Text
GPU Nuclear Corporation NhlEhhf t "; - p1 One Upper Pond Road u o wi Pars ppany, New Jersey 07054 201 310 7000
'ELEX 136-482 Wrner's Drect Dial Number:
December 17, 1990 C000-90-1120 C320-90-283 U.S. Nuclear Regulatory Conaission Attention: Document Control Desk Washington, D.C.
20555 Centlement subjects oyster Creek Nuclear Generating Station (OCNGS)
Docket No. 50-219 Integrated Schedule Project List Semi-Annual Update Pursuant to condition 2.C(10) of Provisional Operating Licence DPR-16, CPU Nuclear has implemented the Long Range Planning Program for OctMS.
As required by Section v.A of the Plan, the following attachmente are submitted to provide the ceml-annual project list update:
1.
Attachment A contains a now project list of Category A, B and C projects, annotated by an asterisk (*) to identify new projects.
Completed projects have been removed from the schedule listing.
2.
Attachment B contains a summary of category A and B projects which have been completed, deleted, deferred, changed in ecope, or otherwise have had schedule changes with explanations, as appropriate. Also contained are Category D and C budget activity numbaring chan0es.
One (1) new Category A project and eight (8) Category B projects have been added to the project lint in Attachment A.
Five (5) Category B ochedule changes and two (2) Category B scope changes are discussed in Attachment B.
Pursuant to thw LRPP for Oyster Creek, it will be assumed that you are in agreement with the above category B changes if you do not respond to this submittal within 15 days of receipt.
\\
I 9012270099 903237
{()\\ \\
PDR ADOCK 05000219 F,
PDR C320283 GPU Nuclear Corporation is a subs'd<a y of Genera! Public Utihties Corporation
, 0
,l O J
Integrated Schedule Page 2 Very truly yours, V
R. L. Long" Vice Presiden,and Director
~?
RLL/CMG/ pip Corporate Servicee 6
cc: J. Stolz, Director, Project Directorate I-4 Region I, Administrator NRC Project Manager Senior NRC Resident Inspector, OGNGS C320283
l i
9 i
).
I 1
i 4
5
- i -
l j
1 F
[
ATTACl! MENT A
?-
(-
PROJECT LISTING INTEGRATED Sci!EDULE e
SEMIANNUAL UPDATE 4
-(DECEMBER 1990) l t
l 1
I i
I i
I i
C120649-i
.r...
,.:cr-~,,,,,-,~,nn.,.
..-sn,.
.___,__.,n,,._.
..wa-,,a~.r,
,,,-wa,,,,,,,,,an,-en.~,,,,
,.., - -,m.--i,,-.
.. - - -,,,, -,+
J P
OY STER C R E.E K- ~ PROJECT LIST ING.
'l
~
LEGEND NRC-INTEGRATED. SCHEDULE NEW PROJECTS.'
i '-
.BA NUMBER CHANGE:
i CATEGORY
- A*
PROJECTS
?-
SORT BY CATEGORY / CYCLE /BA STATUS AS OF 300EC99 OSS BA DESCRIPTION.
. CYCLE /
CLASSIFICATION 4
NUMBER YEARS
_ _ _ _ = _ _ _ _.
1 -
I4R NRR CR j
MODIFY ALTERNATE ROD INSERTION.
l' SYSTEM'.-
10CFR50.62. NRC LETTER TO GWROG DATED 9-20 2 402965 STATION BLACKOUT MODIFICATIONS 14R NRR j
. VARD TB
'4160 -
4
. INSTALL A. POWER SUPPLY TIE BETWEEN THE i --
COueuSTION TURBINES AND THE OCNGS.TO j.
MEET 10 CFR 50.63 i
1-l i
1
)
i J
?,
e k'
4
)'.
i
,,. ~.
_ ~. _
= ~.
o OYSTER CREEK PROJECT LISTING t-j-.
+
LEGENO NRC INTEGRATED SCHEDULE NEW PROJECTS.
i l
.. BA NUWSER CHANGE 3
CATEGORY *B*
PROJECTS l-
' SORT SY CATEGORY / CYCLE /BA STATUS AS OF 100EC90
-OSS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS J
i-3 315302 SEP TOPIC I r+ ;
12-NRR EVALUATE DESIGN OF SPECICIC C. N NTS I
l ANO. INCORPORATE RESULTS IN 6 UPDATE 1
TO THE FSAR. LAI 82251.06 y
l 4 402859 ESW FLOW IHOICATION ( CO*4 TROL WOOM-)
12U NRR a
. CR INSTALL POWER SUPPLIES, SI**<AL CONOI
'TIONERS. ANO IMOICATORS IN C.
R. PANEL-I IF/2F. REG GUIDE 1.97 REQ *TS.
(
S 323613 CONT ISO VLV INST AIR SYSTEW INSP 13R NRR j
RB S1ROKE TEST 36 VALVE ACCUWULATORS AND STROKE TEST OF 40 AIR OPERATED VALVES.
l NRC G.L.' 88-14 GPU LETTER 2-21-89 l'
6' 323635 OC RX BLDG DELTA PRESS. INOICATION SYS.
139 NRR 1-CR 119 YARD-3-
REPLACE CONTROL RW DP INDICATOEr3 11RIO 5 j
11, AND PRESS IND. GO-1. INSTALL MEW d
ALARW IN CR. GPU LETTER TO NRC 7-8-89.
7 328100 CRO NOZZLE EXTERNAL UT INSP.
13R NRR OW UT INSPECTION OF THE CRO RETURN NOZZLE POSTPONED. FROW 12R OUTAGE.NUREG 0619.
REWOYE INSULATION PREP SURFACES.
O 328204 RCS AUG _ ISSCC INSPECTION 13R NRR DW-RB7S RB95 INSPECT PIPING WELDS. REMOVE ASSESTOS' LAGGING WAT*L IN RWCU VALVE NEST AREA.
9 328279 CORE SPRAY BOOSTER PUWP LOGIC REVISION 13R NRR i
480 CSR t
UNDER THIS BA. ADDRESS THE ADS TECH SPEC j
ISSUE.
