s PEACH BOTTOM ATOMIC POWER STATION UNIT 2 l

INSERVICE INSPECTION

SUMMARY

REPORT l

FOR THE i

12/11/92 TO 10/22/94 l

l PERIODIC INSPECTION l

l Al$

J~

  • TN I~ b ~

PECO Energy ISI Engineer e

l L ~

\\)

Date PECO Energy Manager - Component, Engr.

M/x ~/-(-75~

Date PECO Energy Director - Site Engineering Y

/d"$I Date s

Authorized Nuclear Inservice Inspector

/// 1In i Ddte i

9501270201 950117 PDR ADOCK 05000277 Q

PDR

3 TABLE OF CONTENTS Pages Form NIS-1 Owner's Report For Inservice Inspections 2

Introduction 1-Section.1 Summary of Examination Imgend' 1

Summary of.In-Service Inspection Results During Unit 2, 10th Refuel Outage 86 Section 2 Summary of Reportable Conditions Observed During In-Service Inspection 3

Section 3 Summary of ASME XI Repairs and Replacements-5 i

Section 4 Summary of In-Service Inspection Results Durlng Unit 2, Pre-Outage (Credited towards Second Period) 2 t

l 4

,.y7 y&v

+-,

~

.,e

~-q p h.

- - + -


s-

,--,-----s


ew

'e t

ee

=

eW k

s FORM NIS-1 INSERVICE INSPECTION REPORT l

PECO ENERGY COMPANY 955/65 Chesterbrook Blvd.

J Wayne, PA 19087-5691 i

Date:

January 4, 1995 i

1 s

Peach Bottom Atomic Power Station - Unit 2 Inspection Date:

RD #1, Box 208 December 11, 1992 to Delta, Pennsylvania 17314 to October 22, 1994 Commercial Service Date:

July 5, 1974 Gross Generating Capability:

1158 MWe Pennsylvania State Identification Number:

B122001 (NB 3903)

Component Identification ASME Class 1, 2, and 3 Components Abstract of Inspections Performed, Conditions Observed, Corrective Measure Recommended and Taken are Attached Section 1 - Inservice Inspection Summary Section 2 - Reportable Conditions Section 3 - Summary of ASME XI Repairs and Replacements Section 4 - Inservice Inspection Summary (Pre-Outage)

Name of Inspector:

James Fuhrman i

Name of Mailing Address of Inspector's Employer:

The Hartford Steam Boiler Inspection & Insurance Co.

610 Freedom Business Center Drive Suite 300 King of Prussia, PA 19406 I certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Section XI Code, Generic Letter 88-01, or other augmented requirements as applicable.

h l/h.V PECO,EM'ergy Direct'o'r - Site Engineering tate

- s l

l i

i FORM NIS-1 INSERVICE INSPECTION REPORT PAGE 2 l

CERTIFICATE OF INSERVICE INSPECTION i

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Pennsylvania and employed by Hartford Steam

)

l Boiler Insoection & Insurance Comoany of Hartford. Connecticut have l

inspected the components described in this Owner's Data Report l

during the period 12/11/92 to 10/22/94 and state that to the best l

of my knowledge and belief the Owner has performed examinations and j

taken corrective measures described in this Owner's Data Report in i

accordance with the requirements of the ASME Code,-Section XI.

By signing this certificate, neither the Inspector nor his employer makes any

warranty, expressed or
implied, concerning the i

examinations and corrective measures described in this Owner's Data j

Report.

Furthermore, neither the Inspector nor his employer shall l

be liable in any manner for any personal injury or properly damage I

or loss of any kind arising from or connected with this inspection.

Date:

I' 12.1 %

~

i uJ Commissions fBh 6zh1 l

n ector's Signature National' Board, State, d

Province & No.

t

(

i 1

i 3

INTRODUCTION l

I During the period from December 11, 1992 through October 22, 1994 In-Service Inspections were performed at Peach Bottom Atomic

~

Power Station, Unit 2.

Unit 2 was shutdown for a scheduled refuel outage during the period from September 16, 1994 through October 22, 1994.

The inspection performed during this refuel outage was credited towards the third period of the second ten year interval.

l Section 4 of this report describes inspections that are credited towards the second period of the second ten year interval.

j I

Examinations completed during these periods were performed by PECO Energy Company and/or General Electric Company in accordance with the requirements of ASME Section XI,1980 Edition with Addenda through Winter 1981.

In addition to ASME Section XI, other examinations were performed to meet the augmented inspection requirements of the folle' ng:

I.E.

Bulletin 80-13 Cracking in Core Spray Spargers NUREG-0619 BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking Generic Letter 88-01 NRC Position 'on IGSCC in BWR Austenitic Stainless Steel Piping (including Supplement 1)

SIL 462, Supp 3 Cracking in Creviced Inconel 600 Access Hole Cover Weldments SIL 554 Top Core Guide Cracking Generic Letter 94-03 Core Shroud Cracking i

t

f l

I Section 1 l

l INSERVICE INSPECTION

SUMMARY

s l

l i

Secbion 1 l

l

SUMMARY

OF IN-SERVICE INSPECTION RESULTS DURING UNIT 2, 10TH-REFUEL OUTAGE PEACH BOTTOM ATOMIC POWER STATION UNIT 2 DECEMBER 11, 1992'TO OCTOBER 22. 1994 i

i t

m

DATE:

'FEACH SOTTOM ATOMIC POWER STATION.

PACE:

REUIS!0N:

INSERv!CE INSPECTION

SUMMARY

]

REACTCR PRESSURE VESSEt-

+

5 8

2 3

NR R ASME S 0EGE k

T RCEP SEC. XI

SUMMARY

EXAMINATION AREA CATGY EXAM A E o 0 0 REMARKS NUM6ER IDENTIFICAT!0N ITEM NO METHOD PROCEDURE T C R M R ** CALIBRATION BLCCC **

SUMMARY

OF EXAMINATION LEGEND 1.

Identification of system.

2.

Component identification and description.

3.-

ASME Section XI Category and Item Number applicable.to the component.

If there is an augmented requirement to perform an examination, then "li/A" will appear in this location.

4.

Exam method (NDE). applicable to the component.

5.

NDE procedure used to perforn the examination on the component.

6.

Exam Status:

a)

C=

Completed b)

U=

Unscheduled Complete c)

P=

Preservice Complete '

d)

A=

Augnented Complete j

e)

E=

Expanded Scope Complete 7.

Examination results broken down into 5 categories described below:

i a)

NOREC =

No recordable indications detected 1

b)

RECOR =

Recordable indications detected c)

GEOM =

Geometric indications detected '

d)

REPOR =

Reportable indications which require corrective action to maintain structural adequacy 8.

Remarks field which contains specific information concerning the component examination or evaluation of examination results.

e f

I l

t l

l DATE: 01/04/95 PEACM BOTTON ATONIC POWER STATION UNIT 2 PAGBt

-1 REVISION:

2 INSERVICE INSPECTION

SUMMARY

SECOND IlfrERVAL, THIRD PERIOD, FIRST CUTAGE (94RF)

(

CLASS 1 CFAUEP ETATUS COMPONENTS l

REACTOR PRESSURE VBSSEL i

NR R

ASME S'OEGE

('

'SEC. XI T RCEF KVMMARY EXAMINATION ARIA CATUY EXAM A E O O O' REMARKS NUMBER IDENTIFICATION ITEN No NETMCD Pet 0CEDURE T CRMR ** CALIBRATION 314CK*+

CIRCUMFERENTIAL WEtail (REF. DWG NO. ISI-2-PV-01) 000600 RPV-C6 B-A UT 0 UT-P9N-006V5 R0 C X -. - - EXAMINED CW FROM STUD NO. e t THRU STUD.

SHL CRS No. 5 TO FLANGE B1.30 NO. 27.

RX CAVITY, EL 207-1 e,13.CS-5**

f i

NOEZLE-TO-SHELL WE!as (REF. DWG, No. ISI-2-RV-011 003000 N3B B-D UT-OL'**

ff-PAN-400VO R0 C

    • NO CODE VOLUME COULD BE EXAMINED MAIN STEAM NO22LE 33.90 UT-458 UT-PON-400VO R0 X---

EFFECTIVELY WITH THE O DEG L.

DW, EL 203-0, 110 A3 UT-608 UT-PSN-400VO R0 X---

DW, EL 203-0, 110 A2 UT-OL UT-PBN-300VO R0 X---

r UT-458 UT-PBN-300VO R0 X---

    • 6.562-CSCL-39-PEB**-

i UT-608 UT-PSN-300VO R0 X--*

i

    • NO CODE VOLUME COULD BE EXAMINED.

003100 N3C B-D UT-OL **

UT-PSN-400VO R0 C MAIN STEAM NO3 ELE 33.90 UT-458 tPT-PSN-400VO R0 X---

EFFECTIVELY WITH THE O DEG L.

DW, EL 203-0, 250 A3 CT-608 UT-PBN-400VO RO X---

i DW, EL 203-0, 250 A2 UT-OL UT-PBM 300VO R0 X---

I UT-458 UT-PSN-300VO Ro I---

    • 6.562-CSCL-39-PEBe*

f

-3 UT 608 UT-P9N-300VO R0 X---

l i

003250 N4A B-D UT-OL UT-PSN-400VO R0 C FREDWATER N0ZZLE B3,90 UT-453 UT-P9N-400VO R0 X---

1 DW, EL 138-0, 30 A3 UT-603 UT-P9M-400VO R0 X---

I DW, EL 1st-0, 30 A2 ti-OL UT-P9N-300VO R0 X---

UT-458 UT-PBN-300VO R0 X---

    • 6.562-CSCL-39-PIB**

Li-6DS UT-PSN-300VO RO I--*

l

\\

I (PEF. DWG. No. ISI-2-R7-01)

' I J

003275 N4A-BORE N/A ZONE 2B UT-P9N-401VO R0 A X---

CALIBRATICN BLOCKS TCKAI2/F"'KUSHIMA6, 1

FEEDWATER N0ZELE BORE N/A 2CNE 3 UT-79N-401VO RD X---

NIRE1 AND 8534 WERE USED.

DW, EL 186-0, 30 AZ ZONE 4A UT-PDM-311VO R0 X---

DW, BL 136-0, 3 0 A3 ZONE 4B UT-PBN-311VD RD X---

ZONE 5 UT-PgN-311VD R0 X---

i I.

It-l

e,

e DATE: 01/04/95 PEACH BCTTOM ATOMIC POWER STATION UNIT 2 PAGE:

2 REVISION:

2 INSERYTCE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST CLiAGE (94RF)

CLAS: 1 CFAUBP STATUS COMPONENTS REACTOR PPESSORE VESSEL NR R

ASME S 0EGE t

SEC. XI T RCEP

SUMMARY

EXAMINATION AREA CATGY EXAM A EOOO REMARKS r

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR "CALIRRATION BLOCK" N02ZLE-To-SMELL WELDS fpIP. DWG. No. IS!-2-RV-01) 003300 N48 B-D UT-OL IT!-PBM-400VO R0 C --==

FREDWATER N0ZZLE B3.90 17T-4 53 VT-PBM-400VO R0 I---

DW, EL 1et-0, 90 AZ UT-608 UT-PBM-400VO R0 1---

DW, EL 19 8 - 0, 90 AZ 177-OL UT-PBM-300VO R0 X---

tTT-4 58 UT-PBM-300VO RO I---

"6.562-CSCL-3 9-PES" -

UT-60S UT-PBM-300VO R0 X---

-(PIF. DWG, No. IST-2-PV-011 003350 N4B-BORE N/A ZONE 28 UT-PBM 401VO R0 A X---

CALIBRATICN BI4CKS TOKAI2 /FTKUSHIMA6, FEEDWATER N0ZZLE BCRE N/A ZCNE 3 LT-PBM-401VO R0 X--.

NIRZ1 AND S$#4 WERE USED.

DW, EL 186-0, 90 AZ ZONE 4A ITT-PBM-311VO R0 X---

DW, IL 186-0, 90 AZ ZONE 48 ITT-PBM-311VO R0 X---

ZONE 5 UT-PBM-311VD RD X---

ZONE 28 UT-PBM-311VO R0 X---

N0f!LE-To-SMELL WELDS iPEF. DWG. No. If7-2-RV-01) 003400 N4C B-D LT-OL UT-PBM-400VO R0 C

=---

FEEDWATER N0ZZLE B2.90 t?T 455 L*T-PBM-400VO R0 I---

DW, EL 188-0, 150 AZ UT-60S tTT-PBM-400VO R0 X

DW, EL 188-0, 150 AZ Li-CL UT-PBM-300VD R0 X---

L7-453 L7-PBM-300VO R0 X---

" 6. 562 -CS OL-3 9 - PE3 "

UT-6 S UT-PBM-300VO RO X---

(PEF. DW3. NO. TSI-2-RV-01t 003450 N4C-BORE N/A ZONE 28 UT-PBM-401VO R0 A X---

CALIBRATION BLOCKS TOKAI;./T KUSHIMA6, FEEDWATER NOZZLE BORS N/A ZONE 3 UT-PBM-401VD R0 X---

NIRZ1 AND S$84 WERE USED.

DW, EL 186-0, 150 AZ ZONE 4A t?T-PBM-311VD R0 X---

DW, IL 186-0, 150 AZ ZONE 48 UT-PBM-311VO R0 X---

ZONE 5 LT-PBM-311VO PO X---

NCETLE-TO-SMELL WELOS (PEF. CWG. No. IS!- 2 -P7 '31) 003500 N4D B-D tTT-CL ITT-PBM-400VO RO C ----

FEEDWATER N0ZZLB B3.90 UT-453 Iff-PBM 400VO R0 X---

DW, EL 166-0 210 AZ UT-608 UT-PBM 400VD R0 X--

DW, EL 188-0, 210 AZ ITT-CL UT-PBM-300VO R0 X---

UT-453 UT-PBM-300VD R0 X-.

    • 6.562-CSCL-39-PEB**

17T-603 ITT-PBM 300VO R0 X---

I l

s s

l I

l DATE: 01/04/95 PEACH BCTTCM ATOMIC POWER STATION UNIT 2 PACE:

3 l

REVIIION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 1 CFAUSP STATUS CCMPONENTS PEAC* rep PPESSUPE VSSSEL NR R

j ASME 5 0EGB l

SEC. XI T RCEP

SUMMARY

EXAMINATION AREA CATGY EXM A B000 REMARKS WUMBER IDENTIFICATICH ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION BLOCK **

fPEP. Dw3. NO. ISI-2-PV-01) 003550 N4D-BCRE N/A ZCNE 2B W-PBM-4 01VO R0 A X...

CALIBRATION BLOCKS TCKA%2/FUKUSHIMA6, I

FEEDWATER NOZZLE BORE N/A ZONE 3 W PBM 401VO R0 X-..

NIRZ1 AND S484 WERE OSED.

l j

DW, EL 186-0, 210 AZ ZONE 4A UT-PBM-311VD R0 X*..

DW, EL 186-0, 210 AZ ZCNE 4B UT-PBM 311VO RD X..-

ZCNE 5 UT-PBM-311VO RD X--.

