ML17058A991
| ML17058A991 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point, FitzPatrick |
| Issue date: | 07/02/1992 |
| From: | Taylor J NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | J Walsh HOUSE OF REP. |
| Shared Package | |
| ML17058A992 | List: |
| References | |
| CCS, NUDOCS 9207200302 | |
| Download: ML17058A991 (12) | |
Text
~Pg RE0IJ 0
r Cl
~$
O P
0+
0
+>>*<<+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 July 2, 1992
~ ~/M The Honorable James T. Walsh Member, United States House of Representatives P. 0.
Box 7306 100 South Clinton Street
- Syracuse, New York 13261 Dear Congressman Walsh:
I am responding to your June 17, 1992, letter to Hr. Dennis Rathbun, Director, Office of Congressional Affairs, in which you requested information for your constituent, Hr. Frank Adelsperger, on requirements for small businesses supplying technical services to nuclear power facilities, including the Nine Mile Point, Units 1
and 2 and the James A. FitzPatrick facilities located in New York State.
Hr. Adelsperger stated in his letter to you that there seems to be a
requirement that any small business or person seeking to supply technical services to nuclear power facilities must have U.S.
Navy nuclear experience.
The NRC does not impose any such requirement on its licensees.
Furthermore, we have 'discussed Mr. Adelsperger's concern with representatives from both the Niagara Mohawk Power Corporation (licensee for Nine Mile Point Nuclear
- Station, Units 1
and 2) and with the New York Power Authority (licensee for the James A. FitzPatrick Nuclear Power Plant).
Both of these licensees indicated that they do not require persons or organizations providing services to their facilities to have U.S.
Navy nuclear experience.
The NRC does impose certain requirements which persons or organizations may be required to comply with when supplying services to licensed nuclear power facilities.
The extent of the requirements that may be imposed would depend upon the type services provided and the location for performing the services.
Enclosure 1 is a summary of the principal NRC requirements that may apply to contractors supplying services to licensed nuclear power facilities.
These requirements pertain to four major areas:
staff qualifications, quality
"<I'II@ItI KIIILA'STIIYI,'DII'LIIIFLIrs
~9207200302, 920702 PDR ADOCK 05000220
., H
',PDR
~PV y ~vvX
0
~ v.
, )'~I,ji1
-Cf Q 44o~~-
ggQj q I g+! $ Q ~u
+p lg
a f
~
~
~
Congressman Walsh assurance, fitness-for-duty, and access authorization.
Enclosures 2-9 are copies of the requirements referenced in Enclosure 1.
The New York Power Authority, being a State
- agency, may also have additional State requirements imposed on it.
I trust this reply responds to your request.
Sincerely, Orlynal SIgned Bya games NI. Taylof James H. Taylor Executive Director for Operations
Enclosures:
1.
NRC Requirements That May Apply to Contractors Supplying Technical Services to Licensed Nuclear Power Facilities 2.
10 CFR 50.54 3.
4.
10 CFR 73.56 6.
10 CFR 73.57 7.
Technical Specification 6.3. 1 for FitzPatrick Nuclear Power Plant 8.
Technical Specification 6.3. 1 for Nine Mile Point Nuclear Station, Unit 1
9.
Technical Specification 6.3 for Nine Mile Point Nuclear Station, Unit 2 DFFIcE LA PDI 1
PM: PDI-1 Tech.
Ed.
NRR:RVIB NRR:LPEB NANE 98 "OBrinkman:
c JMain*
LNorrholm*
GZech*
DATE DATE 06/26/
OFFICE AD'ADRP r
/ 4/92 0FFIGE NRR: LHFN NANE JWermeil*
4 /M/92 NRR:RSGB PHcKee*
06 26/92 06/25/92 D PDI-1 RACa ra
$ g6/92 06/26/92 AD:RI JACal vo 4 /29/92 OCA 06/26/92 D
~
S Var
/92 NAME JGPartlow DATE urley 92 JHT or 92
/92
/
/92
- See previous concurrence p OFFICIAL RECORD COPY a/>qlR~
FILENAME: B: iLGT7861. LTR
0
~
~
II i(
~,>yk
', t't P 0
V b
9 1
N 1
'Er I
II
'h ~y j)
~
~
'0 GREEN TICKET NO.
