UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION Ill
799 ROOSEVELT ROAD
GLEN ELLVN, ILLINOIS 60137
Docket No. 50-237
Docket No. 50-249.
Licerise No. DPR-1~
- Licens~ No. DPR-25
Commoriwealth Edison* company*
ATTN:
Mr. Cordell Reed
Senior Vice President
Opus West III .
1400 Opus Place - Suite #300
Downers Grove;. IL
60515 *
Dear Mr. Reed:
. JUL
2 1992
This refers to-the special inspection conducted by Mr. S. G. Du Pont of this
office on April 1 through, May 28, 1992.
The inspection included a review of
activities ~uthorized for your Dresden facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed rep.ort.
Areas examined during the inspection are identified in the r.eport. Within
these areas, the inspection consisted of selective examinatio~s of procedures
and representative records, interviews with personnel, and observation of
activities tn progr~ss.
_ Based on the results of thfs inspectibn, certain of your activities appeared
to be in violation-of NRC requirements~ as specified in the enclosed Notice of
Violation~ The violation is of concern because the quality of work
instructions indicated significant-inadequacies-in the work package
. preparation and* supervision of the _process. *
-
You are required to respond to this letter and should fol~ow- the instructions
specified in the enclosed Notice when preparing your response.* In-your
response, you should document the specific actions taken and any additional-
actions you plan to*prevent recurrence .. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to_ ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures~ and your response t6 this* letter will be placed
in the NRC Public Do.cument Room.
- ' , ***
- ~ ...
"
P'!"*
If~) U :,.: ~.4 Q
9207090340 920702
ADOCK 05000237
G
l
.
Commonwealth Edison Company
. 2 .
JUL
2 1992
The responses directed by this le.tter and the accompanying. Notke are not
subject to the cle~rance procedures of the Office of*Managemen~ and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
. We will gladly discuss any questions you have concerning 'this inspettion. *
Sinc~rely,
Enclosures:
1. *. Notice of Vi o lclt ion
2.
Inspection* Report
No.
50~237/92013(DRP);
- No. 50-249/92013(DRP)
.
.
cc w/enclosures:
- D. Galle, Vice Presid~nt, BWR
Operations
T. Kovach, Nuclear Licensing
Manager
C.
Schroeder~ .Station Manager
R. Radtke, Regulatory Assurance
Supervisor
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspectors, Dresden,
LaSalle, Quad Cities
R. Hubbard
J. Mccaffrey, Chief, Public
Utilities Division*
- R. Newmann, Office of Public
Counsel, State of Illinois Center
Licensing Project Manager, NRR
State Liaison Officer
~- J. Bafrett, NRR
E. J. Leeds, NRR
H. L; Jordan, NRR
T. 0. Martin, Riii
C. D. Pederson, Riii
S. Stasek, SRI, Fermi
Brent Clayton, Chief
Reactor Projects Br~nch 1.