=*.**

ECNE 2B W -PBM-311VO RD X

l N0ZZLE-M-SMELL WELDS f7EP. DWG. NO. TSI-2-PV-01) i 003600 W4E B-D LT-CL UT PBM 400VO R0 C....

FERDWATER N0ZZLE B3.90 LT-4 55 UT-PBM 400VO RO X..-

DW, EL 186-0, 270 AZ LT-6 08 UT-PBM-400VO R0 K...

DW, EL 188-0, 270 AZ tTT-OL UT-PBM-300VO R0 X...

I W-458 UT PBM-300VO R0 X...

    • 6.562.CSCL-39-PEBe*

UT-60s UT-PBM-100VO R0 X-..

(P EP. DwG. No. TSI-2-PV-01)

~

003650 M4E-BCRE N/A ECNE 2B UT-PBM 401VO R0 A X...

CALIBRATICN BLOCKS TCKAI2/F"KUSHIMA6, FEEDWATER H0ZZLE BORE N/A ECNE 3 UT-PBM 401VD R0 X...

NIRZ1 AND S3#4 WERE TSED.

DW, EL 166 0, 270 AZ ECNE 4A W-PBM-311VO R0 X---

DW, EL 186-0, 270 AZ ZCNE 4B UT-PBM-311VO R0 X

ECNE 5 LT-PBM-311VD R$

X...

NCZILE *0-SFELL WELDS fPEP. DWG. NO. TSI-2-PV-01) 003700 N4F B-D UT-CL t?T-PBM-400VD RD C...-

FEEDWATER N0ZZLE B3.90 UT-458 17T-PBM-400VO R0 X---

DW, EL 188-0, 330 AZ W-60s tTF-PBM 400VO R0 X+.*

l DW, EL 188-0, 330 AZ UT-OL UT-PBM-300VO R0 X.

LT 453 UT-PBM-300VO RO I-.*

    • 6.562-CS *-39-PEB**

LT-605 UT-PBM-300V0 R0 X...

! PEP. DwG. NO. ISI-2-PV-01) 003750 N4F-BCRB N/A ZONE 28 tTT-PBM-401VO R0 A X-..

CALIBRATICN BLOCKS TCFAI2/T"KUSHIMA6, FEEDWATER N0ZZI.E BORE N/A 2CNE 3 UT-PBM-401VD R0 X...

NIRZ1 AND $$64 WERE TSED.

DW, EL 106-0, 330 AZ ZONE 4A UT PBM-31?VO R0 X

DW, EL 186-0, 330 AZ ZONE 48 UT PBM-311VO RO X--.

ZONE 5 UT-PBM-211VD R0 X-.*

l l

[

}

l g

F l

DATE: 01/04/95 PEACM BC""CM ATOMIC POWER STATION UNIT 2 PAGE:

4 REVISION:

2 INSERVICE INSPEt"' TION SCMMARY SECOND INTER *.*AL, TMIRD PERIOD, FIRST OLTTAGE (94RF)

CLASS 1 CFAUEP STATUS CCMPONENTS P EACTCR PPESSUPE VRSSEL k

NR R

ASME S OEOE SEC. XI T RCEP CUMMARY EXAMINATION AREA CATGT EXAM A EOOO REMARKS Y

NUMBER IDENTIFICATION ITEM NO METHCD PROCEDURE T CRMR **CALIBRATICN BIDCK "

P WZILE-TO-SHELL WELDS (REF. DWG. No, ISI-2-P'7-01) p 004000 N9 B-D UT-CL UT-PBM-300VO R0 C X-**

CRD NCZZI.E B3.90 UI-455 UT-PEM-300VO R0 X-DW EL 186-0, 140 A2 UT-6*$

Li-PBM-300VO 10 X---

    • 6.562-CSCL-39-PEB "

I 1

004200 N1B B-D UT-OL UT-PBM-4 00VO R0 C MAIN RECIRC OUT No1 83.90 UT-415 ITT-PBM-400VO R0 X---

DW, EL 161-0, 180 A3 17T-608 UT PBM-400VO RO X---

DW, EL 161-0, 180 A:

UT-455 ITT-PBM-300VO R0 X---

W-6 CS UT-PBM-300VO R0 X---

"6. 5 62 -CS CL-3 9 - PEB "

2 1

)

004900 N2G B-D UT-CL UT-PBM-400VO R0 C 7

i MAIN RECIRC IN NC2 B3.90 UT-453 Li-PSM-400VO R0 X--=

DW EL 164-0 240 AZ UT-605 UT-PBM-400VO R0 X--*

DW EL 164-0 240 A UT-OL UT-PBM-300VO R0 X---

3 UT-453 ITT-PBM-300VO R0 I---

" 6. 5 6 2 -CSCL-3 9 - PEB" UT-608 UT-PBM-300VO R0 X---

405100 N2J B-D UT-CL UT-PBM-400VO R0 C MAIN RECIRC IN NCZ B2.90 LT-458 tTT-PBM-400VO R0 X---

DW, EL 164-0, 300 AZ LT-605 Li-PBM-400VO R$

X---

DW, E*

164-0, 300 A3 Li-458 UT-PBM-300VO R3 X+--

UT-6*$

UT-PBM-300VO R0 1--

- *

  • 6. 5 6 2 -CS CL-3 9 - PEB "

005200 N2K B-D Li-OL LT-PEM-400VO R0 C MAIN RECIRC IN NCZ B3.90 177-453 UT-PBM-400VO R0 X---

1 DW, IL 164-0,330 AZ Li 6*S UT-PBM-400VO R3 X---

" 6. 5 6 2 -CS CL-3 9 - PEB "

005400 NES B-D ITT-CL UT-PBM-300VO RD C - --

JET POMP INSTR N0ZZ 83.90 UT-455 tTT-PBM-3 00VO RD E---

DW, EL 160-0, 285 AZ Li 605 UT-PEM-300VO R0 X---

  • 6. 5 6 2 - CS CL-3 9 - PEB "

a b

  • e DATE: 01/04/95 PEACN BOTTOM ATOMIC POWER STATION UN2 i 2 PAGE:

5 RE"f2810N :

2 INSERVICE INSPECTION SLHMARY SECOND INTERVAL. THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 1 CFAUSP STATUS CCMPONENTS PEAT"*0R PPESSUPI VESSEL NR R

ASME S OEGB SEC. XI T RCEP

SUMMARY

EXAMINATION AREA CATGY EXAM A EOOO REMARKS NUMBER IDIDrTIFICATION ITEM NO METHOD PROCEDURE T CRMR *

  • CALIBRATION BLOCK

NO!ZLE INSIDR RAD. S Et"" ION (PEF. DWG. NO. ISI-2-RV-01) 005600 N33-IRS B-D ZONS 1 UT-PBM-401VO RD C X---

CALIBRATICN BLOCK TCKAI2/FCKUSHIMA6 WAS MAIN STEAM NOZZLE B3.100 ZONE 2A UT-PBM-401VD R0 X-.-

USED.

DW, EL 200-0, 305 AZ ZONE 1 UT-PSM-311VO RD X---

DW, EL 200-0, 105 AZ ZONE 2A UT-PBM-311VO R0 X---

005700 N3C-IRS B-D ZONE 1 UT-PBM-401V0 R0 C X---

CALIBRATICN BLOCK *:";KAI2/FLTJSHIMA6 WA0 MAIN STEAM NOZZLE B3.100 ZONE 2A UT-PBM-401VO R0 X--*

USED.

DW, EL 200-0, 250 AZ ZONE 1 UT-PBM-311VO R0 X-.*

DW, EL 200-0, 250 AZ ZONE 2A UT-PBM-311VO R0 X..-

005900 N4A-IRS B-D ZONS 1 UT-PBM-401VO R0 C 1---

CALIBRATICN BLOCK TCKA12/FLTJSHIMA6 WAS FRECWATER NCZZLE B3.100 ZONE 2A tTT-PBM-401VO R0 X---

USED.

DW, EL 186-0, 3 0 AZ ZONE 1 UT-PBM-311VO R0 X*--

DW, EL 186-0, 30 AZ ZONE 2A UT-PBM-311VO R0 2---

005950 N4A-IRS N/A ZONE 1 UT-PBM-401VO R0 A X-.-

CALIBRATICN BIDCK TCKAI2/FD"JSHIMA6 WAS FEEDWATER N0ZZLE N/A ZONE 2A UT-PBM-401VC RO X---

USED.

DW, EL 186-0, 30 AZ ZONE 1 UT-PBM-311V0 R0 X---

DW, EL 186-0, 30 AZ ZCNE 2A UT-PBM-311VD R0 X---

006000 N48-IRS B-D ZONE 1 UT-PBM-401V0 AD C X---

CALIBRATION BLOCK 70KA!2 /TD" 75HIMA6 WAS FEE 0 WATER N0ZZLE B3.100 ZCNE 2A UT-PSM-401VO R0 X---

USED.

DW, EL 186-0 90 AZ ZCNE 1 UT-PBM-311VO R0 X---

DW, EL 186-0, 90 AZ ZCNE 2A ITT-PBM-311VO R0 X- --

006050 N43 IRS N/A ZONE 1 UT-PBM-401VO R0 A X-CALIBRATION B14CK TCKAI2/F*TJSHIMA6 WAS FEE 0 WATER N0ZZLE N/A ZONE 2A UT-PBM-401VO RO I- - - USED.

DW, 185 0, 90 AZ ZONE 1 UT-PBM-211VD R0 2-*-

l DW, its-0, 90 AZ ZONE 2A UT-PBM-311VD RD X-

-+

l l

006100 N4C-IRS B-D 2CNE 1 UT-PBM-401V0 RC C X---

CALIBRATICN BIACK TCKL12/Fn7JSHIMA4 WAS FEEDWATER NOZZLE B3.100 ZONE 2 A UT-PBM-401VD R0 X---

USED.

DW, EL 186-0, 150 AZ ZONE 1 UT-PBM 311VD R0 X-

+

l 1

l

~.

~.

l DATE: 01/04/35 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 PAGE:

6' RE'JISION:

2 INSERVI B INSPECTION

SUMMARY

SECOND INTERVAL THIRD PERIOD, FIRST OUTAGE (94RF)

CIASS 1 CFACEP STATUS COMP 0h1NTS TEA 0 TOP PRESS 71tB VESSEL NR R

A9ME S 0EGB SEC. XI T RCEP

SUMMARY

EE. AMINATION AREA CATGY EXAM A B C 0 0' REMARKS WUMBER IDENTIFICATION ITEM NO MEDICD PROCEDURE T CRMR ** CALIBRATION BibCK**

N0ZZLE TNSIDE RAD SB0"McN (REF. DWG. No. ISI-2-R7-01) 006150 N4C-IRS N/A ZONE 1 UT PBMat01VO R0 A X---

CALIBRATION BLOCK TOKAI2/F;KUSHIMA6 WAS-FERDWATER N0ZZLE N/A 2CNE 2A ITT-PBM-401VO R0 X---

USED.

DW, BL 186-0, 150 A2 -

SONE 1 UT-PBM-311VO R0

.X---

006300 N4D-IRS B-D ECNE 1 UT-PBM-401VO R0 C X---

CALIBRATION BLOCK TOKAI2/FUKUSHIMA6 WAS FREDWATER N0Z3LE B3.100 ZONE 2A UT-PBM 401VO RO X-

- USED.

DW, BL 186-0, 210 A2 ZONE 1 UT-PBM 311VO 10 X---

DW, IL 186-0, 210 AZ ECNE 2A UT-PBM-311VD RD 1---

006250 N4D-IRS N/A ECNE 1 UT-PBM-401VO R0 A X---

CALIBRATION BLOCK TOKAI2/F;KUSHIMA6 WAS FEEDWATER N0ZZLE N/A ZONE 2A UT-PBM-401V0 R0 X---

USED.

DW, EL 186-0, 210 AZ ZONE 1 UT-PBM-311VO RO X---

DW, EL 196-0, 210 A2 ZONE 2A UT-PBM-311VO R0 X

006300 N45-IRS B-D ECNE 1 UT PBM-401VO R0 C X=--

CALIBRATION BLOCK 70KAI2/F:KUSHIMA6 NAS FREDWATER NOEZLE-B3.100 ZONE 2A UT-PBM-401VO R0-X---

USED.

DW, EL 146-0, 270 AZ ECNE 1 UT-PBM-311VO R0 X-**

DW, EL 186-0, 270 A1 20NE 2A UT-PBM-311VO R0 X***

1 006350 N45-IRS N/A ZONE 1 UT-PSM-401VO R0 A X---

CALIBRATION BLOCK TOKAI2/F*."KUSHIMA6 WAS FEEDWATER N0ZZLE N/A ZONE 2A UT-PBM-401VO RD Z---

USED.

DW, EL 186-0, 270 AZ ZONE 1 UT-PBM-311VO R0 X---

DW, EL 186-0, 270 AZ EONE 2A UT-PBM-211VO R0 X***

006400 N4F-IRS B-D ZONE 1 UT-PBM-401VO RD C X---

CALIBRATICN BLOCK TOKAI2/F*T.*SHIMA6 WAS FEE 0 WATER NCZZLE 32.100 ZONE 2A UT-PBM-401VO RC X---

USED.

DW, EL 186 0, 33 0 AZ ZONE 1 UT-PBM 311VO R0 X---

DW, EL 186-0, 330 AZ ZONE 2A UT-PBM-311VO R0 X

006450 N4P-IRS N/A ZONE 1 UT-PBM-401VD R0 A X---

CALIBRATION B14CK TCKAI2/FOKUSHIMA6 WAS FERDWATER NO22LE N/A 20NE 2A UT-PBM-401VD R0 X---

USED.

DW, IL 186-0, 330 A2 ZONE 1 UT PBM-311VO R0 X---

DW, EL 186-0, 330 AZ ZONE 2A UT-PBM-311VO R0 X---

i r

l l

.,s

[

  • e l

e l

l l

l i

DATE: 01/04/95 PEAC31 BOTTCm ATOMIC POWER STATION UNIT 2 PAGE:

7 REVISION:

2 INSERVICE INSPECTION SCMMARY l

SECOND INTERVAL. THIRD PERIOD, FIRST Ot>TAGE (94RF)

CLASS 1 CFAUEP STATUS COMPONENTS REAt"*CR PRESSURE VESSEL l

Na R

ASME s oEGE SEC. II T RCEP

SUMMARY

EXAMINATION AREA CATGY EXAM A EoOO REMARKS i

NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE T CRMR ** CALIBRATION BICCK**

l l

I NO2!LE INSIDE RAD. set

  • MON (PEF. DWG. NO. ISI-2-RV-01) l caQ550 N9. IRS B-D ZONE 1 UT-PBM-311VO R0 C X..-

CALIBRATION BLOCK TCKAI2/FCKUSHIMA6 WAS l

CRD NCZZLE B3.100 ZONE 2A tTT-PBM-311VO RD X---

USED.

i DW, EL 186-0, 140 AZ I

i 006800 N13-IRS B-D ZONE 1 tTT-PBM-311VO R0 C X.==

CALIBRATICN BIDCK TOFAI2/FD"JSHIMA6 WAS l

i l

MAIN RECIRC OtTT HCZ B3.100 ZONE 2A ITT-PBM-311VD R0 X---

USED.

