Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038B126 +
- ML18038B125 +
- ML18101A469 +
- ML20078J101 +
- ML20078G498 +
- ML20078G481 +
- ML20078G412 +
- ML20078G352 +
- ML20078G323 +
- ML20078G289 +
- ML20078G205 +
- ML20078G136 +
- ML20078G052 +
- ML20078G033 +
- ML20078G009 +
- ML20078F954 +
- ML20078F909 +
- ML20078F878 +
- ML20078D695 +
- ML20078C987 +
- ML20078B098 +
- ML20078A878 +
- ML20078A860 +
- ML20078A838 +
- ML20078A817 +
- ML20078A445 +
- ML20078A322 +
- ML20078A229 +
- ML20078A217 +
- ML20078A049 +
- ML20078A028 +
- ML20077S022 +
- ML20077R983 +
- ML20077Q979 +
- ML20077Q416 +
- ML20077P750 +
- ML20211F016 +
- NRC-95-4389, Forwards Proprietary PXS-T2R-033, Quick Look Rept for SPES- 2 Matrix Test S01613 AP600 Program. Rept PXS-T2R-033 Withheld (Ref 10CFR2.790). Proprietary Portion of Document Sent to Westinghouse +
- ST-HL-AE-4969, Forwards Revised Semiannual Fitness for Duty Program Performance Rept for 940101-0630 +
- B15083, Informs NRC That Startup Assessment Team Established to Conduct in-depth Assessment of Facility Readiness for Plant start-up.Scope of Assessment Includes Listed Categories. Startup Assessment Team Charter Encl +
- NRC-95-4388, Forwards Proprietary Westinghouse AP600 Long Term Cooling Test at Oregon St Univ Facility Drawings,Piping & Investigation Diagrams +
- ML20265C342 +
- ML20216C793 +
- ML20198E338 +
- 05000374/LER-1994-010-08, :on 941214,division 2 ECC & RCIC Initiated Due to Ps Isolation Valve Leak.Action Request Was Initiated to Repair Isolation Valve +
- 05000325/LER-1994-015-01, :on 941215,HPCI Injection Valve Did Not Receive an Open Signal & No Injection Into Rv.Caused by Personnel Error.Use of Simpson 260 Meters Which Have Tone Position on Switch Has Been Discontinued +
- 05000327/LER-1994-016, :on 941214,determined That TVA Should Provide NRC Notification of Listed Three Events,Previously Granted Enforcement Discretion.Causes of Events & Corrective Actions Listed +
- 05000298/LER-1994-019, :on 940411,determined That Feedwater Flow Transmitters Had Been Improperly Calibrated Since Installation in 1980.Caused by Personnel Error.Power Reduced by 20 MW (Th) & Recalibrated +
- 05000298/LER-1994-012, :on 940708,TS Noncompliance for HPCI Sys Noted Re Setpoint Discrepancy Associated W/Low Steam Line Isolation Pressure Switches.Requested TS Change to NRC Establishing Operability Limit for HPCI +
- 05000454/LER-1994-003-01, :on 940314,AF Isolation Valve Was Exposed to Potentially Harsh Environ Due to Flood Seal Removal. Verified That AF Tunnel Fso Plates in Place on Both Units & Required That Fso Plates Remained in Place +