Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18009A774 +
- ML20024F826 +
- ML17305B261 +
- 05000272/LER-1990-037-01, On 901117,plant Vent Radioactive Noble Gas Monitor 1R41C Channel Deenergized & Failed During Investigation of 1R45 Channel Printer Failure Alarm Due to Equipment/Design Failure +
- ML18057A655 +
- ML18057A653 +
- ML18057A638 +
- ML20065T539 +
- ML20065T309 +
- ML20065T275 +
- ML20065T192 +
- ML20065T108 +
- ML20065T102 +
- ML20065T084 +
- ML20065T079 +
- ML20065S582 +
- ML20065S404 +
- ML20065S357 +
- ML20065S351 +
- ML20066F019 +
- ML20065S225 +
- ML20065S212 +
- ML20065S170 +
- ML20065R333 +
- ML20072Q616 +
- ML20072Q536 +
- ML20072Q532 +
- TAC:77768 +
- U-601766, Proposed Tech Spec 3/4.3.4.1, ATWS Recirculation Pump Trip Sys Instrumentation +
- JSP-959-90, Application for Amend to License NPF-62,changing Tech Spec 3/4.3.4.1, ATWS Recirculation Pump Trip Sys Instrumentation +
- 1CAN129004, Advises That Design Change Package 87-1022 Re Containment Isolation Valve for Air Particulate Monitor Deferred from Refueling Outage 1R9 to Special Outage.Installation of 87-1022 Will Occur Simultaneously W/Package 89-1023 +
- RBG-34174, Forwards NRC Form 474, Simulation Facility Certification, Per 10CFR55.45(b)(5)(i) +
- BECO-90-158, Responds to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests on Motor-Operated Valves. Subj Valves in Hpci,Rcic & RWCU Sys Capable of Providing Containment Isolation in Event of Line Break +
- ML23153A082 +
- PY-CEI-NRR-1279, Forwards Fourteenth Quarterly Rept,Cleveland Electric Illuminating Seismic Monitoring Network,Jan-June 1990. One Microearthquake Detected in Epicentral Area of 860131 Leroy Earthquake +
- ML23156A055 +
- 05000281/LER-1990-005-03, :on 901120,rod Control Cluster Assembly M-12 Declared Inoperable Due to Mismatch Between Group & Rod Position Indication.Caused by Control Rod Positioned Two Steps from Bottom of Core +
- 05000277/LER-1990-037, :on 901119,discovered That TS Violation Occurred as Result of Not Taking Appropriate LCO Actions When IRM Channels for RPS a Trip Circuit Fell Below Required Amount.Caused by Procedural Weakness +
- 05000277/LER-1990-036, :on 901115,excessive Reactor Coolant Cooldown Occurred While Placing Shutdown Cooling Mode of RHR in Svc. Caused by Incorrect Procedural Guidance.Appropriate Operating Procedures Will Be Revised +
- 05000328/LER-1990-016-01, :on 901117,determined That Unit 2 Operated in Noncompliance W/Tech Spec 2.2.1 & LCO 3.3.1 Because of Nonconservative Calibr of Nis Intermediate Range Channels. Caused by Procedural Inadequacies +
- 05000277/LER-1990-035, :on 901115,discovered That Multiple Safety Sys Could Be Inoperable as Result of 4 Kv Emergency Bus Undervoltage Relays Outside Acceptable Calibr Limits.Caused by Inadequate Design.Relays Modified +
- 05000333/LER-1990-035, :on 901115,three 3-inch Swing Check Valves Failed to Close During Testing Due to Corrosion & Silt Accumulation in Hinge Pin Mechanism.Valve Internals Replaced W/Stainless Steel Components +
- 05000369/LER-1990-032, :on 901117,unit Experienced Turbine Trip, Followed by Reactor Trip.Cause Unknown.Control Room Personnel Initiated Turbine Exhaust Hood Spray +
- 05000382/LER-1990-017-01, :on 901116,missed Diesel Fuel Oil Sample Due to Not Following Required Procedure.Addl Sample Drawn to Support Investigation of New Diesel Fuel Oil Analysis.W/ +
- 05000395/LER-1990-010, :on 901117,insp Revealed That Output Voltage Low & Slowly Degrading,Causing Trip of Breaker Supplying Protection Set I.Caused by Failure of Ferroresonant Transformer.Transformer Repaired +
- ML20065T039 +
- ML20028H588 +
- IR 05000255/1990037 +
- IR 05000155/1990022 +
- IR 05000301/1990023 +