DW, EL 161-0, 180 AZ 007500 N2G IRS B-D ZONE 1 ITT-PBM-401VO R0 C I-

- CALIBRATICN BICCK TOFAI2/FD"J3HIMA6 WAS MAIN RECIRC IN NO2 83.100 ZONE 2A tTT-PBM-401VO RO I-.*

USED.

DW, EL 164-0, 240 AZ ZONE 1 UT-PBM-311VO s10 X---

DW, EL 164-0, 240 AZ ZONE 2A UT-PBM-311VD RO I-l 007650 N2J-IRS BD ZCNE 1 tTI-PBM-4 01VO RO C X.--

CALIBRATICN B!bCK TOKAI2/FD7JSHIMA6 WAS MAIN RECIRC IN NOZ B3.100 ECNE 2A UT-PBM-401VD R0 X*+-

USED.

DW, EL 164-0, 300 AZ 007700 N2K IRS B-D 2CNE 1 UT-PBM-401VO R0 C X..-

CALIBRATICN BICCK TOKAI2/FD"JSHIMA6 WAS MAIN RECIRC IN N0Z 83.100 ZCNE 2A TTT-PBM-401VO R0 X-.*

USED.

DW, EL 164-0, 330 AZ l

007900 N8B-IRS B-D ZONE 1 UT-PBM-311VD RD C X---

CALIBRATICN BLOCK 70VA!2/FD7JSHIMAf WAS JET PUMP INSTR NOZZ B3.100 ZONE 2A UT-PBM-211VO RO I-USED.

DW, EL 160-0, 285 AZ r

I TMPEADS IN FIANOR (PEF.

  • WO. NO. ISI-2 M -P'
  • 2 '

00t000 STUDS 1-92 (THREADS)

E-C-1 tTI- 0 UT-PS-00tV3 R0 C 1---

LIMITED EXAM TO 92% CF CO:3 REQUIRED THREADS IN FIANGE B6.40 VCLUME DUE To FLAN 33 SEAL *N3 SURFACI FF, EL 210-4, RX CAV CONFIGURATICN. EXAMINED AT STUD FF, EL 210-4, RX CAV LOCATIONS 89 TO 1 T'2 26.

    • 6-1-8.CS-48-PEB**

l i

1

\\

e.

e.

DATES 01/04/95 PEAC3t BC"'TCM ATOMIC POWER STATION UNIT 2 PAGE:

8 REVISION:

2 INSERVICE INSPECTION SOMMARY SMCCND INTERVAL, THIRD PERIOD, FIRST OUTAGE (94RF)

CIASS 1 CFACEP STATUS COMPCNENTS i

REASR PRESSUPB VESSEL NR R

ASME 8 0BGE SEC. XI T RCEP j

SUMMARY

EXAMINATION AREA CATGY EXAM A EOOO REMARKS NUMBER IDENTIFICATION ITEM NO METHCD PROCEDURE T CRMR **CALIBRATICN BIACX**

IFT A-""rM & COPE SUP"' 57U (REF. DWG. NO. IS!-203-RV-06)

(

008400 DMDB-3 B-N-2 VT-3 MAG-CG-407 R2 C

X---

l DRYER HOID-DOWN BRKT B13.21 FF, CLSR HEAD AZ 221 I

l l

I 008500 DHDB-4 B N-2 VT-3 MAG-CG-407 R2 C

1---

DRYER HOLD-DOWN BRKT B13.21 FF,CI.SR HEAD,318 AZ l

i i

l CIPC"*FEFENTIAL WELDS f*EP. CWG. NO. ISI-2 RV-01%

l l

028600 CH+C-1 B-A UT-0 UT-PBM-300VO R0 C

-X--

(UT-0) e SPCT INDICATIONS: (OT-458) 2 DOLLAR PLATE WELD B1.21 UT-458 UT-PBM-300VO R0

.XX-SPOT INDICA *ICNS, 2 INSIDE GEOMETRY; FF,C:4SURE HEAD UT-603 UT-PBM 300VO R0

-X--

(UT-408) 2 8"BSURFACE PLANAR FLAWS. ALL FF,CLCSURE HEAD INDICATICNS WERE CE* ERMINED TO BE CODE ACCEPTABLE.

l

    • 4.5-CS-47-PEBe*

l 004700 CH-C-2 B-A MT MT-PE-001 R2 C

X---

EXAMINED WE* D LENGTH FROM 24: DEG 70 360 i

HEAD TO FLANJE B1.40 UT-0 UT-PBM 300VO R0 X---

DEG.

FF, CLCSURE HEAD UT-453 UT PBM 300VO R0

-*I-FF, CLOSURE HEAD UT-6*S Ur-PBM-300VO RO X---

    • 4.5-CS-47-PEB**

t 1

i MEPTOICNAL WELCS (PIF rW2 C.

ISI-2-PV-011 1

009200 CH-ME BA U"-C UT-PSM 300VO RD C X---

)

AT 240 CEG.

B1.22 CT-453 UT-PBM-300VO R0

--X-l FF, CLCSURE HEAD UT-6:3 UT-PBM-300VO RC X- --

    • 4.5-CS-47-PEB**

i l

NEAD To NoZZ*.E WELDS (PEP. DWG. No. IS!-2-PV-91%

j.

009600 CH-NC B-D UT-0 UT-PBM-300VO RD C X---

NO:ZLE N6B B3.90 UT-453 UT PSM-300VO RD

--X-FF, CLCSURE HEAD UT 6CS UT-PBM-300VO R0

+-X-

    • 4.5-CS-47-PEB**

i i

i l

i i

l 1

..a..-

. ~.. - ~ -

-. ~.

. -....~ -.-.-.~

.-,.m u.

l i

I DATE:. 01/04/95 PRACH Bw W ATOMIC PONER STATION UNIT 2 PAGE:

9 REVISION:

2 INSERVICE INSPFCTION

SUMMARY

SECOND INTERVAL. THIRD PERIOD, FIRST OUTAGE (94RF)

CIASS 1 CFAUBP STATUS COMPCNENTS REACTOR PRESSURE VES83L NR R

ASME 8 OEGE.

SEC. XI T RCEP i

SUMMARY

EXAMINATION AREA CATGY EKAM A B000 REMARKS MUMBER IDENTIFICATION ITEM NO METHOD PROCEDtm3 T CRMR ** CALIBRATION BLOCK **

N0ZZLR INSIDE RAD. SEC'"'CN (SEF. DNG. NO. TSI-2-RV-01) 009900 CH-NC-IRS B-D 20NE 1 UT-79N-711VD R0 C. X---

l N02 ELE N6B B3,100 ECNE 2A UT-P9N-311VD 10 K-l

_ FF. CLOSURE HEAD

    • 4.5-CS-40-PER**

I i

1 N0ZZLE-To-FIANGE WELDS ' PEF, DNG. NO. 13f-2 97-01) 010500 -N-C-1FE 5-G-2 VT 1 MAG-03-407 R2 C

X*--

N6B FLANGE BOLTING 57.50 FF, CIASURE HEAD i

i I

4--

t=v f

.T-9 9

-,yt m

m..p94--p e.-.r--.,.g--.i.e...

we r--

p.img.g' gg.i.4.-g..--i,

'-s 3

W$ mg-r

  • e I

DATE: 01/04/95 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 PAGE:

10 REVISIONt 2

INSERVICE INSPECTION SLHMARY SECCND 1.WERVAL. THIRD PERIOD, FIRST OUTAGE (94RF)

CLASS 1 CFAUEP STATUS COMPCNENTS CLOSLTE HEAD-PEA T R PPES$UPE VESSEL NR R

ASME 8 CEGB EEC. II T RCEP

SUMMARY

EXAMINATION AREA CATGY EXAM A EOOO REMARKS NUMBER IDENTIFICATION ITEM No METHCD PROCEDURE 7 CRMR ** CALIBRATION BICCK

FE C TM!tVNESS t

030400 CF.1 THICKNESS INFORMATICN ONLY LT.0 INFO CNLY C

RPV MEAD THICKNESS FF, CLCSL1tB HEAD

    • 4.5-CS.47.PEB'*

I I

1 l

I l

l l

i I

l

l

[

l I

i DATE: 01/04/95 PEACH BCTTCM ATOMIC POWER STATION UNIT 2 PAGE:

11 REVISION:

2 INSERVICE INSPEC"rION

SUMMARY

SECCND INTERVE, THIRD PERIOD, FIRST OUTAGE (94RF)

CIASS 1 CFAUIP STATUS COMPCNENTS PEA?"OR PPESS"PB VESSEL l

NR R

r ASME S OEGE l

SEC. KI T RCBP l

[

SUMMARY

EXAMINATION ARIA CATGY EXAM A EOOO REMARKS l

NUMBER IDEN*IFICATION ITEM No METHCD PROCEDURE T CRNR **CALIBRATICN ELOCK" POLTING (PSP. DWG. No ISI-203-PV-02)

(

010700 STUDS 1-92 (INP! ACE)

B-G-1 UT-0 UT-PBM-007V5 R0 C X--.

THE FOL14 WING CALIBRATICN BLCCKS WERS CH STUDS IN PLACE BE.20 USED: CLCSORE STLO L. L/2 6 L/8, 3L/4, FF, CLOSURE HEAD L/4. CTS 49 To i TD 2 4, 27 6 24 hSRS FF, C:4SURE HEAD EXAMINED.

I

    • LIMERICK CAL BLCCF.**

l l

010715 STUDS 1-93 (REMOVED)

B-G-1 UT-0 tTF-PBH-007V5 R0 C X-..

TMS FOLI4 WING LGS CEIR9AT!*N BLCCYJ i

CH STUDS WHEN REMOVED B6.30 WERE USED: C14SURE STUD L, L/2 & L/8, FF, CLCSURE HEAD 3L/4, L/4. 8%OS 21, 22,

  • 3, AND 24

]

FF, CLCSURE HEAD WERE EXAMINED. S M S WERE EXAMINED IN i

r l

PIACE IN CCNJUNCTICN WITH CTHER STLO EXAMS. THE MT EXAM MAS PERFORMED DURING

[

A PREVIOUS Ct?TAGE.

  • .LIMERIm CE BLCCK.*

l 010800 STUDS 1-92 (NtfTS)

B-G-1 177 - 0 UT-PE-009 R1 C

X-

. USED A 10 MRI SEARCH UNIT. NITIS 62 THRU CH NLOS BE.10 92 CW WERE EXAMINED.

FF, CLOSURE HEAD

  • 4. 5 8 -CS -2 2 - PE3 "

010900 STUDS 1-92 (SM WSHR)

B-G-1 VT 1 MAG-CG-407 R2 C

X..-

SuLL WASHERS #32 TKitU #2 5 AND #67 THRU CH WASHERS,SMALL B6.50 492 WERE EZAMINED.

FF; ClaSURE HEAD C11000 STLOS 1-92 (LG WSHR)

B-G-1 YT-1 MAG-CG-407 R2 C

X+.-

IARGE WASFERS #32 'DGLU #3 5 A.ND #6* THRU CH WASHERS, LARGE B6.50 892 WEP,E ETAMINEO.

FF, CLCSURE HEAD

)

(PEF CWG. No. TSI-20?-PV 211 011110 INCORE DRYTUBE 37-32 N/A VT-1 MAG-CG-408 R3 A

X-**

EXAMINED IM 2D AF IR REMC7M FRCM CCRE.

IRM INCORE DRY TUBE N/A IRM WAS REPLACED.

FF, IM*ISSEL

.. ~-

5 e

DATE: 01/04/95 PEACH BCT"CM ATOMIC PONER STATION tsNIT 2 PAGE:

12 RE'f3SION:

2 INSERVICE INSPECTION

SUMMARY

a SECOND INTERVAL, THIRD PERIOD, FIRST CUIAGE (94RF)

CLASS 1 CFACEP STATUS COMPONENTS PEAT *)R PPESS"PE VESSEL NR R

ASME S OEGE SEC II T R C E F-

SUMMARY

EXAMINATION AREA CATGY EXAM A BC00 REMARKS i

?

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE 7 CRMR **CALIBRATICN BloCY.**

j 1

CPD f*0USINGS fREF. CWG. NO. ISI-203-RV-03) 6 i

CSM05 CRD HOUSING BCLTING B-G-2 VT-1 MAG-CG-407 R2 C

.Z..

EXAMINED BCLTING FROM THE FOL14 WING FIJLNGE BOLTING B7.80 CELLS: 02-39; 10-23; 14-51; 10-31:

DW, S*;B-PILE ROOM 10-43; 22-I3 22-35; 22 55: 30-51; j

DW, SL*B-PILE ROOM 34-15; 34-27: 42-31; 50-31; 50-15;

)

50-39: 54-I3.

JET P**P NO 2 (PEP. CWG. NO. ISI-203-PV-14.15' i

c11254 JP802 ALL COMPONEN"3 5-N 1 VT-3 MAG-CG-400 RS C

X...

B13.10 FF,IF.*ESSEL,142.5 A2 I

JET PWP NO 2 (PEF. CW3. NO. ISI-203-RV-14) 011255 JP#02 BRACE ARM /VESS B-N-2 VT-1 MAG-CG-408 R3 C

I...

B13.20 FF,IF,*ESSEL,142.5 AZ JET F"*'P MO 3 (PEF. CW3 No. ISI-203-PV-14_151 1

i 011256 JPs03 ALL COMPCNENIS B-N-1 VT-3 MAG-CG-408 R3 C

  • X..

RESTRAINER WEDGE MISALIGNED. ACCEPTABLE B13.10 PER AR #A:st3009.

FF,IWESSEL,127. 5 AZ JE' P**P N3 3 fPEF. CWG No. !51-203-77-141 011257 JPSO3 BRACE ARM /YESS B-N-2 VT-1 MAG-CG-408 R3 C

313.20 FF,IF,*ESSEL,127.5 AI JET P"uP No 4 iPEF. tW1 NO. ISI-203-PV-14.15%

011258 JPSO4 ALL COMPONENTS B N-1

  • *I-3 MA3-CG-408 R3 C

1..

RESTRAINER WEDGE KAS MISAL*3NED, v

B13.10 ACCEPTABLE TER AR #A04t3009.

FF,1NVESSEL,112.5 AZ

DJCE: 01/04/95 PEACH BOT 7.,M ATOMIC PowBR STATION 11 NIT 2 PAGE:

13 REVISION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAI., THIRD PERIOD, FIRST CUTAGE (94RF)

CLA.SS 1 CFAUEP STATUS COMPCNENTS FEACTOR PPESSURE VESSEL NR R

ASMS S 0EGB SEC. XI T RCEP

SUMMARY

EXAMINATION AREA CATGY EXAM A EOOO REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION BIDCF.**

JET Pt9P NO 4 (PEP. DWG. No. TSI-203-FV-14) 011359 JP#04 BRACE ARM /VESS B-N-2 VT-1 MAG-CG-400 R3 C

X---

B13.20 FF.Ib"lESSEL,112.5 AZ E t*P No 5 (PEP CW3. No. !SI-203-PV-14,151 011260 JP#05 AI.L COMPCNENTS B-N-1 W-3 MAG-CG-408 R3 C

X...