L l
10 328298 RX WANUAL CONTROL SYS MOD 13R NRR f
l CR i
i WIRING CHANGES TO THE RX WANUAL CONTROL j
SYS TO PRECLUOE WULTI ROO WITHORAWAL.
NRC' LETTER DATED 10_2-90 i
~
1
l7y ;>Iy Fe[ f
((!
((p)ttfltL [riIf[y!{
i4h(t[l[rj'[
f, 42 s.
p 09 C
4 4
E 0
0 1
y u
F W
O S
A n
S U
N T
O s.-
e A
I T
T S
A a
C m
R R
R W
R R
R R
m b
=
R R
R S
R R
R R
I N
N N
I N
N N
N SS m
A A_
L C
s.
G N
I_
E T
L S
h U
I D
v.
L
/
'E ES s
LR R
9 R
R R
R R
R a
N CA 3
3 3
S 3
3 3
3 T
TE 1
1 1
I 1
1 1
]
C CY C
~
S E
S g
T c
J C
D E
O J
E O
Q R
T P
P_
\\
~
A S
R E
s G
Y
-L.
TRO E.
O ENC 8
HN R S EEI K
2 TA'
- A8 N
PRN N
E G
ZAT T
E Y P. I 4
E S O A
R T
L W 4
E P P T T
)
NEW T
N A
ANS DGS P A0 N S 1
IN C_
C NO S.T INE A R5 E
Y 0
AWL ESC L
SIV WR.
M SC-DWN TN)
I
.O HNE E
TPL F)
UIA S ECW C US8 TEL ENO R_
O ORT TE.
S' OPV V R0E A CG.
NT-T' VTI WI EEN N LIT.
C I
AN IC2 E
L S L I 1. M P R L NDO E AWC O
WN2 V
GTN V E
T
- S P. C F
U E SO8 NNO Rc E S
G M
VWE.
R A
L UOL E OT T
L RT D
.C0 S
IEI l
Cb R ES N-O ONY A G
R O PVT D E N HEG O ATL C KCO S
S TOT R SEE O I A N LOO G TLt R
A A C R I
T DNT L ECP a
Y N D P ENU N
TO C A I NA N
E IWO RAN I
G DUS CSO P IES.
O 0
O N
OW U PN.
N NOI O ES I E CNE S
C DI R L
I I
SR.
T E
2 I5OR.
S SGI P G S NK.
DTI T
L YFL N 1TB a
P9CET I N(
NH N OLN K DES P
A E EB3N.
IB RN RSA N IT6 O IAA N AES I
E LEN WT II E
PRO /O OCTH O PI1 I TWC A NI R
L' ELA U XA - 2 L SYC T ICS I IW3 S C.S T
W..
C
. P3RBP - T2R/I
- S.
E7 I0
.7OGW A
SG R PEU L R3OWI 2 U
R5IF-5U T T P
- C ER A O t.
S M2 A BT -
E ABWC2 SBPLV E P S5LC1 8NN' RBENN R SLR I
S D
SRO O NRPA L A2 N#LO S. 9 O I Q TRHO O NWE O S
,T PN I ANC U C2 E AW6 P CRE E TIT C IAH IEW
. 2' FUS 1
OI S 8
O 1
IR N TN RT L HN" A
O PU G5EIP P 9'L0 N ELE E5LW E EAA L EC, EGTI9 B
RE R SBCTO A1L OWCLC D5L.R PWCRT L N H UD-LE E
/
SCRLO ERAAT C1AG CDAEA ARAD.
DATS E IGD.FER' R m
G E
U IET / LR TE LWL R T*
U LEI W TNI EL N
L R WN S PEP V SR O PYP G SQP'C PNS Y UIT. G DLP
. A C
O" EAO P EPE P NU S'
ERE P NEP W EEE' R OSP D NIE S H Y
T RPT R ROS R IN I' RDR U IRA R RPR D RUO E UFS T C C
C
/
E R Y
J E R
O B O
R W G
P U E
N T
W A
R 2
9 8
0 7
8 0
5
+
D'E A
C E
7 7
8 0
2 3
5 1
N-N B AB 8
8 8
9 9
9 9
8 E-Y BW 2
2 2
2 2
2 2
8 G-S U
0 0
0 0
0 0
0 0
E' N
4 4
4 4
4 4
4 4
L-'
TRO 9'
1 2
3 4
5 6
7 8
S 8
1 1
1 1
1 1
1 1
0 w
4 i'
I t'
ji l
4 4j ;
- I I
- 2'
- ]
}2 ]
i
.i!i t'
ii.l)i:!li4
7--
.-. = ~ -....- - -
OYSTER CREEE PROJECT LISTING LEGEND NRC INTEGEATED-SCNEDULE NEM PP M CTS.
~
B* N R CHANGE CATEGORY
- B*
PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS Or 10DEC90
.____c OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS d
19 408820 REPLACEMENT OF-ROSEMOUNT-1153 TRANSMTTRS 13R NRR RB REPLACE APPROX 32 TRANSMITTERS MEET NRC BULLETIN 90-01 15 OF THE 32 UNITS MILL SE DONE CYCLE 12 20 408116 ACCESS CONTROL UPGRADE-CTL RM/ RB 14 NRR
' CR CSR I
PROCUREMENT & INSTALLATION OF KEY CARD READER UNITS M/ ALARM FOR CONTROL ROOM AND CABLE SPREAD ROOM S BX BUILDG l
21 328280 RCS STRESS IMPROVEMENT 14R NRR DM RB23 i
PERFORM STRESS IMPROVEMENT ON SELECTED STAINLESS STEEL PIPING MELDS IN RCS SYS.
IAR NRR 22 328284 CLOSURE HEAD MELDS REPAIR / REPLACEMENT RB 119 119 APPLY CRC TO'3 NOZZLE TO FLANGE MELDS ON
'RX. VESSEL NEAD. REPAIR / REPLACE CLOSURE HEAD VENT / COOLING PIPE MELDS..G.L. 88-01 23 328307 RCS AUG - IGSCC INSPECTION - 14R 14R NRR DM RB75 RB95 i
INSPECT PIPING MELDS PER
]
NUREG 0313 REV 2.
i l
24 402AFA O.C HARDENED VENT 14R NRR RB TR It* STALL 8" PIPING VENT SYSTEM FROM CONTAINMENT TO THE MAIN STACK FAN DISCHARGE DUCTS. NRC GL 89-16 1
25 402AGA OC RX OVERFILL PROTECTION SYSTEM 14R NRR CR MODIFICATIONS TO FM REGULATING VALVES AND FM PUNP B TRIP CIRCUITRY.
