISI-B21-T1300-1 Revised + (July 3, 1992)
- ML13329A171 + (July 3, 1992)
- ML13329A173 + (July 3, 1992)
- ML20141M514 + (January 5, 1992)
- ML20141M512 + (July 5, 1992)
- ML17329A623 + (July 6, 1992)
- ML17289A721 + (June 30, 1992)
- ML17289A715 + (July 6, 1992)
- ML18010A672 + (July 6, 1992)
- ML20101S096 + (July 6, 1992)
- ML20101R793 + (July 6, 1992)
- ML20101R787 + (July 6, 1992)
- ML20101R621 + (July 6, 1992)
- ML20101R593 + (July 6, 1992)
- ML20101R526 + (July 6, 1992)
- ML20101R479 + (July 6, 1992)
- ML20101Q479 + (July 6, 1992)
- ML20101Q403 + (July 6, 1992)
- ML20101P487 + (July 6, 1992)
- ML20101P045 + (July 6, 1992)
- ML20101N929 + (July 6, 1992)