B13.10 FF,IF/ESSEL,97.5 AZ, JET Pt*P NO ! (P EF. CW3 NO. TSI-203-PV-14) 011261 JP905 BRACE ARM /VESS B-N-2 VT-1 MAG-CG-400 R3 C

X---

B13.20 FF,IFIESSEL,97.5 AB.

JET PtwP No 6 fpFF-CWG. No. TSI-203-PV-14.151 011262 JP#06 ALL COMPONENTS B-N-1 VT-3 MAG-CG-408 R3 C

-X-

- RESTRAINER WEDGE MI1ALIGNZ:. ACCE P~AB LE B13.10 FER AR #A0433009.

FF,IF/ESSEL.82.5 AZ.

JET Pt*P NO 6 ' PEF. t 43 NO. ISI-203-RV-141 1

011263 JPs06 EPACE ARM /VESS B-N-2 VT-1 MAG-CG-400 R3 C

1-. -

B13.20 FF, IF.*ESSEL,8 2. 5 A2.

JET Pt*P NO i (PEF. C'4G MC. 151-201-97-14,165 011864 JP907 ALL COMPONENTS B-N-1 VT-3 MAG-CO-408 R3 C

..-X RES17.AINER WEDGE MISALIGNEO. ACCEPTABLE B13.10 PER AR #A;tt3009. A RES"7.A*NER TACK t

l FF,IF/ESSEL,67.5 AZ.

WELD ON THE SMROUD 1*05 KAS FDUND FF,IF/ESSEL,67.5 A3.

CRAcrJD.

  • EE RFV SIOE TA"Y. WELD WAS FOUND ACCEPTABLE. CONDITION FOUND ACCEPTABLE PER AR sa:St2le:

)

i I

1

e e

CATE: 01/04/95 PEACH BOTTOM ATOMIC POWER STATICH UNIT 2 PAGE:

14 REVISION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL. THIRD PERIOD, FIRST OUTAGE (94RF)

CLASS 1 CFACEP STATUS COMPONENTS PEAC*0R PRESSL*PS VESSEL NR R

ASME S OEGE SEC. II T RCEP

SUMMARY

EXAMINATION AREA CATGY EXAM A EC00 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE T CRMM ** CALIBRATION BLOCK'*

1 JET PtMP NO 7 IFEF. CWG. NO. ISI-203-RV-14)

I 011265 JP#07 BRACE ARM /VESS B-N-2 VT-1 MAG-CG-408 R3 C X - -- -

813,20 FF,IETSSEL,67.5 AZ.

1 i

JET P"MP NO e f REF. tWG. NO. ISI-203-RV-14.161 l

l 011266 JP#Cs ALL CCMPCNENTS B-N-1 VT-3 MAG-CG-408 R3 C

X---

B13.10 I

FF,IE*ESSEL,52.5 AZ.

JET P"*tP NO 9 ORP. CW3. NO. !ST-203-PV-141 011247 JP#04 BRACE ARM /VESS B-N-2 TT-1 MAG-CG-408 R3 C

X---

i B13.20 i

FF,IE*ESSEL,52.5 AZ.

1 JET P"*'P NO 9 fPEF. PM NO. I S T - 2 0 3 -R*.*-14 151 011268 JP#09 ALL COMPCNENTS B N-1 VT-3 KAG-CG-408 R3 C

X---

J B13.10 FF,IF/ESSEL,37.5 A3.

1 JET P *P NO 9 fREF. OWS. NO. IS!-203-PV-141 i

i 011269 JP409 BRACE APJ1/VESS B-N 2

  • "I-1 MAG-CG-404 R3 C

X---

B13.20 FF,IE*ESSEL,37.5 AZ.

l JE* F*.N P NO 10 f t EF

  • M NO T S!- 2 03 -F**-14.15 '

l l

011270 JP#10 ALL COMPCNENTS B-N-1 VI-2 MAG-CG-400 R3 C

X---

B13.10 FF,Im*ESSEL,22.5 A3.

I i

l l

Ih*

L l

DATE: 01/04/95 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 PAGE:

15 REVISION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST OUTAGE (94RF)

CLASS 1 CFAUEP STATUS COMP 0NEh"f8 j

REACTOR PPBSSUPE YESSEL NR R

\\

ASMB

$ 0EGB SEC XI T RCEP CUMMARY EXAMINATION AREA CATGY EXAM A BC00 REMARKS l

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR **CALIBRATICN F14C3t**

I JET F*JMP No 10 (PEF. OWG. No. ISI-203-RV-14) 4 011271 JP#10 BRACE ARM /VESS B-N-2 VT-1 MAG-CG-408 R3 C

X---

B13.20 FF,IWESSEL,22.5 AZ.

fptF. CWG. NO. NONE) 011293 STM DTR DRN CHNL WLD N/A VT 1 MAG-CG-408 R3 A

X---

g DRAIN CHANNEL WELDS N/A FF IW,*ISSEL l

i P

INTEPTOP (P RF. DW. NO ISI-203-PV-16) 011294 SHROUD ANNULUS AREA B-N-1 VT-3 MAG-CG-400 R3 C

X---

EXAM' ACCESS. AREAS RETGEN JP #2 TO JP x

B13.10

  1. 10 INCLUSIVE, EXCEPT FOR THE POLLCWING FF, IF,*ESSEL AREAS: BAFFLB PLATE AND ADCACENT WEI.DS a

l FF, IN",*ESS EL (H8&H9) A" JP# ' S 2, 4, 5, AND 6.

LIMITATIONS DUE TD OEBRIS CN BAFFLE P'. ATE.

REA C R PPESSUPB VESSEL (PEF. DWG. No. ISI-203-PV-16) 011295 SHRD SCP PLATE WELD B N-2 VT-1 MAG-CG 408 R3 C

X-EXAMINED A00ESSIBLE PCRTIONS BETWEEN B13.21 JPs2 TO Ji310 INC*!sIVE WI""X THE FF,1WESSEL EXCEPTION OF THE 7:LZ WING AREAS: WILD FF,I WESSEL A; JP#2, 4,

5, AN; 4 DUE !; OEERIS ON BAFFLE PIA"E.

IN*EP!!R IP EF. CWG. NO ISI-201-PV-201 011297 ACCESS HATCH COVERS B-N-1 VT.1 MAG-CG-408 R3 C

X---

VT 1 EXAM WAS PERF:MED CN "ME O CEG AMC 0 & 180 AIIM*JrH MANHCLE COVERS B13.10 CNLY IN LII"! CF THE PADIA*. TT SCAN.

FF. IWESSEL,0&tt0 AZ p

011298 ACCESS HATCH COVERS N/A VI-453 ITI-PBM-211VO R0 A

    • X*

ALL SCANS FOR CIRC JJC RAOIM CRACY.ING 0 & 180 AZIM*JTH MANHCLE COVERS N/A UT-6CRL UT-FBM-211VD R0 X-WERE PERFORMED EXCEPT FOR 7-3 0 DEG AHC.

FF,1NVESSEL,06180 AZ THE CIRC SOAN FCR *E ICTION OF RAOIAI, FF,INVESSEL,0&l80 AZ CRACKING WAS NOT PERFORME. A VT-1 EXAM WAS PERPCMED OF THE AFFEt"*ED AREA CN THE O DEG AMC.

    • $ NO.

4**

)

4 5

.... ~.

R l

I b'

DATE '. 01/04/95 PEACH BOTTOM A3tMIC POWER STATION IfNIT 2 PAGE:

16 REUZSION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST OT7FAGE (94RF)

C1 ASS 1 CFAUIP STATUS COMPCNENTS',

REACTOR PRESSUtB VISSEL r

NR R

ASME S OEGE SEC, XI T RCEP i

SUMMARY

EXAMINATION AREA t CATGY EXAM

-ABC00 REMARKS

' f NUMBER ID8NTIFICATION ITEM NO MEIMOD PROCEDURE T CRMR ** CALIBRATION Bl4CK'*

CORE SPRAY SPARGERS (REF. DtfG. NO, ISI-203-RV-09,00) r 011300 CS SPARGER 120A2 3-N-1 VT-1 MAG-CG-400 R3 C

Z-*-

B13.10 FF,Ih*lESSEL,120 A2 5

011400 CS SPARGER 240A2' B-N-1 VT-l' MAG-CG-400 R3 - C K-..

f 313.10 FF,IFIESSEL,240 AE l

CCRE SPRAY HEADER (REF. OWG. NO. ISI-2 03 -R*/-07 %

I 011500 CS MEADER 120A2-B-N-1 '

VT-1 MAG-CG-400 R3-C X---

r l-B13.10 FF,IFTESSEL,120 A2 1

011600 CS HEA0ER 240A2 B.N-1 VT.1 MAG.CG-408 R3~ C X---

B13.10 FF.1FIESSEL,240 AZ I

CCRE SPPM SPARGERS (DIF. DWG. NO. ISI-203-77-015 i

011630 CS DCWNCOMERS 120A2 B-N-1 VT-1 MAG-CG-404 R3 C

B13.10 FF,IFIISSEL,120 A2 011650 CS DCWNCCMERS 240AZ B.N-1 VT-1 MAG-CG-408 R3' C

X.--

l 813.10 FF,IF/ESSEL,240 A2 CORE SPPM HEADER (REF. !W3. NO. IST-203 R7-23)

F 011664 CS ICR SK! NLD 165A2 B - P'

  • VT-1 MAG-CG-400 R3 C

X---

l B.

FF,IFIESSEL,165 A2 l

l l

E s

3 y--,-.-

y.

m,-

c

.3 e

e.

e p

n,-.*

4+r y

.,.4 l

DATE: 01/04/95 PEACH BOTTOM ATOMIC POWER STATION LHIT 2 PAGE:

17 REVISION:

2 INSERVICE INSPEC" TION St'MMARY SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF) j CLASS 1 CFAURP STATUS CCMPONENTS REACTOR PRESSUPB VESSEL NR R

4 ASME S 0EGE SEC. XI T RCEP

SUMMARY

KIAMINATION AREA CATGY EXAM A EOOO RJLW NUMBER IDENTIFICATION ITEM NO METHCD PROCEDURE T CRMR ** CALIBRATION BLOCK "

i I

i COPE SPRAY FRADFR (PEF. DWG, No, ISI-203-RV-23) 011666 CS ER BKT WLO 117AZ B-N-2 VT-1 MAG-CG-40s R3 C

X---

B13.21 FF,IF/ESSEL,117 AZ l

011668 CS CR BKT WLD 123AZ B N-2 VT-1 MAG-CG-40s R3 C

X-813.21 FF,IFIESSEL,123 AZ 1

l 011070 CS CR BKT WLD 195AZ B N-2 VT-1 MAG-CG-400 R3 C

X...

j B13.21 FF,INVESSEL,195 AZ l

011674 CS ER BKT WLD 345AZ B N-2 VT-1 MAG-CG-40s R3 C

X---

813.21 FF,IF/ESSEL,345 AZ 011676 CS CR BKT WLD 237AZ B-N-2 VT-1 MAG-CG-408 R3 C

X---

B13.21 FF,ITIESSEL,237 AZ 011678 CS CR BKT WLD 243AZ B-N-2 VT-1 6AG-CG-400 R3 C

X---

813.21 FF,I2.~iESSEL,2 43 AZ fPEF. CWG. No. ISI-203-R7-231 011801 TB::X F CVR WLD 120 N/A VT-1 MAG-CG-400 R3 A

X-..

N/A FF,IFIRSSEL,120 AZ 011802 TBOX F C'/R WLD 240 N/A VT-1 MAG-CG-408 R3 A

X---

N/A i

FF,IF/ESSEL,240 AZ i

i

i

  • o i

I DATE: 01/04/95 PEACH BC O M ATOMIC POWER STATION UNIT 2 PAGE:

18 REVIDION:

2 INSER7!CE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST OtTAGE (94RF)

CLASS 1 CFACEP STATUS COMPONEhTS PEAL"*0R PPR?S"RE VESM L NR R

ASME S 0EGE SEC. XI T RCEP I

SUMMARY

EXAMINATIOW AREA CATGY EXAM l.

EOOO REMARKS WUMBER IDEFTIFICATION ITEM No METHOD PROCEDURE T CRMR ** CALIBRATION BLOCK'*

(REF. CWG. No. IS!-203-tv-23%

0$1603 TBOX THERN SLV 120 N/A VT-1 MAG-CG-400 R3 A

I-.-

I N/A FF IF.*ESSEL.120 AZ l

011804 TECX THERM SLV 240 N/A VT-1 MAG-CG-408 R3 A

X...

N/A FF. IF.*ESSEL,2 4 0 AZ TOP C"PB OUIDE (PEF. TwG. No ISI-203-PV-len l

018900 TOP CORE GUIDE B-N-1 VT-3 MAG-CG-400 R3 C

I---

EXAMINED ErrIRE TOP CORE G****B.

ALS3 B13.10 EXAMINED 4 CELL 1,0 CATIONS FIA SIL 554:

FF.IF*ESSEL CELL 48 41; s.25; 24 17; 24-25.

SHP0t*D f7EF. DW3. NO. T SI - 2 0? -PV-19 )

011950 TOP OF SHROUD AREA B-N-1 V;-3 MAG-CG.40s R3 C

X*--

B13.10 FF,IF.*ESSEL STEAw CPYEP SUPPCPT fv* 'P EP rWG. NO. T SI-2

  • 3 - P*.*-10 )

011952 DRYER RKT NLD 4AT.

B-N-2

  • 7-3 MAG-CG-406 R3 C

1---

813.21 FF,IF;ESSEL,4 AZ 011050 DRYER EF'T NLD 94A2 B-N 2

  • 7 - 3 MAG-CG-408 R3 C

X---

B13.21 FF IF.*ESSEL,94 AZ 011D56 DRYER BstT WLD it4A2 B-N-2

  • 7-3 MAG-CG-40E AJ C

X---

813.21 FF,IF.*ESSEL,184 AZ

s e

i i

I 1

DATE: 01/04/95 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 PAGE 19 l

l RE"3SION:

2 INSER7 ICE INSPECTION

SUMMARY

i SECOND INTER 7AL, THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 1 CFAUEP STATUS COMPONENTS j

7,,3ACOR PRES $"PE VESSEL l

NR R

ASME

$ 0EGE I

l SEC. XI T RCEP

SUMMARY

EXAMINATION AREA CATGY EKAM A EoOO REMARKS j

NUMEER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRHR " CALIBRATION BLOCKH j

I i

STEAM DRYER SUPPORT PVT f7EP. DW3 No. ISI-203-FV-10) i i

011958 DRYER BKT NLD 274A2 B-N-2 W-3 RAG-CG-408 R3 C

X*--

213.21

{

FF,IF'ESSEL,274 A2 l

j i

l 011940 CRYER SUP BKT 4A2 B-N-1 W3 MAG-CG-400 R3 C

X---

B13.10 FF,IFIESSEL,4 AZ 011962 DRYmR SUP BKT 94AE B N-1 W-3 EAG-CG-408 R3 C

X---

513.10 FF,INVESSEL,94 AZ i

l 01t964 DRYER SUP BKT 184AZ B-N-1 VT-3 MAG-CG-40s R3 C

X---

B13.10 FF,1NVESSEL,104 AZ i

t i

011966 DRYER SUP BC 274A3 B-N-1 W-3 MAG-CG-400 R3 t;

X---

B13.10 FF,2NVESSEL,274 A2 i

P EAO'"0P PPESS"P E VES$EL ' PEP SWG NO

!!!-:*3-FI-15) 011969 SMROUD SVPPCRT B-N-2 77 3 MAG-C3-408 R3 C

X---

EXAMINED A00ESSIBLE PORT *ISS TROM D:E B13.22 ANNULUS R13:0N RE*'#IEN Jis! *O JPs;;

FF,IF.*ESSEL INCLUSIVE.

