J ! ll G ,.. .,.,,...,
VJ.-
- . * .. :
l1v!'-i
- ~'
vv-
Docket Nos.
EA No.
50-272
50-311
50-354 92-050
Mr. Steven E. Miltenberger
Vice President and Chief Nuclear Officer
Public Service Electric and Gas Company
P.O. Box 236
Hancocks Bridge, NJ 08038
Dear Mr. Miltenberger:
SUBJECT:
SALEM AND HOPE CREEK RESIDENf SAFETY INSPECTION 50-
272/92-07; 50-311/92-07; 50-354/92-06 (5/3/92 - 6/13/92)
This letter transmits the findings of an inspection to assure public health and safety, *
- conducted by Mr. Thomas P. Johnson-Senior Resident Inspector and other members of the
NRC resident and regional staff at the Salem and Hope Creek Nuclear Generating Stations for
the period between May 3 and June 13, 1992. The findings of this inspection were
previously discussed with Messrs. C. Vondra and J. Hagan of your staff.
Based on the results of this inspection, it appears that one of your Salem activities was not
conducted in full compliance with NRC requirements, as set forth in the enclosed Notice of
Violation. This issue concerns the failure to adequately assess and provide information
relative to on-site ammonium hydroxide storage and its potential effect on control room .
habitability as required by a July 10, 1981 NRC Confirmatory Order.
The letter also acknowledges receipt of your May 14, 1992, response to a Salem violation
regarding inadequate safety evaluations cited in NRC Inspection Report 50-272 and 311/90-
22. Those corrective actions appear to be acceptable. These issues associated with your
10CFR50.59 safety evaluation process (Salem/Hope Creek unresolved items) are closed in
this report.
,-'\\,.. .-.. ,',,*~
\\j Ju-~ *-* 0
9207090243 920702
ADOCK 05000272
G
JUL 0 ° 10"?
,(,
,.,::i_
Public Service Electric and Gas Company
2
Your cooperation with us is appreciated.
Enclosures:
1.
Appendix A, Notice of Violation
Sincerely,
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
2.
NRC Inspection Report Nos. 50-272/92-07; 50-311/92-07; 50-354/92-06
cc w/encl:
S. La.Bruna, Vice President - Nuclear Operations
C. Vondra, General Manager, Salem Operations
J. Hagan, General Manager, Hope Creek Operations
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
F. Thomson, Manager, Licensing and Regulation
J. Robb, Director, Joint Owner Affairs
A. Tapert, Program Administrator
L. Reiter, General Manager, QA and Nuclear Safety Review
M. Wetterhahn, Esquire
R. Fryling, Jr., Esquire
J. Isabella, Director, Generation Projects Department, Atlantic Electric
D. Wersan, Assistant Consumer Advocate, Office of Consumer Advocate
J. Lipoti, State of New Jersey
K. Abraham, PAO ( 2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
J UI r -, 10Q?
-
'lwl
.'.J
J*,)*_,I-
Public Service Electric and Gas Company
bee w/encl:
Region I Docket Room (with concurrences)
E. Wenzinger, DRP
J. White, DRP
J. Stone, NRR
S. Dembek, NRR
DRS/ED SALP Coordinator
DRSS SALP Coordinator
R. Lobel, OEDO
J. Lieberman, OE
D. Holody, enforcement Coordinator
bee w/letter and Executive Summary Only:
W. Hehl, DRP
W. Hodges, DRS
W. Lanning, DRS
R. Cooper, DRSS
J. Joyner, DRSS
C. Miller, PDI-2, NRR
6/16/92
trf92
3
~enzinger
1l