NRC GEN. LETTER 89-19 i
26 402808 CONVERT COMPUTER RM TO GSSI/EMER DIR OFF 14R NRR CPR
.JONVERT COMPUTER ROOM INTO GSS OFFICE.
REQUIRES SECURITY PROOFING
- 2.... _ _
I
... =,.. _
O D Y S T.E R' CREEK
..P R O J E'C T LISTINC
]
.. + -
-LEGENO L
~*
NRC INTEGRATED SCNEDULE NEW FROJECTS.
=--
= - -
i
- BA NUMBER CNANGET CATEGORY
- B' PROJECTS STATUS AS OF 100EC90
_' SORT.BY CATEGORY / CYCLE /BA._ _ _.
OBS BA'
- DESCRIPTION ~
CYCLE /
CLASSIFICATION NR YEARS.
l 27 402894 0.C.. DELETION OF CONTAINMENT SPRAY. AUTO, 14R NRR t -
'480V CR I
REPLACE C.S.
MODE SWITCN W/TWO KEY-4
~ LOCKED SWITCNES, LOCAL WIRING CHANGES.
- PREVENT SYSTEN AUTD-START..
28 402900 ISO CONDENSER PIPING MOOS 14R NRR RB~
PERFORM STRESS IMPROVEMENT (MECNANICAL-STRESS IMPROVEMENT' PROCESS) OF THE ISO CONDENSER NEW NG PIPING INSTALLEO IN ISR f
29 402910 C R RECORDERS 14R NRR CR REMOVE & REPLACE' APPROX. 15 DEFICIENT /
OBSOLETE RECORDERS --REDUCE I
OPERATOR. ERROR. NtNPEG 0737 SUPP 1 l-30 402936
.CPW/DW ISO VALVE MOD TO PRECLUDE AUTO RE 14R NRR CR.
INSTALLATION OF POSITION SWITCNES'AND i
WIRING CHANGES FOR VALVES'V-38-9,10,16 E
- 17. NUREG-0737 ITEM II.E.4.2 l.
31 402946 CONTAIMMENT ISOLATION VALVE REPLACEMENT 14R NRR e
RS
'OW i
REPLACE 4 VALVES TO FACILITATE 10CFR 50 i
APP J TYPE C TEST. GPUN LETTER TO NRC -
DATED SEPT 8,'1989.
32 328ADA FW/CRO NOZZLE INSPECTION - I SR..
15R NRR i-DW NOE 4 FW s CRO RETURN NOZZLES.(EXTERNAL'-
l UT INSPECTION). NUREG 0619 REO' TS. -
L 6
l-33 328AFR RCS AUG - IGSCC INSPECTION-ISR-ISR NRR I
DW RB75 9595' l
INSPECT PIPING WELDS (69)
I G L. ~ 88-01 AND NUREG 0313 Rt.V.2.
34 328030 CNTL RW NUMAN FACTORS DESGN REVIEW 15R NRR CR REPAINT.RETURBISN S RilABEL CR PANELS '
i 1R THRU IOR,6XR,11XR.12R,12XR.14R.14XR,'
16R AND 11F,9XR$11R.MUREG 0737 SUP 1.
L-
4
~
O Y S T E R-C D E' E tl:
-P'O O J E C T.
.LISTINC i
..=-
4
^
LEGEND NEW PROJECTS.
' INTEGGATED. S C N E D U L E.
HRC
=
BA MUMBER CHANGE CATEGORY
'8*
PROJECTS i
SORT BY CATEGORY / CYCLE /BA-STATUS AS Or IODEC90
[
l
~COS BA.
DESCRIPTION CYCLE /
CLASSIFICATION YEARS ____
NUMBER i.
?
35 402AGO REG GUIDE 1.97 RECORDERS 15R NOR s
CR l
REPLACE / INSTALL RX WATER LEVEL FUEL IONE RECORDERS TO WEET REG. GUIDE 1.97 REO*TS i
36 402AGP REG GUIDE 1.97 POWER SUPPLY ISR NOR CR R8 i
PROVIDE NEW 120V POSER SUPPLY FEED TO 4
REG GUIDE 1.97 INSTRUMENTATION.
LOSS OF OFF-SITE POWER CONCERNS.
a 37 402959 O. C. PROBABILISTIC RISK ASSESSWENT-IPE 87-92 NRR UPDATE EXISTING OC PRA. PERFORN AN INDIVIDUAL PLANT EVALUATION. IRC G. L.
l 83-20. COMPLETE BY 9-1-92.
38 32820S SQuG SUPPORT'* PARTICIPATION - SWROG-87-93 NRR j
i PARTICIPATION IN SEISMIC OUALIFICATION UTILITY GROUP - FOR EQUIP SEISWIC QUA-1-
-LIFICATION. UNRESOLVED SAFETY ISSUE.
1-l 39 328226 SQUG PROGRAW IMPLEMENTATION.
87-93 NRR ESTABLISH SEISWIC QUALIFICATION FOR OYSTER CREEK. SCOPE INCLUDES WALKDOWNS j
IN OUTAGE 14R AND EVALUATIONS.
40 328304 NUWARC COMN*L GRDE DEDICATION
- PROCUR 90-91 NRR
~
DEVELOP A COWWERCIAL GRADE DEDICATION.
PROGRAN IN RESPONSE TO NRC G L 89-02 i
41 328312 WOV PROGRAW 90-92 NRR
?
DESIGN BASIS REVIEW, STRESS ANALYSIS i
AND TESTING OF APPROX 60 WOV*S NRC G L 89 '
_.,....--g4
-m
f
~
y.
OYSTER C D E E'K. 'P R O J E C.T LISTING l
+
LEGENO NRC INTEGRATED SCHEDULE i
==-
NEW PROJECTS.
