Responds to 951205 Request for Addl Info Re Responses to GL 93-04, Rod Control Sys Failure & Withdrawal of Rod Cluster Control Assemblies
ML20077R983
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/12/1995
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1190B, GL-93-04, GL-93-4, NUDOCS 9501230218
Download: ML20077R983 (3)


Text

.

.. Irdana Michigan Power Company 8:

  • 4 P.O. Box 16631 Cofumbus, OH 43216 i

INDIANA MICHIGAN POWER AEP:NRC:11908 GL 93-04 Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 RESPONSE TO REQUEST FOR AGITIONAL INFORMATION PERTAINING TO GENERIC LETTER 93-04, " ROD CONTNL SYSTEM FAILURE AND WITHDRAWAL OF ROD CONTROL CLUSTER ASSEMBLIES" U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 January 12, 1995

Dear Mr. Russell:

F This letter is in response to your staff's December 5,1994, request for additional information pertaining to our responses to Generic Letter 93-04, " Rod Control System Failure and Withdrawal of Rod cluster Control Assemblies." Specifically, your staff has requested us to either commit to implement Westinghouse's recommended current order timing modification and surveillance test, or provide an alternative long-term plan. Also stated in the request was that the modification and surveillance should be implemented during the next refueling outage.

Your staff, in a letter to the WOG, dated November 10, 1994, approved the following documents:

(1) WCAP-13864, Rev.

1,

" Rod Control System Evaluation Program," (2)

Westinghouse Technical Bulletin NSD-TB-94-05-RO, " Rod Control CRDM Timing Change," and (3) "WOG Recommended Rod Cont?.o1 System Surveillance Test."

Your staff found that the WOG's response, as discussed in the above Westinghouse documents, was an acceptable long'-term resolution to Generic Letter 93-04.

We will implement the current order timing modification, as described in Westinghouse Technical Bulletin NSD-TB-94-05-RO, during the next refueling outage for each unit. The WOG's Recommended Rod l

Control System Surveillance Test (submitted by the WOG to the NRC, July 12, 1994) will be used to develop a post modification i

acceptance test to be performed upon initial installation and a I

surveillance test to be performed during each refueling outage. The i

Unit i refueling outage is scheduled for the third quarter of 1995.

950'1230218 950112 PDR ADOCK 05000315 P.

.PDR

f I

4

/' >

e

.,Mr. W. T. Russ.11 2-AEP:NRC:11908 The Unit 2 refueling outage is scheduled for the first quarter of 1996.

As requested by your staff, we will inform you upon the successful implementation of the modifications and completion of the a

surveillance tests.

This letter is submitted pursuant to 10 CFR 50.54(f) and, as such, an oath statement is attached.

i Sincerely, v

E. E.-Fitz a rick Vice President eh Attachment i

cc:

A. A. Blind C. Charnoff J. B. Martin - Region III NFEM Section Chief NRC Resident Inspector - Bridgman l

J. R. Padgett 9

3 f

r l'

a e

l

.l

'- s -l

.e-i

?

STATE OF. OHIO)

COUNTY OF FRANKLIN)

-i E. E. Fitzpatrick, being duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power i

Company, that he has read the forgoing RESPONSE TO REQUEST FOR j

ADDITIONAL INFORMATION PERTAINING TO CENERIC LETTER 93-04 and knows the contents thereof; and that said contents are true to the best of his knowledge and belief.

f

)

!(

Subscribed and sworn to before me this

/2 4 day of

_ bl-,,u; x-t u 19 9s hs 40kk I

/ NOTARY PUBLIC C'Tl, D. li!LL PFTY rC'C. STME OF CHl0 121 C0;..u;L. 0:1;,1:3 4.L7-t9 a