ML18010A678

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/92-09 on 920601-05.Violation Noted But Not Subj to Enforcement Actions Due to Licensee Efforts in Identifying & Correcting Violation
ML18010A678
Person / Time
Site: Harris 
Issue date: 07/02/1992
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Watson R
Carolina Power & Light Co
Shared Package
ML18010A679 List:
References
NUDOCS 9207140121
Download: ML18010A678 (5)


See also: IR 05000400/1992009

Text

4

Docket No. 50-400

License No. NPF-63

I

4UL 03 H92

Carolina Power and Light Company

ATTN: Mr. R. A. Watson

Senior Vice President

Nuclear Generation

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-400/92-09

I

This refers to the inspection conducted by A. T. Boland of.this office on

June 1-5, 1992.

The inspection included a review of activities authorized for your

Shearon Harris facility. At the conclusion of the inspection, the findings were dis-

cussed with those members of your staff identified in the report.

Areas examined during the inspection are identified in the report.

Within these

areas, the inspection consisted of selective examinations of procedures and

representative

records, interviews with personnel,

and observation of activities in

progress.

Based on the results of this inspection, certain of your activities appeared to be in

violation of NRC requirements.

Because the licensee's efforts in identifying and

correcting the violation meet the criteria in Section V.G. of the Enforcement Policy

and the violation was determined to be isolated with minor safety significance, the

'ssue

regarding the adequacy of leak testing for certain sealed sources will not be

subject to enforcement

action.

In accordance with 10 CFR 2.790(a),

a copy of this letter and its enclosure will be

placed in the NRC Public Document Room.

'9207140121

920702

PDR

ADOCK 05000400

8

PDR

8

JUL 08

1992

Carolina Power and Light Company

Should you have any questions concerning this letter, please contact us.

Sincerely,

Enclosure:

NRC Inspection Report

illiam E. Cline, Chief

Radiological Protection and

Emergency Preparedness

Branch

Division of Radiation Safety

and Safeguards

cc w/encl:

G. E. Vaughn

Vice President

Harris Nuclear Project

P. O. Box 165

New Hill, NC 27562

'.

S. Hinnant

Plant General Manager

Harris Nuclear Plant

P. O. Box 165

New Hill, NC 27562

C. S. Olexik, Jr., Manager

Regulatory Compliance

Harris Nuclear Project

P. O. Box 165

New Hill, NC 27562

H. Ray Starling

Manager - Legal Department

Carolina Power and Light Co.

P. O. Box 1551

Raleigh, NC 27602

cc w/encl: (cont'd on page 3)

Carolina Power and Light Company

cc w/encl: (cont'd)

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environment,

Health 5 Natural Resources

P. O. Box 27687

Raleigh, NC 27611-7687

SUL 02

~992

Carolina Power and Light Company

bcc w/encl:

H. Christensen,

Rll

N. Le, NRR

Document Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 1, Box 315B

New Hill, NC 27562

RII:D SS

RI 'D SS

AB and

S

alake v

otter

6/Q92

6/3%~ 6&92

RII:DRP

HChrreteneen

6P/92