'BA NUMBER CHANGE 1
CATEGORY
'C' DROJECTS SORT SY CATEGORY / CYCLE /BA STATUS AS OF 10DEC9G OSS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 42 323457' CHECK VALVE MONITOR / INSPECT PROGRAW 12 000 r
TB DW ' RB IMPLEMENT IN-SERVICE MONITORING AND 1
INSPECTION OF CHECK VALVES INPO-SOER 86-03 7
43 402823 GROUNDING & LIGHTNING PROTECTION 12 ISM YARD MS INSTALL GROUNDING FOR THE FENCE UNDER f
230KV LINES AND MET TOWER.
i 44 408799 PLANT PAINTING PDOGRAM 12 gwc
[
ALL i
PREPARE SURFACES AND PAINT IDENTIFIED
('
EQUIPMENT, PIPING. MALLS, FLOORS AND CEILINGS.
[
t 45 323594 LIFE OF SYSTEM MAINT PLAN' 12-14 MRC ALL PERFORM REVIEMS OF O.C. PLANT SYSTEMS, IMPLEMENT MOOS / REPAIRS RESULTING FROM SYSTEM REVIEWS.
46 323457 CHECK VALVE MONITOR /INSP PROGRAM 120 ORR TB DW RB OPEN AND INSPECT CHECK VALVES THAT EXHIBIT OPERATIONAL PROBLEMS.
INPO-SOER 86-03 47 323AGG
' SPENT FUEL POOL CLEANUP 13 MRC 119 REMOVE AND DISPOSE OF IRRADIATED HARDWARE AND SILT.
48 402823 GROUNDING E LIGHTNING PROTECTION 13 ISM YARD RB TB RB INSTALL LIGHTNG PROT FOR RB $ TB.
GROUNDING FOR NORTH GUARO HOUSE, MAIN GUARD HOUSE, LARGE STORAGE TANKS.
49 402898 REPL UPPER TB S OLD MACHINE SHOP ROOF 13 MRC YARO REPLACE THE UPPER TURBINE BUILDING ROOF, AND THE OLD MACHINE SHOP ROOF.
L OYSTER CREEK POOJECT LISTINC
--- =____ __
LEGEND NRC
' INTEGRATED SCHEDULE NEW PROJECTS.
= - - - - -
'BA NUMBER CHANGE
- CATEGORY
- C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 10DEC90 i
CBS sh
[ESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
---=---
- - = _
'F SO 408AER SPENT FUEL POOL CLEANUP 13 WRC 119 i
REMOVE AND DISPOSE OF IRQADIATED HARDWARE IN THE SFP. IE CRB'S.LPRM*S FUEL CHANNELS ETC.
51 322024 DRYWELL SCAFFOLDING S INSULATION 13R GWC DW i-INSTALL SCAFFOLD IN DW TO SUPPORT ALL i
OSM WORK.RENV E REINSTALL DW INSULATION REMV SCAFFOLD. REM /REPL DW AIRLOCK 52 323457 CHECK VALVE MONITOR /INSP. PROGRAM 132 ORR TB DW RB OPEN AND INSPECT CHECK VALVES THAT i
EXHIBIT OPERATIONAL PROBLEMS.
INPO-SOER 86-03 53 '323476
' DIESEL MAINTENANCE IMPROVEMENTS ISR ISM DGB
?
REDAIR/ REPLACE CORRODED STEEL.
LEAKING FUEL DIL LINE. ADD TERM. PTS.
REPLACE DG-2 POWER PACKS,RPR CONCRETE i
54 323577 RECIRC VALVE MAINTENANCE-13R MRC DW REPLACE PACKING ON 5 SUCTION.
t 5 DISCHARGE AND 4 BYPASS VALVES.
55 323580 LP TURBINE INSPECTION ("B"
)
13R MRC TB COMPLETE INTERNAL INSPECTION OF THE "B"
LOW PRESS TURBINE. REMOVE ROTOR.
SANOBLAST.UT INSP E REINSTALL ROTOR.
56 323592 CONTAINMENT ISO VLV MAINT 13R NRR RB INSPECT s REPAIR AS NECESSARY CONT AINt(T ISOLATION VALVES IDENTIFIED BY LLRT'S.
(APPROX.'15 VALVES) 57 323593 CRD HCU MODULE REBUILD ISR MRC RB INSP/ REBUILD (35)CRD MODULES. REPLACE (35) V-101EV-102 VLVS.IPSP. DIAPHRAMS ON (35)V-126 & (35)V-127 VALVES.
O O
O OYSTER CREEK.
PQOJECT L,I S T I N O
~
' LEGEND HRC I N T E G'~R A T E D SCHEDULE NEW PROJECT 3.
-__ =--
BA NUMBER CHANGE CATEGORY
- C* PROJECTS-SORT BY CATEGORY / CYCLE /BA STATUS AS OF 100EC90 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 58 323605 YALVE MAINT. AND OVERHAUL ISR MRC DW RB TB REPACK ANO REPAIR OF SELECTED VALVES WHICH HAVE DEFICIENCIES NOTED ON WORK REQUESTS.
59 323612 ASBESTOS ABATEMENT PROGRAM 13R' 13R.
ORR CB RB REMOVAL / REPLACEMENT OF ASBESTOS LAGGING MATERIAL IN THE CONDENSER BAY.
60 326201 OUTAGE ISI-13R 13R NRR Dw RB TB INSPECT-HANGERS, PIPING WELDS &
COMPONENTS TO SATISFY SECTION XI REQUIREMENTS. 10 YR SYSTEM HYDRO.
61 328203 RX INTERNAL INSPECTION ISR NOR 119' VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS & SURFACES AS REO*D BY ASME CODES.
62 328230 RCS PIPING REPAIR CONTINGENCY 13R MRC DW RB CONUNGENCY FOR IGSCC FINDINGS.
63 328265 CHEM CLEAN FLUID SYSTEM 13R RAD RB23 DW RB51 PERFORM CHEMICAL DECON OF THE RECIRC AND CLEANUP SYSTEMS TO REDUCE RAD-IATION LEVELS.
