Forwards Special Insp Repts 50-237/92-13 & 50-249/92-13 on 920401-0528.Violations Noted
ML17177A515
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/02/1992
From: Beverly Clayton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17177A517 List:
References
NUDOCS 9207090340
Download: ML17177A515 (2)


See also: IR 05000237/1992013

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

799 ROOSEVELT ROAD

GLEN ELLVN, ILLINOIS 60137

Docket No. 50-237

Docket No. 50-249.

Licerise No. DPR-1~

Commoriwealth Edison* company*

ATTN:

Mr. Cordell Reed

Senior Vice President

Opus West III .

1400 Opus Place - Suite #300

Downers Grove;. IL

60515 *

Dear Mr. Reed:

. JUL

2 1992

This refers to-the special inspection conducted by Mr. S. G. Du Pont of this

office on April 1 through, May 28, 1992.

The inspection included a review of

activities ~uthorized for your Dresden facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed rep.ort.

Areas examined during the inspection are identified in the r.eport. Within

these areas, the inspection consisted of selective examinatio~s of procedures

and representative records, interviews with personnel, and observation of

activities tn progr~ss.

_ Based on the results of thfs inspectibn, certain of your activities appeared

to be in violation-of NRC requirements~ as specified in the enclosed Notice of

Violation~ The violation is of concern because the quality of work

instructions indicated significant-inadequacies-in the work package

. preparation and* supervision of the _process. *

-

You are required to respond to this letter and should fol~ow- the instructions

specified in the enclosed Notice when preparing your response.* In-your

response, you should document the specific actions taken and any additional-

actions you plan to*prevent recurrence .. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to_ ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures~ and your response t6 this* letter will be placed

in the NRC Public Do.cument Room.

  • ' , ***
  • ~ ...

"

P'!"*

If~) U :,.: ~.4 Q

9207090340 920702

PDR

ADOCK 05000237

G

PDR

l

.

Commonwealth Edison Company

. 2 .

JUL

2 1992

The responses directed by this le.tter and the accompanying. Notke are not

subject to the cle~rance procedures of the Office of*Managemen~ and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

. We will gladly discuss any questions you have concerning 'this inspettion. *

Sinc~rely,

Enclosures:

1. *. Notice of Vi o lclt ion

2.

Inspection* Report

No.

50~237/92013(DRP);

  • No. 50-249/92013(DRP)

.

.

cc w/enclosures:

  • D. Galle, Vice Presid~nt, BWR

Operations

T. Kovach, Nuclear Licensing

Manager

C.

Schroeder~ .Station Manager

R. Radtke, Regulatory Assurance

Supervisor

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspectors, Dresden,

LaSalle, Quad Cities

R. Hubbard

J. Mccaffrey, Chief, Public

Utilities Division*

  • R. Newmann, Office of Public

Counsel, State of Illinois Center

Licensing Project Manager, NRR

State Liaison Officer

~- J. Bafrett, NRR

E. J. Leeds, NRR

H. L; Jordan, NRR

T. 0. Martin, Riii

C. D. Pederson, Riii

S. Stasek, SRI, Fermi

Brent Clayton, Chief

Reactor Projects Br~nch 1.