CCFE SMPOUD (FEF. DWG NO. P!7?PE 1-2n 011974 H-1 IN/0L*T N/A UT-453*E.*P UT-PRM-5037210 A - -- PERFOMED US*NG TEE GE CO Ua:YER.

SHROUD SUPPORT RING TO PLATE N/A UT-60LI. PUP UT-PBM-503V2R0 Tw!% SCANNED NELD LENGTH !!SWL) = 33%

+---

UT-B*LICP UT PBM-503v2RD (CVER 66% CF THE CIRO).

  • 4 0F TEE I

UT-4 ES* T.".N UT PBM-503V2RD LENGTH NAS EXAMINE: BY Al* U.ANS:200ERS.

l UT-6:LI.CP UT-PBM-503V1R0 14.8% OF THE TSNI. NAS F0r!C T* AWE

  • ON UT-9 01.!J"*P UT PBM-503V2R0 THE SHROUD ID, PLTu"E SICE. * *MITS EXIST (CONST INS"'R LUGS) 1 i

t 1

l l

l l

i

l s..

=

t i

i l

DATE: 01/04/95 PEACH BCTTCM ATOMIC POWER STATION UNIT 2 PACBs 20 REV8810Ns 1

INSERVICE INSPECTION

SUMMARY

1 SECOND INTER 7AI., THIRD PERIOD, FIRST OUTAGE (94RF)

CLASS 1 CPAUEP STATUS COMPONENTS i

I REAC"TR PPESS"PE VESSEL i

l NR R

j ASME S OEGE SEC. XI T RCEP CUMMARY EXAMINATION AREA CATGY EXAM A EOOO F.EMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR **CALIBR.ATION BLOCK **

COPE SMPOUD 'PFF. DWG. PO. FIG"PB 1-2)

I I

011977 H-2 IN/0UT N/A UT-45SLKUP UT-PBM-503V2R0 A PERFORMED USING THE GE C 3ACKER.

PLATE TO TCP GUIDE SUPPORT N/A L*T 40LL7*.*P UT-PBM-503V2R0

-- -- TOTAL SCANNED NELD LENG""E e 84%.

82.4%

l RING Li-80LU"JP W-PBM 503V2R0 CF THE LENGTH NAS EXAMINT*: 3Y ALL Li-455'E N UT-PBM-503V2R0

--- - TRANSDUCERS. NO FLAWS WERE OETEC'TEO.

Li-601.LC N L7-PBM-503V2R0 i

ti-SOLLE N UT-PBM-503V2R0 f

011380 H-3 IN/0LT N/A UT-455 rJP UT-PBM-503V2RD A PERFORMED USING THE GE C " PACKER.

I TOP G7I;E SUPPCRT RIN3 TO N/A UT-4 0LD*0P tTa-PBM-503V2RD


TOTAL SCANNED WELD LEN3"E TSWL) e PLATE 88.3%.

87.3% OF THE LEN3"E WAS EXAMINED BY ALL TRANSDUCERS. 11.9:n OF THE TSWL NAS FOUND FLANED ON THE SKR UD ID, PLATE SICE. NO UT CREEPING WA~E WAS PERFORMED.

l 011983 H-4 IN/Offf N/A UT-45SirJP UT-PBM-503V2RO A PERFORMED USING THE GE C: 3.ACKER.

PLATE 70 PLATE N/A W-60LirJP UT-PBM-503V2R0

--- TOTAL SCANNED WELD La*V.37H {TSWL) e LT-80LIJ"JP UT-PBM-503V2RO 89.2%.

86.16 CF THE LENO: WAS EXAMINED UT-45J:JON UT PBM-503V2RD EY ALL TRANSOUCERS.

I.984 :P THE TSWL i

t U'"-40LUON UT-PBM-503V2R0 WAS FOUND FLAWED CN "HE EER:LT ID/CD,

---+

UT-80LIJON UT-PBM-503V2R0 PLA08 SIDS.

011986 H-5 IN/0UT N/A Li-455*4*P UT-FBM-503V2RD A PERFORMED USING THE GE C U.A"KER.

PLATE TD CORE PLTE SUPPORT N/A UT 40LU*'JP UT-PBM-503V2R0 TOTAL SCANNED WELD LEN3*H TSWL) e RIN3 Li-8:LLCP W-PBM-503V2RO 53.1%.

80% CF THE LEN3Si WAS EXAM *NED

  • 7-4 55* CN UT-PbM-5 03V2R0

BY ALL TRANSOUCERS.

.42*n P THE TSWL LT-60 LLC N UT-PBM 503V2R0


NAS FOUND F. AWED CN TME SMT.;-"J CD. RING Li-801.UON L*r-PBM-503V2R0 SIDE.

011989 H-6 INf00T N /A Li-453 rJP ITT-PBM-503V1R0 A ---- PERFORMED USING THE 33 57""::N CUP CORE PLTE SUPPORT RIN3 ~0 N/A UT-60LLCP UI-PBM-503V2RD SCANNER TOTAL SCA D.~ED WE.

  • ENGTH PLATE L7-80LIrJP UT-PBM-503V2RO

(TSWL) = 10.2%.

4.8% CF TEE LENGTH NAS EXAMINED BY ALL TRANSOUCEAS.

7.39% CF THE TSWL WAS POUC F* AWE :N ME SERCUD j

ID, RING SIOS.

SUPP. VT WA3 PERF'D CN 13% OF NEi.D LENGTH.

j i

f P

?

DATE: 01/04/35 PEACH BCTICM ATOMIC POWER STATICN UNIT 2 PAGE:

21 RE'72SION:

2 INSER7!CE INSPECTION

SUMMARY

SECOND INTER 7AL, THIRD PERIOD, FIRST OCTTAGE (94RF)

CI. ASS 1 CFAUEP STATUS COMPCNENTS 3

REACTOR PPRS2W E VESSEL NR R

3 ASME 8 0EGE SEC. XI T RC5P I

SUMMARY

EXAMINATION AREA CATGY EXAM A EOOO REMARKS l

NUMBER IDENTIFICATION ITEM NO METHOD PROO DURE T CRNR **CALIBRATICN BI4CK

i CODE SMPOUD (P EF. DWG. 78 0. FIG"PE 1-21 a

011992 H-7 IN/Ot?T N/A UT-4531RDN UT-PBM 503V2RO A PERFORMED ts!NG THE GI 50!"."!!N CUP PLATE TO PLATE N/A UT-6CLLCN UT-PBM 503V2R0 TOTAL s". TD WE*J 1.ENGTH

SCANNER, d%

(TSWL1 = 9.3%.

4% CF THE ".D33TH MAS Li 8:L* CN UT+ PBM-5 03V2R0

.~..

EXAMINED BY ALL TR.A.*:3OUCEP.S. NO F' WS J

NERI DETE:""13.

I i

k i

l 1

i 9

1 B

k

)

l _ -

~.

n l

i a

i

+.

t

.e-i l

1 I-l' i

l DATE: 01/04/95 FIACH BOTTOM ATOMIC FouRR STATION UNIT 2 IAGE:

22 REV2SIONs 2

INSER*.* ICE INSPECTION

SUMMARY

h j

^ SBCOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 3 CFAURP STATUS COMPDFENTS I

RA2N STEAM l

l NR' R

l ASMs 3 oaGa j

SEC. XI T RCEP StaeMARY EXAMINATION AREA CATGY EXAM '

'A BOOO REMARKS NUMBER IDENTIFICATION

' ITEM NO METHOD PROCEDERE T CRNR ** CALIBRATION SIACK

..w............

I RBI.?tF VALVE DISCHARGE FREF. DWG. NO. GG-01-MT-291-K) 1 031603 1GG-E295 P-A, B, C VT-3 MAG-CG-407 R2 C

.X..

STANCHILA PLATS MAS MISALIGNID.

SPRING MANGER FO.00 VT 4 MAG-CG-407 R2 X...

ACCEPTABLE PER A/R e A0060*d*.

l DN. EL I

1 1

1

.'031604 1GG-X295(IA).

. D-B VT-3 RAG-CG-407 R2 C X.' - -

INTEGRAL ATTACHMENT D2.20 l

DW, 033605 1GG 315 P-A, B, C VT-3 MAG-CG-407 R2. C X...

MYDACLIC SNUBBER F0.00 DW, EL 1

s 021600 1GG-5201 F-A, B, C VT 3 MAG-CG-407 R'2 C X...-

NYDAI"JC SNUBBER FO.00 DW, EL I

l l

j 021610 1GG-$201(IA)

DB VT.3 MAG-CG-407 R2 C

X...

INTEGRAL ATTACHMENT D2.20

(

DW, i

1 t

021012 1GG-565 F A,8. C VT 3 MAG-CG-407 R2 C

X-.-

HYDA:"IC SNURBER FO.00 DW, EL t

021610 1GG-565(IA)

D-B

  • /T-3 MAG-CG-407 R2 C

X-..

t INTE3RAL AT*ACHMENT D2.20 DW, 021616 1GG M297 F-A, B, C VT-3 MAG-CG-407 R2 C X SPRING MAN 3Ek FO.00 VT-4 MAG-CG-407 R2 1=.*

DW, EL i

i i

I

-I

1 i

DA*Et 01/04/95 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 PAGE:

23 REU3SION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST OUTAGE (94RF)

?

CLASS 3 CFAURP STATUS COMPCNENTS MAIN $?EAM NR R

ASME

$ 0EGE SEC. XI T RCEF

SUMMARY

EXAMINATION AREA CATGY EXAM A EOOO REMARKS NUMBER IDENTIFICATION ITEM 70 METHOD PROCEDURE T CRMR ** CALIBRATION Bf4CX**

RELTIF VALVE DISCHAPGE FPEF. CWG, NO. GG-01-MI-291-F) 031618 1GG-M297(IA)

D-B VT-3 MAG-CG-407 R2 C

X...

INTEGRAL ATTACHMENT D2,20 DW, l

031620 10G-S29 F-A 8,C VT-3 MAG-CG-407 R2 C

X...

i HYDA OIC SNUBBER F0 00 DW, EL 1

031632 1GG-530 F-A,B,C

  • i-3 MAG-CG.407 R2 C

X...

NYDAULIC SNUBBER F0,00 7

DM, EL h

021634 10G-S106-A/B F-A,B,C VT-3 MAG rG-+w: R2 C

X...

I MECMANICAL SNUEBER PC.00 DW, EL 031626 1GG-31C6(IA)

D-B

'."T - 3 MAG-CG-407 R2 C

X...

INTE3RAL ATTACHMENT D2.20 DW, l

021628 1GG-318 F A.B.C VT-3 MAG-CG-407 R2 C

X..

HTDACIC SNUEBER F0.C0 DW, IL l

C21630 1GG-317 F-A.8,0

  • 7 - 3 MAG-CG-407 R2 C

X...

I HYDA%IC SNUEETR F0.00 DW, EL 031632 1GG-H315 P-A,B,C VT-3 MAG-CG-407 R2 C

X..-

SPRING MANGER FO.00 VT-4 MAG-CG-407 R2 X...

DW, EL

+

I

?

I

.._m.

1

' e l

I DATE: 01/04/95 PEACH BCTTOM ATOMIC POWER STATION 1951 7 2 PAGE:-

24 REVI* ION:

.2 INSERVICE INSPECTION

SUMMARY

SECOND IN*BRVAL, THIRD PERIOD, FIRST OUTAGE (94RF)

CLASS 3 CFAUEP STATUS COMP 0NElffS MAIN STRAM NR-R

. I ASMs 8 oEGs 1

SEC. XI T RCEF St2IMARY BIAMINATION AREA CATGY EXAM ABC00 REMARKS 1

NUISER IDElffIFICATION ITEM No METHOD PROCEDURE T CRRR ** CALIBRATION SLOCK**

)

i l

j RET.fEF VALVE DISCHARGE IREF. DWG. No. GG-01 MI-291-K) i 1

021634 1GG-H315(IA)

D-S VT-3 MAG-CG-407 R2

-C X..*

I i

INTEGRAL ATTACHMENT D2.20

. DW, l

t i

021636 1GG-M316 F A,8, C VT 3 MAG-CG-407 R2 C

2---

]

SPRING MANGBR F0.00 VT-4 MAG-CG-407 R2 X---

]

DW, IL 021638 1GG-821CK F-A,8, C

  • 7 - 3 MAG-CG-407 R2 C

X-+-

f GUIDE FO.00 Dw, Et i

I 021640 1GG-8210K(IA)

D-B

  • 7 3 MAG-CG-407 R2 C

X--=

. INTEGRAL A?fACHMENT D2.20 l

DW,

)

1 i

l 021642 1GG-8208-A/B F A,B,C TT-3 MAG-CG-407 R2 C Z 1

i MECHANICAL SNUBBER F0.00

)

DW, EL 021643 1GG-S20$(IA)

D.B

.T 3 MAG-CG-407 R2 C

X-**

INTEGRAL ATTACHMENT 02.20 DW, 021644 1GG-H?11 F-A, B, C

  • T-3 MAG-CG-407 R2 C

X---

GUIDE F3.00 DW, EL 021546 1GG-H712(IA)

D-8 VT-3 MAG-CG-407 R2 C

X+--

INTEGRAL ATIACHMENT D2.20 DW, l

i

. ~,

r v

-e-~v,-

_ ~..

- - ~. - ~..

. - ~. - -.. -

~. _.-.......-

e DATE: 01/04/95 PEACH BOTTCM ATONIC POWr STATION UNIT 2 '

PAGE:

25 REV3SION:

2 INSERVICE INSPBC% JN

SUMMARY

SECOND INTERVAL, THIRD PL.)CD, FIRsT CttfAGE (94RF)

CIASS 3 CFAURP STATUS CDNPONENTS MAIN STEAM WR R

)

MNE 8 05GB 1

f.

SEC. XI T RCEP l

SUMMARY

SXAMINATION AREA CATGY EXAM 1.

1000 RBMARKS NUNDER IDENTIFICATION ITEM NO METHOD PROCW WE T CRMR ** CALIBRATION BLOQt**

RELTEF VALVE DISCHARGE fREF. DWG, NO. GG-01-MI-271 pr) 031648 1GG-H713 F-A,B,C VT-3 MAG-C5-407 R2 C

2...

GUI E FC.00 i

DW, EL I

021050 1GG X*14 F-A,3,C VT-3 MAG-CG-407 R2 C X. -- -

RIGID RESTRAINT FO.00 DW, EL 021652 1GG-N715 F-A,3,C VT-3 MAG-CG-407 R2 C

1...