64 402888 OTHER OUTAGE RELATED ACTIVITIES 13R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS. REPAIRS, SURVEILLANCES, MINOR MODIFICATIONS, MOD SUPPORT, ETC-65 402860 LP TURBINE BLADE REPLACEMENT-LP B 13R ISM TE REPLACEMENT OF LP 15TH STAGE BLADES ON "B-LOW PRESSURE TURBINE.
NJ
%J
~
OY STEQ CDEEK PD0 JECT LISTING
=--
LEGEND
~~~~~~
NRC INTEGRATED SCHEDULE NEW PROJECTE.
- - - = -
BA NUMBER CHANGE CATEGORY
- C*
PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS Or 10DEC90
.- =-___
=-
---+----
CBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
=--
=---------
66 402869 CABLE / CONDUIT REPAIR-CIRC WATER PUMP PIT 134 REL INT REPLACE ELECTRICAL CONDUITS, CABLE AND CONDUIT SWPORTS AT THE INTAKE STRUCTURE i
67 402901 FEEDWATER SYSTEM IMDROVEMENTS 13R REL TB RB INSTALL (2) MAIN BLOCK VALVES AND REPLACE PNEUwATIC LOCK-UP RELAYS.
PRE-OUTAGE WORA: INSTALL CONDUITS.
68 40291S REDUCE NUMBER US SAFETY VALVES 13R RAD DW PERMANENT REMOVAL OF (7) MSSV*S BASED GN STU3Y PERFORwHED. INSTALL BLIND FLANGES.
RELOCATE ACC. MONITORS & IMPROVE ELECTRONIC 69 402939 DRYWELL EXPOSURE REDUCTION WODJ.
13R RAD DW INSTALL S58IELDING ON VARIDUS COwpONENTS IN THE DRYWELL 70 e'02939 DRYWELL EXPOSURE REDUCTION WODS.
INSTALL NEW DW CHILLER SUPPLY LINE AND INSTALL A CHILLEN BY-Ph*S TO ALLOW P.M.
71 402939 DRYWELL EXPOSURE REDUCTION NODS.
ISR RAD DW RB INSTALL ELECTRICAL AND LIGHTING SERVICES IN THE DRYWELL.
72 402939 DW EXPOSURE REDUCTION WCDS.
13R RAD DW REPLACE 3 DW WECHANICAL SNL9BERS WITH STRUTS 73 40294S NEW FW FLOW ELEMENT 13R ISH TB INSTALL A NEW FW VENTURI ACCURACY CONCERNS. CORE THERNAL POWER j
LEVEL.
s i
OYSTER CDEEK PD0 JECT LISTINC i
LEGEND I
NRC INTEGRATED SCHEDULE NEW PROJECTS.
= _ -
=
i BA NUMBER CHANGE CATEGORY
- C' PROJECTS l
SORT BY CATEGORY / CYCLE /BA STATUS AS 05' 100EC90 I
-OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS -
74 402952 CHEMICAL DECON SUPPORT SYSTEMS _13R 13R RAD DW DESIGN, PROCURE AND INSTALL SUPPORT SYSTEMS REQ'D TO IMPLEMENT CHEM DECON OF THE RECIRC LOOPS, ANNULUS, & RWCU SYS 75 322024 DRtWELL SCAFFOLDING E' INSULT. TION 144 GWC
(
DW~
. INSTALL SCAFFOLD IN DW TO SUPPORT ALL ACTIVITIES. REMY & REINSTALL DW INSULA _
6 TION. REMV SCAFFOLD.
j 76 323ACJ HP TURBINE INSPECTION _14R 14R MRC i
TB COMPLETE INTERNAL INSPECT OF THE HP TURBINE. REMV ROTOR FROM CASING, SANDBLAST UT INSP & REINSTALL ROTOR.
i i
77 323ACV CONT ISOLATION VALVE MAINT-14R 14R NRR i
{
REFURBISN CONT ISO VALVES IDENTIFIED BY LLRT*S. APPROX 15 VALVES l
78 323ADC ASBESTOS ABATEMENT-14R 14R CRR l
REMOVAL / REPLACEMENT CF ASBESTOS LAGGING i
4 MATERIALS. OSHA CFR 1910.1001
{
79 323AGB CHECK VALVE MONITORING /INSP. PROGRAM 14R REL l
RB TB OPEN AND INSPECT CHECK VALVES THAT i
EXHIBIT OPERATIONAL PROBLEMS.
1 INPO_SOER 86_03 80 32 3 AGF..
REFUEL FLOOR-RX DISASSEMBLY / REASSEMBLY 14R MRC 119 i
i TASKS ASSOCIATED WITH RX DISASSEMBLY AND REASSEMBLY, AND SUPPORTING ACTIVITIES 81 323LPA LP TURBINE INSPECTION iA) 14R MRC
[
TB COMPLETE. INTERNAL INSPECTION OF THE "A"
LP TURBINE..
~
1 s
h
~
O.Y.S T E R lC Q E E 3:-
PQOJECT LISTIN0-j i
LEGEND-l; -
. NEW PROJECTS.
.N R C I N_T E G R A T E D SCHEDULE i
l' BA NUa8BER CHANGE 1:
f CATEGORY
- C' PROJECTS SORT BY-CATEGORY / CYCLE /BA STATUS AS OF 10DEC90 s
.......................... _....... _ _ - - - - - - - = _
CBS BA OESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS i
j 82 323624 VALVE MAINTENANCE 5 OVERHAUL 14R MRC TB DW RB
)
CORRECTIVE & PREDICTIVE MAINTENANCE i
OF SELECTED VALVES.
83 323629 CRD HCU MODULE REBUILB-14R 14R asRC RB23 i
REBUILD 35'CRD HYDRAULIC CCNTROL UNITS 1
84 32691E OUTAGE ISI-14R 14R NRR l
D*?
RB TB i-INSPECT HANGERS,' PIPING WELDS S COMPONENTS TO SATISFY SECTION l
XI REQUIREMENTS.