7861 DATED:
l 4
,t DISTRIBUTION:
Docket File (50-220, 50-.333, 50-410)
(w/incoming)
NRC 8 Local PDRs (w/incoming)
EDO GT,7861 EDO Reading JTaylor
'Sniezek JBlaha'Thompson,
- PNorry, NNBB 6113 TMurley/FHii agl i'a, 12G18
- JPartlow, 12G18 WRussel 1, 12G18,,
FGillespie, 12G18 DCrutchfield, 11H21 PDI-1 Reading (w/incoming)
SVarga JCalvo RCapra OGC OPA OCA SECY CRC-92-0519 NRR Hail Room GT 7861 (w/incoming),
12G18 Varga's Secretary Calvo's Secretary DBrinkman (w/incoming)
CVogan GZech
- JWermeil, 10D24
- PHcKee, 9D24 CCowgill, RI (w/incoming)
PDI-1 GT 7861 Green Ticket File
E
Con'gressman Walsh assurance, fitness for duty, and access authorization.
The New York Power Authority, being a State
- agency, may also have additional State requirements imposed on it.
Enclosures 2-9 are copies of the requirements noted in Enclosure l.
I trust this reply responds to your request.
Sincerely, James H. Taylor Executive Director for Operations
Enclosures:
1.
NRC Requirements That Hay Apply to Contractors Supplying Technical Services to Licensed Nuclear Power Facilities 2.
10 CFR 50.54 3.
4.
10 CFR 73.56 6.
10 CFR 73.57 7.
Technical Specification 6.3. 1 for
'FitzPatrick Nuclear Power Plant 8.
Technical Specification 6.3. 1 for Nine Mile Point Nuclear Station,
. Unit 1
9.
Technical Specification 6.3 for Nine Mile Point Nuclear Station, Unit 2 H
E D
T LA:PDI-1 o
an 4 / "/92 PH:PDI-1 DBrinkman:
c Co /24/92 Tech.
Ed.
JMain*
06/25/92 NRR JAN rrholm GZec 4 /2/92 OFFIcE NRR
~ LHF JWermeil RR':PDI-1 RACa ra AD:RI JACalvo D:DRPE SAVar a DATE lo/g///'92 (0 /
92
/
/92
/
/92
/
/92 AD:ADRP D:NRR EDO OCA JGPartlow TEHurley JHTaylor DATE
/92
/92 92 92 92
- See previous concurrence OFFICIAL RECORD COPY FILENAME: B: iGT7861. LTR
l t
, I y, 'I
n C
0 I
lh0
/y/J ++*++
t t
UNITED STATES NUCLEAR REGULATORY COMMISSION EDO Principra@iggregqgneg@gnce Control FROM:
REP.
JAMES T.
WALSH DUE: 07/07/92 EDO CONTROL:
0007861 DOC DT: 06/17/92 FINAL REPLY:
TO:
OCA FOR SIGNATURE OF:
EXECUTIVE DIRECTOR GRN CRC NO: 92-0519 DATE: 06/23/92 ASSIGNED TO:
CONTACT:
DESC:
ENCL.
LETTER FROM FRANK CD ADELSPERGER RE WORKING RELATIONSHIP WITH NUCLEAR POWER FACILITIES SUCH AS NINE MILE, FITZPATRICK AND WEST VALLEY ROUTiNG:
TAYLOR SNIEZEK THOMPSON BLAHA NORRY NRR MURLEY SPECIAL INSTRUCTIONS OR REMARKS:
SEE EDO 7762)
- ATTACHED, FOR PREVIOUS CORRESPONDENCE.
REPLY TO SYRACUSE, NY OFFICE.
MARK ENVELOPE ATTtd:
t IICHE LLE St IOLEN ACT10N uE ~p >RR plRECTpR'g pFFlgB BY g/oi/0
r
t t
OFF'ICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:
ACTION OFFICE:
CRC-92-0519 EDO LOGGING DATE: Jun 22 92 AUTHOR:
AFFILIATION:
ADDRESSEE:
LETTER DATE:
SUBJECT:
ACTION:
DISTRIBUTION:
JAMES WALSH U.S.
HOUSE OF REPRESENTATIVES RATHBUN Jun 17 92 FILE CODE:
NUCLEAR POWER FACILITIES COMMERCIAL AND GOVERNMENT Direct Reply OCA TO ACK SPECIAL HANDLING NONE CONSTITUENT:
FRANK ADELSPERGER NOTES:
DATE DUE:
SIGNATURE:
AFFILIATION:
Jul 7 92 DATE SIGNED:
f'