Text
4
Docket No. 50-400
License No. NPF-63
I
4UL 03 H92
Carolina Power and Light Company
ATTN: Mr. R. A. Watson
Senior Vice President
Nuclear Generation
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-400/92-09
I
This refers to the inspection conducted by A. T. Boland of.this office on
June 1-5, 1992.
The inspection included a review of activities authorized for your
Shearon Harris facility. At the conclusion of the inspection, the findings were dis-
cussed with those members of your staff identified in the report.
Areas examined during the inspection are identified in the report.
Within these
areas, the inspection consisted of selective examinations of procedures and
representative
records, interviews with personnel,
and observation of activities in
progress.
Based on the results of this inspection, certain of your activities appeared to be in
violation of NRC requirements.
Because the licensee's efforts in identifying and
correcting the violation meet the criteria in Section V.G. of the Enforcement Policy
and the violation was determined to be isolated with minor safety significance, the
'ssue
regarding the adequacy of leak testing for certain sealed sources will not be
subject to enforcement
action.
In accordance with 10 CFR 2.790(a),
a copy of this letter and its enclosure will be
placed in the NRC Public Document Room.
'9207140121
920702
ADOCK 05000400
8
8
JUL 08
1992
Carolina Power and Light Company
Should you have any questions concerning this letter, please contact us.
Sincerely,
Enclosure:
NRC Inspection Report
illiam E. Cline, Chief
Radiological Protection and
Branch
Division of Radiation Safety
and Safeguards
cc w/encl:
G. E. Vaughn
Vice President
Harris Nuclear Project
P. O. Box 165
New Hill, NC 27562
'.
S. Hinnant
Plant General Manager
Harris Nuclear Plant
P. O. Box 165
New Hill, NC 27562
C. S. Olexik, Jr., Manager
Regulatory Compliance
Harris Nuclear Project
P. O. Box 165
New Hill, NC 27562
H. Ray Starling
Manager - Legal Department
Carolina Power and Light Co.
P. O. Box 1551
Raleigh, NC 27602
cc w/encl: (cont'd on page 3)
Carolina Power and Light Company
cc w/encl: (cont'd)
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Health 5 Natural Resources
P. O. Box 27687
Raleigh, NC 27611-7687
SUL 02
~992
Carolina Power and Light Company
bcc w/encl:
H. Christensen,
Rll
N. Le, NRR
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 1, Box 315B
New Hill, NC 27562
RII:D SS
RI 'D SS
AB and
S
alake v
otter
6/Q92
6/3%~ 6&92
RII:DRP
HChrreteneen
6P/92