~ACCElZRATZD
à BUTION DEMONSTRATION SYSTEM REGULAT INFORMATION DISTRIBUTION+STEM (RIDE)
ACCESSION NBR:8910250171 DOC".DATE: 89/10/16 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana 05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit '2, Indiana a.
05000316 AUTH.NAME AUTHOR AFFILIATION ALEXICH,M.P.
Indiana Michigan Power Co. (formerly Indiana s Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.
Document Control Branch (Document Control Desk)
SUBJECT:
Responds to 890911 SER on plant conformance to Reg Guide 1.97.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR 1 ENCL 0 SIZE:
TITLE: OR Submittal: General Distribution NOTES:
RECIPIENT ID CODE/NAME PD3-1 LA GIITTERFJ.
INTERNAL: NRR/DEST/ADS 7E NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD3-1 PD NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 OC L G
FILE'RC PDR COPIES LTTR E 1
CL h
0 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL
t
n r
Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 AEP:NRC:0773AG TAC Nos
~
51080
& 51081 Donald C.
Cook Nuclear Plant Units 1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 WIDE-RANGE STEAM GENERATOR LEVEL INSTRUMENTATION UPGRADE U,S, Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Attn:
T. E. Murley October 16, 1989
Dear Dr. Murley:
The following information is provided in response to the NRC Safety Evaluation Report on "D. C.
Cook Conformance to Reg.
Guide 1.97",
dated September 11, 1989.
Although the level instrumentation presently installed is not environmentally or seismically qualified and the electrical cables associated with the instruments do not meet the separation criteria as stated in Reg.
Guide 1.97 for Category 1
variables, we will provide each of the four steam generator wide-range level instruments (one per steam generator) with a diverse Class 1E power source, At present, one Class 1E power source feeds all four steam generator level instruments.
This change was reviewed with the NRC staff during a teleconference among Messrs.
J.
G.
Giitter, B. Marcus and A. C.
Udy on September 25, 1989.
We estimate completion of this repowering by December 31, 1989 for both Units 1
and 2.
This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely, M. P. Alexich Vice President onL a)p 89i025017i 89iOih PDR ADOCK 050003i5 e
PNU
Dr, T. E. Murley AEP:NRC:0773AG eh cc:
D. H. Williams, Jr.
A. A. Blind - Bridgman R.
C. Callen G
~ Charnoff NFEM Section Chief A. B. Davis - Region III NRC Resident Inspector
- Bridgman