RIGID DESTRAINT FO.00 DW, EL I

I 081654 1GG-H716(IA)

DB VT.3 MAG-CG-407 R2 C

X...

I INTEGRAL ATTACHMRlrf D2.20 i

DW, l

1 RELTEF VALVI CISCMAPOE 'P TF OWG. No. *ri-01 *T-2'1-G) 022102 1GG-843 P-A, B, C VT-3 MAG-CG-407 R2 C

X...

HYDAULIC $NUBBER FO.00 DW, EL 022104 1GG-363(IAI D-9

?!-3 MAG-CG-407 R2 C

X...

INTE37Jd, ATTA*HMENT 02.20 DW, i

023100 1GG-M299 F-A, B, C VT-3 MAG-CG-407 R2 C

  • I..

STANCHICN PLATE WAS MI5 ALIGNED BY 7/8' j

SPRING MANGER F0.00 VT-4 MAG-CG-407 R2 1*..

ACCEPTABLE PER A'R s A08 tit *$.

DW, EL I

033108 1GG-H299(IA)

D-B VT-3 MAG-CG-407 R2 C

X...

IlrIEGRAL ATTACHMENT D2.20 DW,

{

h.

l I

l l

I

.~

I s

. DATE:.01/04/95 PRACH SOTICM ATOMIC POWBR STATION UNIT 2 '

PAGE:

25 RavIsIoN:

2 INssRvzCs INsesCTIoM scMMARY k

SECOND INTERVAL, THIRD PERIOD, FIRST Ot?TAGE (94RF) -

i i

CLASS 3 CFAUBP STATUS CCMPONENTS

(

nAIw sTnAn NR R.

l AsMs.

8 0: Ga i

ssC. XI T-RCaF l

EllMMARY EIAMINATION AREA CANY EXAM A B 0 0 0 : REMARKS l

NUMBER IDENTIFICATION ITEM NO ~ METHOD PROCEDURE T'CRMR ** CALIBRATION 314CK**'

l RRttEP VALVE DISCHARGE (REF. DWG. NO. QG-01-MI-291-G) 022110 100-834 F-A,3,C VT*3 MAG-CG-407 R2 C

X+==

i

= NYDA:"IC SNUBBER F0.00 Dw, EL I

i I

~

f 022112 1GG-523 F-A, B, C VT-3 MAG-CG-407 R2 C Xa NYDAULIC SNUBBER FO.00

)

Dw. 5:.

i I

l U22114 1GG-H313 F-A, B, f; VT-3 MAG-CG-407 R2 C

X**-

SPRING MANGER F0.00 VT-4 MAG-CG-407 R2 X - --

DW, EL g

)

022145 1GG-K313(IA)

D-5 VT-3 MAG-CG-407 R2 C

X=.-

l INTEGRAL ATTACHMEFT D2.20 DN, 222118 1GG-5104-A/S F A B.C W3 mad-CG-407 R2 C

X...

M8CHANICAL SNU5BER F0.00 DN, EL 022120 1GG 3104(IA)

DB VT 3 MAG.CG-407 R2 C

X.

INTEGRAL ATTACHMEFI D2.20 DW,

)

022122 1GG-322 P-A, B, C VT-3 MAG-CG-407 22 C

X---

NYLA "IC ENUBBER FO.00 DW, EL i

022124 1GG-821 F-A, B. C VT-3 MAG CG-407 R2 C

X+=*

i NY ALLIC SNCBBER F0.00 DW, EL l

f l

9 f

i

\\

1 l

i l

l l

DATE: 01/04/95 PEACH BOTICM ATOMIC POWER STATION UNIT 2 PAGE:

27 i

1 REV8SION:

2 INSERVICE INSPECTION

SUMMARY

l SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF)

CIASS 3 CPAUBP STAIUS COMPONENTS i

PAIN STRAM NR R

i i

ASME S 0EGE j

SEC. XI T RCEP i

l

SUMMARY

EEAMINATION AREA CATGY EXAM A B000 REMARKS i

(

NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE T CRMR *

  • CALIBRATION BLOG**

l FRi!EF VALvB DISCMAPGE fREF. DwG. No. GG-01-PI-291-G) i

(

033&36 1GG-H318 P-A,B,C VT-3 MAG-CG-407 R2 C

X-*-

i STRING HANGER F0.00 W-4 MAG-CG-407 R2 X---

DW, EL i

022126 133-3210G F-A, B, C VT-3 MAG-CG-407 R2 C

1---

l G"IOR F0.00 i

DW, EL l

1 i

023&30 1GG-8210G(IA)

D-B W-3 MAG-CG-407 R2 C

1---

l INTEGRAL ATTACHMENT D2.20 DW, l

j 023E33 1GG-5209 A/B F-A,B,C VT 3 MAG-CG-407 R2 C

X*--

MECHANICAL SNUBBER F0.00 DW, EL 033134 1GG-52 0 9 (I A)

D-B

'.7-3 MAG-CG-407 R2 C

X---

INTEGRAL AT"ACHMENT D2.20 i

l DW, 022136 1GG-H471 F-A,B,C VT-3 MAG-CG-407 R2 C

X---

GUILE FC.00 DW, EL 022138 1GG-H672(IA)

D-B W-3 MAG-CG-407 R2 C

X---

IN 1GRAL ATTACHMENT D2.20 DW, 033140 1GG-H673 P-A,B,C VT-3 MAG-CG-407 R2 C

1---

RIGID RESTRAINT FC.00 f

DW, EL l

l 1

l

i -

g

, m

.~,

_.m.

l' L:,_

I i

e t

DATS: 01/04/95 PEACH SCTTCM ATONIC POWER STATION UNIT 2 PAGE:

28 f

RFJ25 ION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST OUTAGE (94RF) i

~ CI. Ass 2 CrAusP sTAIus ConPONENTs l-MAIN STRAM L

NR R-i l

ASME

'S 0BGE SEC. XI T RC3P

SUMMARY

EXAMINATION AREA CATGY EEAM A EOOO REMARKS NUNSER IDENTIFICATION ITBM NO METHOD PROCEDUR5 T.CRMR ** CALIBRATION Bt4CK88 l

I RELIEF VALVE DISCMARGE fREF, CWG, WS. GG-01-MI-2T1-G)

']

l P

023142 1GG-H474 F-A. 3, C VT-3 NAG-CG-407 R2 ~ C-X*.+

t j.

RIGID RESTRAINT FO.00 j

DW, E j

1 l

033144 1GG-H674 (IA)

D-B VT-3 NAG-CG-407 R2 C

X---

INTEGRAL ATTACHMENT D2.20 DW, LOOP 3 (REF. DWG. W. OBN-01-MI-201 1-9' o

025100 HB3 (IA) 3-K-1 MT NT-PE-001 R2 C

X+--

LIMITED EXAM 70 87.27% Cot 3 COVERAGE DUE h

INTEGRAL AITACHMENT 810.10 TO PIPE CLAMP.

DW, EL 185-6, los A3 p

j l.

I 035300 HB3 F-A,8 C VT-3 NAG-CG-407 R2 C

X---

8PRING MANGBR FO.00

    • T-4 MAG-CG-407 R2 X-

=

l DW, IL 185-4, 104 A3 i

I 036100 MB2(IA)

B-K-1 MT MT PE-001 R2 C

X.**

INTEGRAL ATTACHMENT S10.10 DW, EL 156-4, 94 AI l

036200 HB2 F-A 8, C VT-3 MAG-CG-407 R2 C

X---

I SPRIN3 HANGER F0.00

  • 7-4 MAG-CG-407 R2 X-.-

DW, IL 156 8, St A:

026800 HEl(IA)

B K-1 MT MT-PE-001 R2 C

X+-.

I.IMITED EXAM 70 59.34% CCOI C07E7JuliE DUE INTEGRAL ATTACHMENT B10.10 TO PIPE C" AMP.

l DW, 3* 156-s, 25 AI g

l, I

l i

4

._m.m-i l_,

l DATEi 01/04/95 PEACH Bo??ON ATOMIC POWER STATION UNIT 2 PAGE:

29 REVISION:

2

' INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL. THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 1 CFAUIP STATUS COMPONENTS MAIN STRAM NR R ASME S 0EGB l

.SEC. XI T RC3P

SUMMARY

EXAMINATION AREA CATGY EXAM A BC00 REMARKS

}

Nt2EBER IDENTIFICATION ITEM NO METHOD PROCEDURE T'CRMR ** CALIBRATION BLOCK" j

LOOP B IREP. DWG. NO. DBN-01-MT-201-1-B) 028900 MB1 F-A, B, C VT-3 MAG-CG-407 R2 C

-X--

5 14085 NLis WERE *:ENTIFIED, HCWE"/ER, SPRING MAIIGER FO.00 VT-4 MAG-CG-407 R2 1-

- WERE DETERMINED TO BE NOT PART CF THE DW, EL 156-s, 35 AZ SUPPORT. REF A/R e A0880996.

029200 1-B 7/BSD BJ MT MT-PE-001 R2 C

1-=*

$* BRANCH CONN 39.31 UT-453 UT-PB-002V9 R0 X---

DW,- EL 157-0, 45 AZ

    • 26-CS-I-1.06-28-PEB**

030600 8831 F-A,B,C VT 3 MAG-CG-407 R2 C X HYDRAULIC SNUBBER F0.00 DW, EL 156-8, 125 AE C30900 1-B-9/BSE B-J MT MT PE-001 R2 C

X---

6* BRANCH CONN 89.31 UT-453 UI PS-003V9 R0 X---

DW, BL 157, 120 AZ

    • 26-CS-X-1.06 20 7E3**

034000 GB1(IA)

B-K-1 MT NT-PE-001 R2 C

X-*-

LIMITED EXAM TO 42.9% CODE 20VERAGE DUE INTEGRAL ATTActiMENT B10.10 70 PIPE C*4MP.

DW, EL 138-1, 179 AZ S AFE*? & S ti!EF PIEEP S '9 51

  • ?*

O* N * -MT-201-1-B) 035900 1-850 1 3-J MT NT-PE-001 R2 C

X---

BRAN;H CONN TO PIPE 39,11 Li 0 UT-PB-002V9 RO X---

DW, EL 157-0, 70 AZ UT-453 UT-PB-002V9 R0

--X-DW, EL 157 0, 70 AZ UT-613 UT-PB 002V9 R3

--X-

    • 6-CS-160.710-6A-732**

040200 1-BSD-2 B-J MT MT-PE-001 R2 C

X---

PIPE To FLANGE 89.11 UT-453 UT-PB 002V9 R0

--X-DW, EL 157, 45 A3 UT-6ts UT PB-002V9 R0 X---

u._

l s

DATEt 01/04/95 PEACH BOTICM ATOMIC POWER STATICW UNIT 2 PAGE:'

20 mETSION INsERvIc5 INSPECTION SunnARr SECOND INTERVAL, THIRD PERIOD, PIRST CUIAGE (94RP) i 1

CLAS31 CPAUEP STATUS COMPONENIS MAIN STEAM NA R

ASME

'S:05GE.

SEC. XI T RCEP

SUMMARY

EXAMINATION AREA CATGY EXAM A~EOOO REMARKS NUMBER IDENTIFICATION ITEM NO METHCD PROCEDURE T CRMR **CALIBRATICN BIACK**

SAFETY & RELIEF RISERSIBS) (REF, CMG. No. CBN-01-M!-201-1-3)

L 040500 1.BSP-1 '

BJ MT.

MT-PB-WO1 R2 C

X-.*

BRANCH CONN TO PIPE 89.11 Li-453 UT-PB-002V9 RO

--X.

DW, EL 157-0, 165 AZ t

    • 6 CS-160.710 6A PEB**

000700 1-BSA-2FB B-G-2 YT-1 MAG CG-407 R2 C

  • 1

- STUDS 10 (, 11 MAVE OEFORMEO TY. READS.

FLANGE BOLTING B7.50 ACCEPTABLE PER A/R

  • Aca84*90 DW, EL 157, 100 A3 LOOP C (REF. DWG. NO DBN-01-MI-201-1-C) f 001300 1-C-1 B-J

' MT MT-PE-001 R2 C

X-..

j NO32 TO TRANS PIECE 29.11 LT- 0 UT-PB 002V9 R0 X*--

l DW, EL 2 03-0, 252 A2 Li-453 LT-PB-002V9 R0 X*=*-

l l

043100 1-C-4LUI B-J MT MT PE-001 R2 C

X--.

E i

14NG SEAM UPSM EL IR 89,12 UT-453 LT PB 002V9 30 X...

DW, EL 195, 252 AZ

    • 26-CS-X-1.06-28 PES **

l I

i l

042200 1-C-4LUO BJ MT MT-fE-001 R2 C

X--.

i LCNG SEAM UPSM EL CR 89.11 UT-453 UI PB-002V9 R0 X--.

l DW, EL 195, 252 AZ

    • 26 CS-X-1.06-20-713**

I l

t i

002300 1-C-4 B-J MT MT-PE 001 R2 C

X-..

ELBCW 70 PIPE 89,11 LT-453 UT-PS-002V9 R0 X-.-

DW, EL 195, 252 AZ

    • 26 CS-X-1.06 28-PE88*

j 042400 1-C-4LD B-J MT MT-PE-001 R2 C

X*..

LONG SEAM DNSM 89.12 L7-453 UT-PB-002V9 RO X...

DW, EL 195, 252 AZ

    • 26-CS-X-1.06-28 PIB**

.~._.

...m.-..

~

  • f I

t.

l 1

i k

I i

i DATE: 01/04/95 PEACH BCTTCM ATOMIC PCMER STATION UNIT 2 PAGE:

31 ret #ISION:

2 IN$ERVICE INSPECTION StantARY SECOND INTERVAL, TMIRD PERIOD, FIRST OUTAGE (94RF)

I h

' f CLASS 1 CFAUBP STATUS COMPCNENTS MAIN STEAM I

NR R

9 AsME 8o3o3 1

SEC. XI T RC3P I

StautARY EXAMINATION AREA CATGY-. EXAM A BC00 REMARKS.

F

{

NUNDER IDENTIFICATION ITEM No METHOD PROCEDIEtB T CRMR ** CALIBRATION SthCK**

t 4

I LOCP c (REF. DWG. No. CEN-01-MT-201-1-C)

)

1 047720 1-C-9LU B-J MT NT-PE 001 R2 C

X--* '

LONG SEAM UPSM TEE 89.12 O-453 UT-PB-002V9 R0 X.**

DW, EL 157-0, 100 AZ

    • 26-CS-X-1.121-1A-7BS**

' I L

l 047400 1-C-9 B-J MT MT-PE-001 R2 C

X.--

LIMITED MT EXAM TD 95.12% CODE COVERAGE.

