Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205E811 + (October 12, 1985)
- LG-85-002, Forwards Actions Taken to Improve Regulatory Performance in Fire Protection & in Areas in Which Activity Continuing & SALP 1 Goal Not Achieved,Per SALP 6 Board Rept 50-341/85-27 + (October 12, 1985)
- ST-HL-AE-1403, Forwards Revised FSAR Figures 11.4-1 & 2,per Draft SER, Section 11.4,Open Item 11.4-2 Re Process & Instrumentation Diagram for Solid Waste Processing Sys.Figures Will Be Incorporated Into FSAR as Part of Amend 52 + (October 12, 1985)
- ST-HL-AE-1391, Forwards Response to Draft SER or FSAR Items Concerning Recirculation Intake Structures Per Reg Guide 1.82.Encl marked-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (October 12, 1985)
- ST-HL-AE-1418, Forwards Response to Draft SER or FSAR Items Re Sections 2.4,3.4 & 3.5,including marked-up FSAR Pages to Be Incorporated in Future FSAR Amend.List of Draft SER & FSAR Open & Confirmatory Items & Open NRC Questions Provided + (October 12, 1985)
- ST-HL-AE-1415, Forwards Response to Draft SER or FSAR Items. Marked-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (October 12, 1985)
- ST-HL-AE-1404, Notifies That FSAR Table 7.5-1 Lists All Plant Category 1 & 2 post-accident Monitoring Equipment & Qualification for Category 1 & 2 Variables,In Response to Draft SER Open Item 3.11-3 + (October 12, 1985)
- ST-HL-AE-1408, Forwards Response to Open & Confirmatory Draft SER Items, FSAR Open Items & Open NRC Questions Re Environ Qualification Detection of Fuel Rod Failure Schedule. Np Kadambi Received List on 851008 from Me Powell + (October 12, 1985)
- ST-HL-AE-1392, Forwards Response to Draft SER or FSAR Items Re Feedwater Line break.Mark-ups on FSAR Pages Will Be Incorporated in Future FSAR Amend + (October 12, 1985)
- ST-HL-AE-1397, Forwards Responses to Draft SER & FSAR Items Re Chapters 5, 6 & 7 Concerning RHR HX design.Marked-up FSAR Pages Will Be Included in Future FSAR Amend.Listed Item Numbers Correspond to List Given to Np Kadambi on 851008 + (October 12, 1985)
- ST-HL-AE-1399, Forwards Response to Draft SER or FSAR items.Marked-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (October 12, 1985)
- ST-HL-AE-1380, Forwards Responses to Draft SER Open Items Re Section 9.5.1, Fire Protection. Fire Hazards Analysis Rept Amend Includes Encl Responses + (October 12, 1985)
- ST-HL-AE-1419, Forwards Response to FSAR or Draft SER Items,Including Items D 4.4-3 Re Loose Parts Monitoring Sys,Per Rev 1 to Reg Guide 1.133 & D 12.3-4 Re Containment Radiation Monitors,Per NUREG-0737,Item II.F.1.3 + (October 12, 1985)
- ST-HL-AE-1409, Forwards Response to Draft Ser/Fsar Items,Including TMI Item II.F.1.Encl marked-up FSAR Pages Will Be Included in Future Amend + (October 12, 1985)
- ST-HL-AE-1394, Forwards Response to Draft SER or FSAR items.Marked-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (October 12, 1985)
- ST-HL-AE-1395, Forwards Response to Draft SER or FSAR items.Marked-up FSAR Pages Will Be Included in Future FSAR Amend + (October 12, 1985)
- ST-HL-AE-1411, Forwards Response to Draft SER or FSAR Items + (October 12, 1985)
- ST-HL-AE-1420, Forwards Response to Draft Ser/Fsar Item F 9.4-2 (Partial) Re Miscellaneous Bldgs HVAC Sys & Current Design Info.Encl Includes marked-up FSAR Pages Which Will Be Incorporated Into Future FSAR Amend + (October 12, 1985)
- ST-HL-AE-1402, Forwards Response to Draft SER or FSAR Items Re MSIV Closure on Safety Injection.Encl marked-up FSAR Pages Will Be Incorporated Into Future FSAR Amend + (October 12, 1985)
- ST-HL-AE-1405, Forwards Response to Draft SER or FSAR Items Re ASHRAE, Including marked-up FSAR Pages to Be Incorporated in Future FSAR Amend.List of Draft SER & FSAR Open & Confirmatory Items & Open NRC Questions Provided + (October 12, 1985)
- ST-HL-AE-1393, Forwards Response to Draft SER or FSAR items.Marked-up FSAR Pages,Which Will Be Incorporated in Future FSAR Amend,Encl + (October 12, 1985)
- ST-HL-AE-1416, Responds to Draft SER Confirmatory Item 0.0-4 Re Confirmatory Test Described in IE Bulletin 80-06.Revised Response to Question 032.43 Committing to Testing Required by Action 2 of Bulletin Encl + (October 12, 1985)
- ML20138G689 + (October 12, 1985)
- ML20138G701 + (October 12, 1985)
- TAC:59124 + (October 12, 1985)
- IR 05000395/1985034 + (October 12, 1985)
- RBG-22-341, Ro:On 851012,fire Occurred at Fancy Point 500 Kv Switchyard. Caused by Apparent Lightning Strike.Fire Extinguished. Damaged Equipment to Be Replaced.Investigation & Evaluation of Emergency Plan Ongoing + (October 13, 1985)
- 05000368/LER-1985-019, :on 850913,main Steam Isolation Sys Actuated on Low Steam Generator Pressure During Plant Cooldown.Caused by Personnel Error.Sys Restored to Preactuation Condition. Personnel Counseled + (October 13, 1985)
- ML20138P590 + (October 13, 1985)
- ML18019A646 + (October 14, 1985)
- ML18019A644 + (October 14, 1985)
- ML18019A420 + (October 14, 1985)
- ML18092A861 + (October 14, 1985)
- ML18092A858 + (October 14, 1985)
- ML20137R406 + (October 14, 1985)
- ML20137R336 + (October 14, 1985)
- ML20137J806 + (August 28, 1985)
- ML20138R061 + (October 14, 1985)
- ML20138N172 + (October 14, 1985)
- ML20138N161 + (October 14, 1985)
- ML20138M184 + (October 14, 1985)
- ML20138L914 + (October 14, 1985)
- ML20138G697 + (October 14, 1985)
- ML20138F805 + (August 28, 1985)
- ML20138F868 + (October 14, 1985)
- ML20138F712 + (October 14, 1985)
- IR 05000289/1985021 + (October 14, 1985)
- ML20138F098 + (October 14, 1985)
- ML20138D656 + (October 14, 1985)
- ML20138D053 + (October 14, 1985)
- ML20138D043 + (October 14, 1985)
- ML20138D039 + (October 14, 1985)
- ML20138D003 + (October 14, 1985)