85 328308 RCS PIPING REPAIR CONTINGENCY I4R MRC
'l 4
i DW CONTINGENCY FOR IGSCC FINDINGS.
j ASSUISES ONE 6*. OVERLAY IN RWCU AND i
INSP OF 9 ADD *L WELDS.
t l
86 328310 RX INTERNAL INSPECTION 14R NRR l
119' DW 4
VISUAL' INSPECTION OF SELECTED INTERNAL l
COMPONENTS AND SURFACES AS REQUIRED BY ASME COOES.
i l
87 402ADI RECIRC PUMP SPEED CONTROL 14R afRC MGSR REPLACE EXISTING MG SETS WITH STATIC j:
VARIABLE FREOtENCY DRIVES (SCRS) 88 402AEV
- RECIRC FLOW SCRAM ELECTRONICS REPLACEM'T 14R 099 e
RS CR REPLACE EXISTING ELECTRONICS WITH DIGITAL ELECTRONIC EQUIPteENT.
89 402AFJ TBCCW HX REPLACEMENT 14R REL i
TB REPLACEMENT OF ONE TBCCW HX
g
( ~x
/
\\
0Y STER CREEK PROJECT LISTING
- ----=----- - - ------------------
LEGEND NAC INTEGRATED SCHEDULE
= - -
NEW PROJECTS.
BA NUMBER CHANGE CATEGORY
- C' PROJECTS STATUS AS OF 10DEC90
_ _ - - _ - = - - - - - - -
SORT BY CATEGORY / CYCLE /BA CYCLE /
CLASSITICATION OBS BA DESCRIPTION YEARS NUMBER
- - - - = - = - - - - - - - = _
---=
ALL I4R SO 402CCC OTHER OUTAGE RELATED ACTIVITIES ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTION % REPAIRS. TURVEILLANCES.
MINOR MODIFICATIOND. MOD SUPPORT. ETC.
91 402736 DUAL VALVE INDICATION REu0 VAL-PN 1 14R ISM CR RB REPLACE DOUBLE VALVE INDICATION LIGHTS IN C.R. PNLS IF/2F. 11F. INSTAL NEW CABLING FROM R.B.
T O C.R.
MRC 14R 92 402821 RX RECIRC PUMP s MOTOR VIBRATION MONITRS DW RB CR INSTALL VIBRATION MONITORING TRANSDUCERS AND SUPPORT EQUIP. FOR 4 RECIRC PUMPS 7 TRANS. / PUMP AND 5 FOR 1 PUMP.
REL 14R 93 402901 FEEDWATER SYSTEM IMPROVEMENTS CR NCSR REPLACE ANALOG CONTPOL SYSTEM WITH DIGITAL.
142 ISM 94 402925 GENERATOR PROTECTION UPGRADE TB ADD RELAYS AND ALARMS TC PECTECT THE GEN AS PER PJM RECOMMEN0ATIONS.
95 402929 DIGITAL RECIRC FLOW CONTROL 14R 14R REL CR REPLACE GEMAC HARDWARE WITH DIGITAL f
SYSTEM.
RAD 14R 96 402939 DRYWELL EXPOSURE REDUCTION MODS.
DW INSTA*.L IMPROVED EQUIPMENT IN 1 8 SUMP RAD 14R 97 402939 DRYWELL EXPOSURE REDUCTION MODS.
DW INSTALL DRYWELL SERVICES FOR BREATHING /
SERVICE AIR AND WATER.
7-
=0YSTER C#EEK PROJECT LISTINO
{
- i LEGEND j
NRC INTEGRATED' SCHEDULE
[
HEW PROJECTS.
-=
=- -----
l a.
BA NUMBER CHANGE
. CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 10DEC90 l
CLASSITICATION
'OBS BA DESCRIPTION CYCLE /
HUMBER YEARS j
93 402939
'DRYWELL EXPOSURE REDUCTION MODS.
14R RAD
'DW INSTALL IMPROVED RIGGING FOR MSSV*S ANO i
EMRV*S J
99 402939 DRYWELL EXPOSURE REDUCTION mCDS
'14Q RAD Dw j
INSTALL DECK GRATING AT THE 46' ELEV OF l
t THE DRYWELL.
100 402957 OC IA83 ANALOG CONVERSION 14R-REL RB CR REPLACE 5 I A83 PRESS SWITCES WITH f
ANALOG SYSTEM.
1 i
101 402961 OC'EDG OUTPUT CONTROL MODIFICATION 14R MRC i
TB i
REPLACE THE EXISTING GOVERNOR WITH A l
WOODWARD AUTOMATIC GEN LOADING CONTROL.
i REPLACE MISC. ELECTRICAL COMPONENTS.
i I
i 102 402963 LP TURBINE BLADE REPLACEMENT
'14R ISM 1B REPLACEMENT OF LP ISTH STAGE BLADES ON " A LOW PRESSURE TURBINE i
f 103 408AEC VALVE REPLACEMENT _14R 14R REL RB TB' t
I REPLACE SELECTED VALVES IDENTIFIED AS HAVING. MAJOR DEFICIENCIES l
i 104 408825 CONDENSER VALVE REPLACEMENT 14R WQC
'i l
TB REPLACE 2 CONDENSER BACKWASH VALVES' i
I 105 328ADL RX V INTERNAL INSPECTION _ ISR ISR NRR
'119 j
VISUAL INSPECTION OF SELECTED INTERNAL j
COMPONENTS AND SURFACES AS REQ *D BY ASME CODES.-
l
^
/~
-(
T OY S T E.R CREEK PROJECT-LIS.TINO i
a LEGEND' NRC INTEGRATED SCHEDULE NEW PROJECTS.
\\
BA NUMBER CHANGE l
CATEGORY C* PROJECTS f'
SORT BY CATEGORY / CYCLE /BA STATUS AS OF 100EC90 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION i
NUMBER YEARS 106 328AFQ' RCS PIPING REPAIR CONTINGEtX:Y ISR REL DW RB l
CONTINGENCY FOR IGSCC FINDINGS ASSUME TWO OVERLAYS (ONE 10* AND ONC'6")
f AND ADD *L INSP. SAMPLE OF 19 WELDS i
107 402 ABO SQUG MODS.