TEE TO PIPE 39.11 t"l-4 5 8 UT-PB-002V9 R0 X-**

LIMITED 17; SXAM TO 90.24% CODE COVERAGE DW, EL 157, 100 A2 DUE TO WELCED SUPPCRT.

r

    • 26-CS-X 1.06-28-PIB**

i I

047900 1-C-9LD B-J MT NT-PE-001 R2 C

X.--

)

LONG SEAM DNSM 89.12 L'*-4 53 UT-PB-002V9 R0 X--+

DW, EL 157, 100 A1

    • 26-CS-X-1.06-20 PEB**

h 049100 1-C-9/CSE B-J MT NT-PE-001 R2-C X-**

6* RRANCH CCNN 39.21 CT-455 tTT-PB-002V9 R0 X-**

^

TW, EL 117, 210 AZ

    • 26-CS-X-1.06-29-PIB**

0$2100 GC1(IA) 3-E-1 MT NT-PR-001 R2 C

X***

LIMITED EXAM 70 28.63% CO:I M RAGE DUE f

INTE3RAL ATTACHMENT B10.10 70 PIPE $*.*PPORT.

DW, EL 12 8-1,181 AZ l

I I

1 h

l l

F l.

k i

v,

- +.,..

a

..w...,,v.~..,.,e.. -.

.,e.

n,,-,.

... ~..

.a

.. +.

?

i 1

a.

l h

b t-I

~

i q...

4 DATE: 01/04/95 PEACH BOTToet ATONIC PONER STATION UNIT 2 PAGE:

t 32 s

CFJISION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRC PERIOD, FIRST OUTAGE (94RP)

C.' ASS 1 CFAUBP STATUS CCMPCNENTS

(

REAR"NXt PRESSURE VBSSEL 4

4 9

i NR R

1 ASME

-S 0EGB SEC. XI T RCEP'

SUMMARY

EXAMINATION AREA CAT 3Y EXAM AEOOO REMARKS

/

NousBR IDENTIPICATION-

' ITEM NO METHCD PROCEDURE T' C R M R ** CALIBRATION B MCY,**

' f j

i.

?

l s

2 8 TNCH StX" TION fREF. DMG. NO. RCS-02-MI-201-1-1) i i

6

. h 090425 2-AS-1 N/A UT 453

- UT PB-002V9 R0 ' A X---

2ND CAL SLOCK: CAL-NINS-001 -

i SAFE END TO NO2 N1A N/A 07-451L UT-PE-002

  • R0-X--+

3 j

DM, IL 161-0 Li-6:1L UT-PB-002

  • R0 X-++

1 DW, EL 151-0 6 SUPP2V5 j

I i

    • 2s SS-X-I.315-l5 PEB**.

1 1

5 s

1 l

. I 4

i l

t 4

i 1~

+

1 1

I l

i 4

I f

i e

4 a

1 4

1, i

4 i

a

-r y-,yg-

.,w.-t-e

-s

---r++-

--t e-ra creyw-m--ar*-

r -

-r-a-w e e+ r ge y e

3 e

t DATBs.'01/04/95 PEACH SOTICM ATOMIC POMBR STATION UNIT 2 '

-PAGE:

23 REVISION:

2 INSERVICE INSPECTION

SUMMARY

SBCOND INTERVAL. THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 1 CFAUSP STATUS COMPONENTS MAIN RECIRC"*JTION NR R

ASME S OEGB 7

SEC. XI

'T RCEP r

SUMMARY

EXAMINATION AREA CATGY EXAM A BC00 REMARKS r

NUMBER IDENTIFICATION ITEM NO MEI1tCD PROCEDENtB T CRMR ** CALIBRATION SIACK**-

3 J

.i 28 INCH SUCTION fREF. CWG NO, RCS-02-MI-201-1-A) i 090475 2-AS-19 N/A ITI-4 58 UT-PB 002V9 30. A X SAFE END TO ELBCW N/A.

DW,EL 161-0, O A?.

    • 2 8.SS-X-1 315 5 8 PEB*
  • i 1

090500 2 AS-19LDI B-J PT LP-PB-001 R4 C

X-..

LCN3 SEAM DNSM EL IR -

59.12 L""-4 5 3 Vt-PB-002V9 RD X*--

DW,

    • 28-SS X 1.315-54-PSB.**

w 090600' 2-AS-19%Do BJ PT LP-PE.001 R4 C

X-.-

LONG SEAM DNSM EL OR 89.12 UT 458 UT-78-002V9 RO X---

DW,

    • 28-SS-X 1.315-$4-PRS.**

1 093300 H2A F A,8, C VT-3 MAG-CG-407 R2 C

X---

~

SPRING MANGER F0.00 VT-4 MAG-CG-407 R2

'X-**

I DW, EL 122-4, 328 AI D'

2 I

, _ _.. ~,.

.. ~.... -..

4 I

'j 6

4 o

1.

1 DATE: - 01/04/95 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 PAGE:

34 J

REVISION:

-2

' INSERVICE IMsPECTION

SUMMARY

SECOND INTERVAL TMIRD PERIOD, PIRST CUTAGE (94RP)

CLASS 1 CFAUSP STATUS COMPCNENTS REACTOR PRESS'35 VBSSEL

[

NR R

ASMS

- S 03GB SEC. XI T RCEP SuMMARr EXAMINATION AREA CATGY EXAM A R 0 0 0 REMARKS j

NtBIBER IDENTIFICATION ITEM NO METHOD PROCEDURS T CRMR ** CALIBRATION BICC3Co*'

i I

4 l

12 INCM MEADEP-LEG G fREP. DWG. NO. R CS - 0 2 -MI-2 01 A)

. l 104600. 2-AHG-8' 8-F PT LP-PS-001 R4 C

X---

SAFE-EE TO NCE N23 35.10 UT-458 UT-PS-002V9 R0 '

---X-'

DW, EL 161-0, 240 A2 Li-4 5E Ur PB-002

  • RC

.-.- X -

I

' DW, EL 161-0, 240 A2 LT-6 0E.

UT-PB-002

--X-

'

  • SUPP2VS

~**SS No.

4**

12 TN'"5? MEA"EP -1.EG M

'*f7.

CWG No. PC$ -0 2 -MI- ?01 A) ~

105900 2-ANH-l B-P PT LP-PE-001 R4 C

X---

SAFE EE To NCE N2H B5.10

!? -453 Ur-PBM-209VO R0 X---

DW, EL 161-0, 270 A2 Li-4 5E UT PBM-209VD RO

--X-DW, EL 161-0, 270 A2 UT-6CRL UT-PBM-209VO RO

--X-

    • SS No.

4**

12 INCH HEADER-LEG J fREF. DWO. No. RCS-02-MI-201-1-A) 107200 2-AHJ t B-F PT LP-PE-001 R4 C

X---

SAFE-EE To NO3 N2J 95.10 LT-453 UT P8M-209VO RO

--X-DW, EL 161-0, 300 A2 UT-4 5E EFT PBM-209VO R0

--X-DW, SL 161-0, 300 A2 UT-6 0 E Ur-PBM-209VD R0

--X-

    • SS No.

4**

J

\\

. ~..

-.~.

0 d

1 a

i 1

f I

DATE: 01/04/95 PEACH BOTTON ATONIC PONBR STATION IntIT 2 PAGE '

35 i

REVISION:

2 INSERVICE INSPBCTION

SUMMARY

t I

SBCOND INTERVAL, THIRD PERIOD, FIRST OUTAGE (94RF) i CLASS 1 CFAUBP STK!VS COMPONENTS NAIN RECIRCUIA* ION NR

,R-1 i

AsNs 3 oEoa SBC, XI T R C B P.-

l 4

i C12WLARY EXAMINATION AREA

'CATGY EXAM A EC00 RENARKS i

l NUMBER IDENTIFICATION ITEN NO NETHOD PROCEDURE T C R N R- ** CAL 1BRATION BLOCK **

1 f

12 Tr"M MEADEP-LEG F f REF. CWG. No. RCS-02-MI-201-1-A) f, 108400 2 ANK-7 5-J PT LP-PE 001 R4 C

X+--

PIPE BEND TO SF-END 39.11 LT 453 UT-PBN-200VO R3

-+1-DN, EL.161-0, 330 A2

    • 12-SS-100.844-56-P58.**

l I

t i

o i

l t

i l

I t

l i

i i

i h

.... _..,. -.. =.

,..._,_.,_.m._,

+

'e

).

l k

?

DATE: Ot/04/s5 PEACH BOITON AtcNIC PONER STATION UNIT 2 PAGE:

36 REYZSION:'

2 INSERVICE INSPECTION

SUMMARY

. SECOND INTERVAL. MIIRD PERIOD, PIRST QUTAGE (94RP)

CLASS 1 CPADEP STATUS COMPONENTS i

REACTOR PRESSURE VESSEL NA R

I ASME S 0EGE SEC. XI T RC3P I

SUNNARY EEANINATION ARIA CATGY EXAN A E O O 0 RENARKS NUMBER IDENTIFICATION.

ITEN NO NETN00 PROCEDURE T CRNR: **CALIBRA*. ION BID:K**

l 12 INOf MEADER-LEG K fREF. DWG. NO. R CS MI-2 01 A) 108500 2-ANK-8 E-P PT LP-PE*001 R4-

'C X...

SAPE-END TO NO2 N2K B5.10 UT-453 UT-PSN-209VD R0 X...

DN. EL 161-0, 330 AI UT.45RL

' UT-PsN-209VD R3

--X-DN, EL 161 0, 330 A2 UT.6CRL UT-PONa209VO R0

..X.

    • SS No. 4" a

t i

1 i

l l

L J

l

._~.

p r

e I

l-DA*3:.01/04/95 PEAOI BOTTOM ATOMIC POWBR STATIost tBIIT 2 PAG 8:

-37 l

REVISIONI, 2

' INSERVICE INSPECTION SQWtARY l

' SECOND INTERVAL. THIRD PERIOD, FIRST CUTAGE (94RF) '

i CLASS 1 CFAUBP STATUS COMPCNENTS MAIN RECIRC"*.ATION N1 R

- ASME S.05GE SEC. XI T RC8P t

p i.

EUMMARY RZAMINATION AREA CATGY EXAM A EOOO RBMARKS NUMBEst IDENTIFICATION 17318 No MEI180D PROCBDDRE T ' C R M R ** CALIBRATION 31DC3r*,

I MA'N RECTRCUIMION (REF, CWG. NO. RCS-02-MI-201-1-A) 108550 2*AS-26/ASD B-J PT LP-PE-001 R4 C

2**-

2* 3 RANCH CONNECTION 39,32 DW, IL 122-4, O AI t

106612 PG11A F-A.S.C

  • T. 3 MAG-CG-407 R2 C

X-*.

RIGI RESTRAINT F0.00 i

DW, EL 122-4 O A2 i

i..

I I

I i

i i

l l

t i

i t

l l

l i

L l

I E

L

(

t.

l

... ~..

.~.~.--..~~.-.-...-.u,...

. ~. - -. -

l DATE: -01/04/95 PEACH BCTTOM ATONIC PONER STATICN UNIT 2 PAGE:

20 REVISION:

2 INSERv!CR INSPEC"f!ON

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 1 CPAUBP STATUS COMPCNEN*S f

l-RaacToR PRassrRs vaSSat NR R

ASMB.

S 0EG3 SEC. XI T RCBP SuuMARr axAnIxATION ARaA CATGY EXAM A EOOO REMARKS NUISER ' IDENTIFICATION ITEN NO NETMOD PROCEENt3 7 CRNR ** CALIBRATION BlacKe*

l

+

b 29 INOM SUCTICW (DEF. !WG. NO. RCS-02-MI-201-1-91 109025 2 BS-1 N/A 177-458 UT-PS*002VS R0 A X--.

2ND CAL BLOCKS CAL NINE-001 SAPE-END TO NOT N1B N/A UT-45RL UT-PB-002

  • RC X-I DN, EL 161, ISD A2 -

ti-6 RL LTF-PB-002

  • R3

'X-..'

[

CN, EL 161, 180 A2

  • SUPP2V5 I
    • 20-SS-X-1.215-18-PIB**-

i

+

5 I

i

[

+

t t

5 P

i t

I 1

I r

P i

i i

I i

1 6

1 i

l-l l

D M s 01/04/95 PEACH BCTTOM ATOMIC POWER STATION UNIT 2 PAGE:

39

[

.REPoSION:

2 INSERVICE INSPECTION

SUMMARY

(

SBCOND INTERVAL. THIRD PERIOD, FIRST CUTAGE (94RF) 6 I

CLASS CFAUBP STATUS CCMPOWENTS 6

l MAly RECIRC*".ATION i

NR R

ASMS S 0305 t

f SBC. XI T RC57 I

l

SUMMARY

sXAMIxATION AREA CATGY EXAM A EOOO ROMARKS j

I NUMBER IDENTIFICATION ITBN NO METHOD PROCEDURE T CRMR ** CALIBRATION BLo m**

l j

i I

28 *W3f SUCTION (REF. DWG, No. RCS-02-MT-201-1-B) i 109075 2 58-18 N/A UT-458 UT-PS 002V9 R0 A X-...

i SAFE END TO ELSDN N/A DW, EL 151, 190 AI i

    • 28-88-X-1.315 58-PBB**

l i

1 I

I I

t I

I

(

l I

I

., -, -.. _. -.,,, _.. ~ - -... -,

k h

I

[,

DATEi 01/04/95 PEACH BOTICM ATOMIC POWER STATICH UNIT 2 PAGE:

40 l

REVISION:

2 INSERVICf INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 1 CTAUEP STATUS COMPCNENTS REAt"f0R PPESS"PE VESSEL NR R

f b

ASME s o5oE

$EC. XI T RCEP

SUMMARY

EXAMINATION AREA CATCY EXAM A EOOO REMARKS i

NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE T CRMR ** CALIBRATION BLOCK'*

?

12 TN N MEADEP-LEG A (P EF. DWG. No PCS-02-M* *01-1-9) 132000 2-tHA-8 8-F PT LP-PE-001 R4 C

X---

SAFE-END To NO2 N2A B5.10 L7-455 UT-PBM-209VO RC

--X-DW, EL 163, 30 AZ UT-45R*

UT-PSM-209VO RC

--X-

o DW, EL 163, 30 A2 177-6;RL UT-PBM-209VO RO

--X-

    • SS No.

4**

12 IN G NEADEP-1.E3 E fPEF. tWG. NO PCS-02-M*-!"1-1-B) 127100 2-BME-9 BF PT LP-PE-001 R4 C

X--

SAFE-END To NO2 N2B B5.10 L*T-els L7-PBM-209VD KO

-X=

i N

DW, EL 161-0, 150 A2 L7-45EL UT-PBM-209VD RO

--X-DW, EL 161-0, 150 A2 L7-6CRL UT-PBM-209VD RO

--X-

    • SS No.

4**

3 d

a e

e 4

~.

.~

~. -.

t

... e DATE: -01/04/95 PEACH SCT Cet ATCet1C PONRR STATION 19817 2 PAGE:'

41 RBVISION:

2 INSERVICE INSPECTION StantARY SECOND Ilf?IRVAL. THIRD PERIOD,' FIRST OtTTAGE (94RF)

CLASS 1 CFAUBP STATUS COMP 0erBNTS-R&2W RECIRCUIATIQW l

.NR.

R 1

1 ASMS S O505 j

SBC. II T,RCEF SuunARY rrarnATr0N ARax CAror.'

