ML20065S404
| ML20065S404 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 12/17/1990 |
| From: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NLS900575, NUDOCS 9012210042 | |
| Download: ML20065S404 (2) | |
Text
.
w m o,,,tt g
"' Yi p Q (iOx app COL VMDu$, Nt [iH A!AA (.6002 04pp k,...., S Q:
i Nebraska Public Power District
'"'40MIM#f*'
list N:
mus wuz m ~ -= m aa.nunaaa m awasmau=ww w~ = auw=
-n x wme NLS9000575 December 17, 1990 U.S. Nuclear Regulatory Commission Attention:
Document Control Desh Washington, DC 20555 Centlemen:
Subject:
Evaluatien of the Qualification of Okonite T95/35 Tape Splicos for Use in Instrumentation Circuits Cooper Nuclear Station NRC Docket No. 50 298/DPR 46
Reference:
Letter f rom G.
A.
Trevors to NRC dated September 12, 1990, same subj ec t In accordance with recent discussions with the NRC staf f, attached is an accident profile for use in evaluating the Nebraska public Power District's (District's) recent submittal (Referenc e).
As discussed, the attached represents the worst case accident profile for areas with Okonite tape splices used in instrumentation applications. As discussed further, the conditions at the end of this profile (at 500 seconds) are assumed to continue for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, after which the environment is assumed to return to normal ambient conditions.
Please call if there are any questions.
Sincerely, Senior Staff Advisor Nuclear Power Croup
/jw Attachment cc:
NRC Region IV Arlington, TX NRC Resident Inspector Cooper Nuclear Station fI) k)
- p % e 9o1217nos*gW y.or e
fgdm,d d,g-gnw,,,n-mm en,,em,nn,M,d,1 M n,m!@.,h, tin;m7r d,i 3 e m-rd u.u!.mi m ;eida.a MumA Aaeuinhuahunsuc
e Attachm3nt to {
NLS9000575 6
EQUIPMENT QUALITICATION DATA FACl*JGE I
-300 T =
$3*r 230 25 -
22.I psis
-:co 20 - H T ('r)
(Psia) 7,j r
-150 P
- Attnesoberie 15 - t.
_;oo 10.-
//
/ /
0 50 100 130 200 250 500 Time (Seconca)
PROFI!.E E - 10" EPCI LINE IN THE SOUTH RHR OUAD TFANSIENT IN THE SCl*Tli RHR OUAD, ELEVATION 859'9" i
D N,o PACTACE NDtBER:
- 1. 6 PACE 17 0F
- S I
l t