15R' NRR J
IMPLEMENT MODS RESULTING FROM SOUG
.f WAt_KDOWN IN 14R. SCOPE NOT YET DEFINED.
a
?
l 108 402AFJ TBCCW HX REPLACEMENT ISR REL TB j
REPLACE ONE TBCCW HX r
i 1-I 109 402636 WIDE RANGE NEUTRON MONITORING ISR NRR DW13 INSTALL AN 8 CHANNEL WRNM SYSTEM TO REPLACE EXISTING SRM*S/IRM*S.
4 i
RECIRC PUMP MOTOR RTD CIRCUITS UPGRD ISR MRC 110 402819 r
DW RB23 REPLACE RTD CABLES ON ALL S RECIRC PUMP f
MOTORS FROM MOTOR JUNCTION BOX TO PENETRATION OUTSIDE DW.
111 402948 LP TURBINE (C) LAST STAGE BLADE INSTALL 15R REL TB REPLACE'LAST STAGE BLADES IN LP TURBINE "C".
BLADE FAILURE CONCERNS.
)
112 328259 CONFIGURATION MNGT - DRWG PROGRAM 87-90 ISM PHASE 1 OF 2 - COMPUTERIZED UPGRD OF OC DWNGS. CREATE STHDRS.PROCDRs.
t SAMPL DIGRMS $ IDNFY END-USERS.
I 113-402011 OC REPLICA SIMULATOR 87-91 NRR J
-YARD l
OESIGN, FABRICATE. INSTALL A SIMULATOR-DUPLICATING THE OC CONTROL RM FUNCTIONS-FOR TRAINING PURPOSES.
i
- ~
y r
~
?lif l'[if,i{'
- tI[l[
I[
0 9
CE 0
0 1
F O
S_
A S _
U _ N T _ O A
I T
T S
AC I
R R
L M
M R
M M
F R
C E
S S
R S
S
_ I N
O R
I I
N I
I S
_ SAL C
G n
N I
E-T L
S U
I D
L
/
1 3
4 1
E ES 9
9 9
9 LR H
C-
_ CA 7
7 7
0 0
0 1
2 T
YE 8
8 8
9 9
9 9
9 CY C
S E
ST J
C D
E O
J E
O R
R T
P P
r
-p A
C' 2:
R G
Y I
E R
S E
O M
Y N
E S
L S S
S E
G T
E
)
O TS E
A EY E
E D
T G
Y I
SM 0 S N SF S
S N
A D
D F
S 1/
YE 9 A A YI A
A C
C B
T O
E ES S
T N
N AS 9
N 9
N L
U F
N T
ST BG LT 1
BG 2 BG I
S L T
SO'
. Y. S NI O NU 9 NI 9 NI R.
t EE X AC 0
C. S )
O GW I AJ 1
GW 1
GW R
OT UR E H 9
I P IA S
IA IA C
TP D FO PD 9 OYF SR N EO D SR D SR E
AB A
C N
1 TS
L O T
.A GES D
T U N D D D D T
UD L NL E N
, NF( S E
X SWI E
E N
MN EL.
C AY I IA E MV E SEG T MV' T MV S
IA F P U C.
N LT~
F SF A PI S O S A TR Y RVA E TR E TR Y
R O
O R L
EO LR U XI
- ERO YM I
R E
YM-E YM O
O PT E AOT S EB T VOI N SI L T N G SI G SI EFT G I NSO A A
_I Y YA R NFA S LI M DRC I CD B ETI N CD -
N CD
_T T TL O O A PS.
P I
U C IY3 AX G EE S ON A MRS A ON A ON
_I L IM TT9 E EEE M FPP E A
E NEO M A
M A
R
. I WI L II9 F SFL C TS O DC1 I A P N
.O.S D F C ICR F
F
_C N
OS I A R N OS -
ON OS
__S A
_D
TF.
R NAC I TF I TF.
_E O
AN T IO T ISL NSY E OI T NSY T NSY R TF L HCO N 3M A TAA ta EST S CRD A EST A EST A __
. O C E S Y
A RS R ABN G M I EE R M I R M I T
U.
U IEE L PEI U U O M PML L MTS U PML U PML R C.
FBLGB P OTS G NNI ORI L RAA G ORI G ORI B
A E
/
L T
RBA LEY I IGT
. LOB E OME I LOB I LOB G
E
. M N C.
TOA C.
V A U SO ARD EDL F TIC F EFI M F R F EFI F EFI 4
L P
NSN N VRG Y
RDC N VRG N VRG S
. A C
I OT STO EON O OEU O EEE R ENN O EEE O EEE S N Y
S CA 0 ESL 0 DTA C CDF C DPL D PAI C DPL C OPL T
C C_
CE R Y.
=
/
J E R
O B O
R M G_
P U E
N T
W A
R-7 0
8 8
4 5
3 V
D-E A C__
E-5 8
4 7
3 0
4 F
N-N B
- AB-0 8
1 2
9 3
9 A
E-Y_ BM-9 2
8 8
2 8
2 2
G-B-
U-0 0
2 2
0 2
0 0
E-N-
4 4
3 3
4 3
4 4
L-T R
O S
4 5
6 7
8 9
0 1
S B
1 1
1 1
1 1
2 2
O 1
1 1
1 1
1 1
1 1
l l
l f
i l
- i1l1i 1i
,i'
'!iI l
.m
-OYSTER C R E E'K-PROJECT' LISTING l
y
_ ~
{-
LEGEND-3
' SCHEDULE NRC IN.TEGRATED NEW PROJECTS.
,[
i-BA NUMBER CHANGE 1
j-CATEGORY
- C' PROJECTS r
SORT BY CATEGORY / CYCLE /BA STATUS AS Or 10DEC90 i
1 NUMBER YEARS
[
_____=
h 122 40992G REPLICA SIMULATOR MOOS 92 NRR 1
b l
UPGRADE THE SIMULATOR TO WATCH PLANT j
MODS AS APPLICABLE.
l 123 402AFW CONFIGURATION MANAGEMENT _DBD 1993 93 ISM i
L DEVELOPMENT OF OC SYSTEM DESIGN BASES.
