Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18054B051 + (October 13, 1989)
- ML18054B049 + (October 13, 1989)
- ML18054B047 + (October 13, 1989)
- ML18054B041 + (October 13, 1989)
- IR 05000259/1989007 + (October 13, 1989)
- L-89-364, Special Rept Providing List of Nonfunctional Fire Barrier Penetrations Not Returned to Function Status within 7 Days. Plant Continues to Implement Compensatory Measures as Applicable + (October 13, 1989)
- L-89-369, Advises That Util Will Conduct Emergency Plan Exercise on 891130.Exercise Will Involve Participation by Local Emergency Response Agencies & State Emergency Response Personnel & Will Be Evaluated by FEMA + (October 13, 1989)
- PNO-II-89-071A, updates PNO-II-89-071 Re Turbine Area Fire on 891009.Preliminary Assessment Indicates Little Damage to Main Generator & Main Transformer.Investigation of Root Cause of Initiating Fault Continuing + (October 13, 1989)
- GO2-89-182, Forwards Amend 40 to FSAR for Washington Nuclear Plant 2. Util Did Not Have Time to Revise Plant Controlled Drawings 7.3-18e Through 7.3-18j + (October 13, 1989)
- 05000397/LER-1989-039, :on 890914,discovered Three Discrepancies W/ Current Configuration of Reactor Bldg Exhaust Air Radiation Monitoring Sys That Do Not Satisfy Design Basis Requirements + (October 13, 1989)
- 05000335/LER-1989-005-03, :on 890913,turbine & Reactor Trip Occurred Due to Opening of Breaker CB-3 Inside Reactor Protection Sys Cabinet.Caused by Inadequate Work Order Work Description. Sensitive Sys Procedures Reviewed & Revised + (October 13, 1989)
- IR 05000220/1989029 + (October 13, 1989)
- ML16341F375 + (October 13, 1989)
- ML17305A283 + (October 13, 1989)
- ML16342C234 + (October 13, 1989)
- TAC:75060 + (October 13, 1989)
- ML19325D160 + (October 13, 1989)
- ML19325D458 + (October 13, 1989)
- ML19325C591 + (October 13, 1989)
- ML19325E101 + (October 13, 1989)
- ML19325D807 + (October 13, 1989)
- ML19325D207 + (October 13, 1989)
- ML19351A295 + (October 13, 1989)
- TAC:74471 + (October 13, 1989)
- ML19325D930 + (October 13, 1989)
- ML19325E489 + (October 13, 1989)
- TAC:74774 + (October 13, 1989)
- ML19332C519 + (October 14, 1989)
- ML19325D996 + (October 14, 1989)
- ML19325D377 + (October 14, 1989)
- ML19325D678 + (October 14, 1989)
- ML20012A453 + (October 14, 1989)
- ML20248J380 + (October 15, 1989)
- ML20248J360 + (October 15, 1989)
- ML20248J356 + (October 15, 1989)
- ML20248J347 + (October 15, 1989)
- ML19325E268 + (October 15, 1989)
- ML19324A987 + (October 15, 1989)
- ML19325C382 + (October 15, 1989)
- ML17328A202 + (October 16, 1989)
- ML17305A315 + (October 16, 1989)
- ML17305A316 + (October 16, 1989)
- ML17305A303 + (October 16, 1989)
- ML17305A304 + (October 16, 1989)
- ML17305A300 + (August 31, 1989)
- ML17305A299 + (October 16, 1989)
- ML18094B132 + (October 16, 1989)
- 05000281/LER-1989-005-01, :on 890908,during Performance of Periodic Test on Turbine Bldg Flood Control Circuitry,Two of Four Condenser Waterbox Circulating Water Inlet Isolation Valves Closed Unexpectedly + (October 16, 1989)
- ML18153B936 + (October 16, 1989)
- ML19351A406 + (October 16, 1989)
- ML19351A367 + (October 16, 1989)
- ML19351A366 + (October 16, 1989)
- ML19351A363 + (October 16, 1989)
- ML19351A361 + (October 16, 1989)
- W3P88-1849, Application for Amend to License NPF-38,consisting of Tech Spec Change Request NPF-38-103,revising Table 4.3-1 of Tech Spec 3/4.3.1, Reactor Protective Instrumentation & Table 4.3-2 of Tech Spec 3/4.3.2, ESF Actuation Sys.. + (October 16, 1989)