I PERFORM SSF'S AND IMPROVE DRAWING LEGIBILITY
{
i j
124 40993E REPLICA SIMULATOR MODS 93 NRR f
j-t UPGRADE THE SIMULATOR TO WATCH PLANT
{
j MODS AS APPLICABLE.
i 125 402AFX CONFIGURATION MANAGEMENT _DBO 1994 94 ISM i
}
DEVELOPMENT OF OC SYSTEM DESIGN BASES PERFORM SSF*S AND IMPROVE DRAWING 1
LEGIBILITY-I i
r h
l-t E
i t
I I
i
- +
~,
i 4
ATTACHMENT B OYSTED QEEEY, NUCLEAR GENEPJsTIEG STATI,QE NPC INTEGRATED SCHEDULE ffMIANNUAL UP M CATEGOPY "A" PRO,1211 6DD.lllQliS1 AS DENOTED BY
- NEXT TO THE PROJECT TITLE DJLFTIONSL NONE EQEfyE E CHANGESt NONE OTHER CHANGESt NONE C120649
NRC INTEGRATED SCHEDULE - ATTACHMENT B (Cont'dl CATEGORY "B"
PROJECTS l
ADDITIONS:
AS DENOTED BY
- NEXT TO THE PROJECT TITLE COMPLETIONSI NONE DELETTONS:
NONE SCHEDULE CHANGES:
B/A 328030 - CONTROL ROOM HUMAN FACTORS DESIGN REVIEW WORK ON CONTROL ROOM REAR PANELS PREVIOUSLY SCHEDULED FOR 13R AND 14R OUTAGES HAS BEEN DEFERRED TO THE 15R OUTAGE.
THIS DEFERMENT IS BASED ON RELATIVE PRIORITY AND BETTER UTILIZATION OF AVAILABLE RESOURCES.
B/A 402879 - RPS/ESG INSTRUMENT UPGRADE THE OUTAGE 12U PORTION OF THIS PROJECT HAS BEEN INTEGRATED WITH THE 13R OUTAGE SCOPE. THIS CHANGE IS CONSISTENT WITH PREVIOUS INTEGRATED SCHEDULE SUBMITTALS WHERE IT WAS STATED THAT PROJECTS SCHEDULED FOR 12U WOULD BE COMPLETED NO LATER THAN 13R OUTAGE.
B/A 402927 - UPG3bDE P.S.
TO ISO. CONDENSEE VALVES-APPENDIX R B/A 402872 - TORUS 0. SAMPLE LINE ISOLATION THE CYCLE ON THESE TkO ACTIVITIES HAS BEEN CHANCED FROM 12U TO 13R.
THIS SHCEDULE CRANGE IS CONSISTENT WITH PREVIOUS INTEGRATED SCHEDULE SUBMITTALS WHERE IT WAS STATED THAT PROJECTS SCHEDULED FOR 120 WOULD BE COMPLETED NO LATER THAN THE 13R OUTAGE.
B/A - 328260 - RCS STRESS IMPROVEMENT CYCLE CHANGED FROM 13R OUTAGE TO 14R OUTAGE DUE TO HEED TO REDUCE 13R WORK LOAD. THE GPUN AUGMENTED INSPECTION PROGRAM (TOPICAL REPORT 050) WILL BE REVISED TO REFLECT THIS SCHEDULE CHANGE.
B/A - 328284 - CLOSURE HEAD WELDS REPAIR /REPLACEMEEI CYCLE CRANGED FROM 13R OUTAGE TO 14R OUTAGE DUE TO NEED TO REDUCE 13R WORK LOAD. -THE GPUN AUGMENTED INSPECTION PROGRAM (TOPICAL REPORT G50) WILL PE REVISED TO REFLECT THIS SCHEDULE CHANCE. ADDITIONAL IGSCC INSPECTIONS WILL BE PERFORMED AS REQUIRED TO MEET THE AUGMENTED INSPECTION PROGRAM.
C120649
NRC INTEGRATED SCHEDULE - ATTACHMENT B (Cont'di CATEGORY "B"
PROJECTS OTHER CHANGE.El D/A 320ABL - RCS STRESS IMPROVEMENT - IfB THIS ACTIVITY HAS BEEN INTEGRATED WITHIN BUDGET ACTIVITY NO. 328280 NOW SCHEDULED FOR OUTAGE 14R.
B/A 402900 - ISOLATION CONDENSER PIPING MOD 12 THE PORTION OF THE PROJECT RELATED TO MECHANICAL STRESS IMPROVEMENT PROCESS (MSIP) RAS BEEN DEPERRED TO CYCLE 14R DUE TO NEED TO REDUCE 13R WORK LOAD.
THIS TWO YEAR DELAY IN PERFORMING STRESS IMPROVEMENT OF NEW NUCLEAR GRADE PIPING IS CONSISTENT WITH DRAPT NRC STANDARD REVIEW PLAN SECTION 3.6.3.
BUDGET ACTIVITY (B/A) NUMBER CHANGIE QREL NEW B/A#
PREVIOUS B/A #
6 323635 408808 23 328307 328ABJ C120649
1
't NPC INTFGRATED SCHrDULF - ATTACHMPET B (Cont'dl CATEGORY
- C" PPOJECTS EDDITIONS AS DENOTED BY
- NEXT TO THE PROJECT TILE COMPLETIONS:
B/A.
TITLE 328290 DILUTION PLANT AREA REPAIR $ (CYCLE 12) 408786 R REFUELING PLATFORM REPLACEMENT x
EILETION11 328290 DILUTION PLANT AREA REPAIRS (CYCLE 13) 402848 HP TURBINE DI APHRAGM MOD.
OTHER CHANGESt BUDGET ACTIVITY (B/A) NUMBER CHANGES OP,S#
NEW B/A #
EBEy1OUS D/A #
B5 328308 328ABr.
86 328310 328ABP p/A 402636 - WIDE RANGE NEUTRON HONITORING DEFERRED FROM CYCLE 14R TO CYCLE 1$R B/A 402948 - LP TURBINE (C) LAST STAGE BLADE REPLACEMENT DEFERRED FROM CYCLE 14R TO CYCLE ISR l
L C120649
~,,
- ~
-