EXAM A 8000 Ran4RES

' NtBISER IDENT*. 71 CAT 1005 ITEM 310 NETHOD PROCEDURE T.CRN3 eer ar.smem? ION BIbCK'* ;

SU ETCN DRAIN (REF. DWG NO. DCS-02-M7-201 1-B) 837205 2-BSD-4 5+J PT LP-PR-001 R4 C

Z~**

PIPE TO 31ADW 39.40 DW, IL 120-7, O A3 i

l

)4 0

I

~, -

~

,_ __ w ; m w -

. ; ~

~

- - --. - ~..,

f r

~

=

3

?

k l

DAT88 01/04/95 PEACH 90TTOM ATOMIC POWER STATICH tarIT 2 FAGE:

. 42 l

f REVISION:

2-INSERTICE INSPBCTION SLHRARY

'l l

SBCOND INTERVAL, 71!!RD PERIOD, FIRST CUTAGE (94RF)

I

' CIABS : CFAUBP STATUS COMPONENTS

'l maAeron PRaSSa s vas:sI, 1

l NR R ASME S 05GE

{

SBC. XI T RC5P SUNRARY EIAMINATION ARIA CATGY SXAM A B C 0 0 - REMARKS l

5 L

NtReBER IDENTIFICATION ITEM NO METHOD PROC 3 DURE T C R N R. **CALIBRATIDH BIDCK" '

t

~l PIPING FREF.' DWG.,.

'I NO. TSI.2 RV.05)'

[

l 129052 1 1 19R -

N/A.

UT-453-Ifr.PD.002V9 RO:A 2--=

l f

N0ZZL5 N9 TO CAP N/A UT-45K*

UT.PB.002

  • R0 X.==

l DN, EL 186 0, 146 AI t?T-6 CE*

UT.PB 002,* R3

'X I

j DW, IL 185 0, 146 AZ

  • SUPP2VE-l
    • 5.1 IN-X. 602 41.PEB

t l

i e

l 1

i i

I i

F l

)

s P

l

?

t i

i l

i I

6 l

l-e L

I l

i-l

i DATSI 01/04/95 PRACH BOTTON ATONIC POWER STATION 12ti!T 2 PAGB:

42 i

REVISION:

2 INSERVICE INSPECTION StNetARY SECOND INTERVAL, THIRD PSRIOD, PIRST Ot7TAGE (94RP)

CLASS 1 CFAURP STATUS COMPONENTS I

RsacToR DRAIN NR R

]

'ASNB S 05GB SBC. XI T RC5P StastARY RIANIMATION ARSA CATGY EEAN A R000 nammars NtatBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRNR ** CALIBRATION BIDS **

1 2 INCH BOTTON HEAD DRAIN (REP DWG. NO. DCN-04-Mf-201-2) i 129064 4-RD-5 S-J

. PT LP-PB-001 R4 C

X+-.

I COUPLING TO PIPS BND 39.40 DW, BL 161-2, 17 A3 829065 PN-87 P-A,3, C VT-2 NAG-CG-407 R2 C

X+--

]

SPRING MANGER P0.00 VT-4 MAG-CG 407 R2 X-l DW, EL 161 2,17 A3 129000 4-RD-12 B-J PT LP-P5 001 R4 C

X-==

(

sLaoW TO PIPS sND a9.40 DW, BL 140-0, 19 AX 2 INCM BOTTON MEAD DRAIN (REF. DWG. NO. DDN-04-MI-201 1) 129096 4-RD-21 3-J PT LP-PE 001 R4 C

X=-*

PIPE TO VALVE 89.40 DW, EL 124-0,

  • I a

129098 4-RD-22 3-J PT LP-PB-001 R4 C

X...

TER TO PIPE 39.40 DW, IL 124-0 AZ 208 REAC"OR DRAIN (PEP. DWG No. CON-04-MI-201-11 139101 PG-22 P-A,8,C VT-2 MAG-CG-407 R2 C

X---

RIGID RESTRAINT P0.00 DW,EL 124 0,SUB-PILE 2 TNCH BOTTON HEAD DRAIN fREP. DWG. No. DDN-04-MT-201-1) 129502 4-RD-24 B-P PT LP-PB-001 R4 C

X---

PIPS TO RIA0W B5.140 DW, EL 124-0,

  • i 1

l 4

I

~']

4 h-g..

DATE: 01/04/95 PBAct SUITOM ATOMIC POWER STATION UNIT 2 PAGE:

44 j

?

RFESION:

2 INSERVICE INSPECTION StBIMARY 4

i SBCOND INTERVAL, THIRD PERIOD, FIRST OtfrAGE (94RF)

F' CLASS 1 CFAU5P STATUS COMPONENTS REACMR DRAIN 2

NR R

h ASME S OEG5-E 5

SEC. KZ T RC3P SINNIARY EKAMINATION AREA CAMY RIAN A B000 " h*re

)

IRBIBER IDENTIFICATION ITEM NO MBTMOD PROCEDURE T CRMR ** CALIBRATION BLOCK" b

2 THCM SOff0ft READ DRAIN (REF. DifG. NO, DDN-04-MI-201-1) 129104 4-RD-28 B-J PT LP.P3-001 R4 C

2..*

ELBOW TO PIPE 89.40 2

DW, BL 124-3, e l

1 l

l REACTOR DRAIN (REF DWG.. No DDN-04-MI-201-1) 129117 PG-11D F A, B, C VT-3 MAG-CG-407 R2 C %..

RIGID RESTRAINT F0.00 DW, SL 130-0, O AE 7

129121 PG-338 F-A, B. C VT 3 MAG-CG-407 R2 C

X-**

l RIGID RSSTRAINT F0.00 l

DW, EL 140-0, O A3 I

h 2

?

e L

e

)

I l.

e 4.

DATBs 01/04/95 PEACH 3071'ON ATollIC POWER STATION UNIT 2 '

PAGE:

45 REESION:

2 INSERVICE INSPSCTION SENNEARY SECOND INTERVAL, THIRD PERIOD, PIRST OUTAGE (94RP)

CLASS 1 CPAUBP STATUS CONPONENTS BEACTOR PRESSURE VESSEL NA

.R ASME S.OEGE 1

SEC. XI T RCEP-1 StNERART BEANINATION AREA CANT EEAN A EOOO REllARKS j

NtREBER IDENTIFICATION ITEN NO METHOD PROCEDURE T CRNR **CALIBRATICII S!hCK'*

I i

2 IIICH IRISTRtNIBIITATION ' REP. DtfG NO, ISI-2-RV-05) e 129126 4-N16A-1 3P' PT LP-PE-001 R4 C

1-=*

r N16A 3I03 TO COUP 95.20' i

DM, EL 178-9, 40 A2 l

i 1

(

129140 4-M11A-1 3-P PT LP-PE-001 R4 C

X---

N11A NOI TO COUP B5.20 DN, EL 106-0, 40 AE i

4 l

.129150 4-N118-1 5-P PT LP-PE-001 R4 C

1---

4 i

W113 IIDE TO COUP 35.20 1

l Dif, BL 186-0, 220 AZ I

+

I L

I 1

i

+

6 l

1 I

l i

l 1

i l

. ~.

_ _. ~

~.

.-e t

l l

l DATE: - 01/04/95 PEACH BOTICM ATORIC POWER STATION UNIT 2 PAGBt 46

)

REVIZION:

2 INSERVICE INSPSCTION

SUMMARY

SECOND INTERVAL, THIRD NEIOC, FIRST OUTAGE (94RF)

CLASS 1 CFAUBP STATUS COMPONENTS REED UTER si R R ASME S OEGB SEC. XI T RCEP.

l

SUMMARY

EKAMINATION AREA CATGY EXAM A EOOO REMARKS 3RBIBER IDENTIFICATION ITEM NO METHOD Wit 0CEDEStB T CRMR **CALIrRATION BLOCK

f 24-?NCH HAINLINE (REF, DWG. NO. DDN-06-MI-201-2-A) f 129200 6-A-2 3-J MT NT-N-001 R2 C

Z---

VALVE TO EIA0W 39.11 UT-45S tPF-PS-902V9 RO

  • -X-i OSMSIV,EL 157-0 I

I l

e 130300 6-A-9 B-J MT NT-PE-001 R2 C

X-=*

f PENT PIPE TO PIPE 39.11 UT-OSM Ur-PB-002V9 R0 X---

CBMSIV UT-458 trf-PB-002V9 R0 X---

    • 24-CS-100-1.531-2A-PEB**

i i

130800 EDDNL-H44 F-A, B, C VT-3 NAG-CG-407 R2 C

-X--

21 DOSE JAM NUTS AND 1 BOLT HAD SPRING MANGER FO.00 VT-4 NAG-CB-407 12 X---

INSUFFICIENT THREAD ENGAGEMENT. RDf0RK I

DW, EL 148-3, 170 A2 VT-3 MAG-CG-407 R2 X..-

PER A/R # A0000850.

DW, &L 148-3, 170 AZ VT-4 NAG-CG-407 R2 X---

t l

l 130910 5+A-13 B.J NT NT-PE-001 R2 C

X---

l FIPE TO ELBOW 89.11 L"T-458 UY-PS-002V9 R0

..X.

DW, EL 157, 175 AZ f

    • 24-CS-100-1.531-2A PEB**

f l

20-INCH MANIFOLD (REF, DWG, NO. DDN-0,6-MI-201-2-A1 131730 6DDNL-813 P-A,8, C VT 3 MAG-CG-407 R2 C

X-**

NYDRAL"IC SNUBBER F0.00 DW, EL 157-2, 110 A3 l

4 i

l 131760 EDDNL-814 P - A, B, C V!-3 MAG-CG-407 R2 C

X---

l urDmA LIC SNutanR 70.00 l

DW, EL 157-2, lift AZ l

+

12-INL"M pf 8ER-LEG A (P.EF. DWG. NO. DDN-C4-MI-201-2-Al I

132400 6DDNL-H26 F-A,B,C YT-3 MAG-CG-407 R2 C

-X--

1 1008B NUT IDENTIFIED. RIWORK PER AR t

SPRING MANGER F0.00 VT-4 MAG-CG-407 R2 X-

. #A0880957.

DW, EL 157-6, 60 A2 VT-3 MAG-CG-407 R2 X---

DW, EL 157 6, 60 A2 VT-4 MAG-CG-407 R2 X---

l l

l I

i t

.v-

w.

~.

. ~... ~

- _ ~.

1 4

'l l

I I

DATE: 01/04/95 PEACH SOTTOM A300lIC POWER STATION UNIT 2 PAGE:

47 i

RB71SION:

2 INSERVICE INSPECTION

SUMMARY

~

4 i

j SBCOND INTERVAL. THIRD PERIOD, PIRST CUTAGE (94RP) j C: ASS 1 CPAusP STATUS COMPONBFTS i

PREDetATER

{

NE R

'e AME S 0BGE 4

SEC. XI T RCEP i

SUMMARY

EXAMINATION ARSA CANY EEAM A EOOO REMARKS i

4 I

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR **CALIBRAT1000 BLOCK'*

j 1

3 12-IWCN PISER-1.BG A (REF. DWG. NO. DDN-06-MI-201-2-A) 1 132050 6-AA-4 3-J MT NT-PE-001 R2 C

1**-

f PIPE TD PIPE SEND 39.11 UT-458 UT-PB-002V9 R0

+-X.

4 9

DW, BL 165, 30 AZ j

    • 12*CS-100.843 3-PBB**

i 4

j S33000 EDDNL-N30 P-A,3,C VT-3 MAG-CG-40' R2 C

X**~

l SPRING MANGER P0.00 VT-4 MAG-CG-407 R2 X-**

j DW, IL 166-8, 3 0 AZ 1

4 k

133110 EDDNL-89 P-A, B, C VT-3 MAG-CG-407 R2 C

X-**

j wrDRAULIC SNUBBaR P0.00 DW, EL 172-0, 30 A2 4

I 12-INCH RISER-1.BG B (REP, DWG, NO. DON-06-MI-201-2-A) a 5

$34450 6-AB-6 N/A' UT-4 58 UT-P5-002V9 R0 A X=

TRANS PIECE TO NCEE N/A UT-458 UT-PBM-208V0 RO

--X*

j DW, mL is9-0, 90 AZ

    • SS No. 4 "

e d

8 12-TNCH RISEP-t.EG C (REP. DWG, NO. DDN-06-MI-201-2-A) i 134850 6DDNL 86 P-A,8,C VT-3 MAG-CG-407 R2 C

1---

HYDRAULIC SNUBBER PD.00 1

DW, EL 173-0, 150 At l

12-fNCH START "P PISER iPEP. DWG. NO. DDN-06-MT-201-2-B)

I 135700 6DD-H5?(IA)

B-K-1 MT NT-PE-001 R2 C

1---

LIMITED EXAM 70 97.095 CCDE C7.TAa33 DUE INTEGRAL ATTACHMENT B10.10 TO PIPS CLAMP.

ODMSn* EL 151-0 e*,

m 1

f

-DATE: 01/04/95 PEACM BOTTOM ATOMIC POWER STATION UNIT 2 PAGE:

48 REVISION:

2 INSERVICE INSPECTION SWMARY J

SECOND INTERVAL, THIRD PERIOD, PIRST OUTAGE (94RF)

CLASS 1 CFAUIP STATUS CCMPONElrTS j

FREDWATER l

NR R

3 ASME S OEGE i

SBC. XI T RCEF SIketARY BEAMINATION AREA CATGY EXAM A EOOO REMARKS

)

N'atBER IDENTIFICATION ITEM No METHOD PROCEDURE T CRMR **CALIBRATIDN B14CK**

J k

i j

24-INCN 14ATMLINE (REP, DMG. NO. DDN-06-MI-201-2-3) i i

4 i

i 137200 6+B 10 3J MT NT-PE-001 R2' C'X---

)

f

~ VALVE TO RIA0W

-39.11 UT 45S

'UT-PS-002V9 R0 X---

DW, EL 135-0 A2 ij

    • 24-CS 100-1.521-2A-PEB**

I i

1 12-INCM RISEP-LEG E fREF. DWG. NO, DDN-06-MI-201-2-3) i

{

. 140400 6-BE-2 3-J MT NT-PE-001 R2 C

-X-.

1 LINEAR INDICATION FOUND BY MT, i

PIPE TO RIAOW B9.11 MT NT-PE=001 R2 1---

ACCEPTABLE EKAM FOLLOWING MINOR 8:*RFACE 4'

DW, BL 186-0, 270 AZ.

UT-458 UT PS-002V9 R0 X-PREPARATION. REF A/R S A0010545.

4 j

    • 12-CS-100.042 2 PEB**

j

(

t 3

i 12-TNCH RISER-LEG F fREF DWG, NO. DDN-06-MI-201-2-El

[

1 142550 6-BP 8 N/A UT-458 UT-PSM-20tVO RD A

--X*

i

?

l TRANS PIECE TO NOII N/A UT 458 UT PS-002V9 R0 X**-

DW, EL 168-0, 230 AZ l

    • SS NO.

4**

)

12-TNCH STAPT-UP RTSER (REF. DW'3. NO. DDN-04-Mb201-2-B) s 143600 6 SSU-2 8-J MT MT-PE-001 R2 C X j

TBE TO PIPE 39.11 UT-45S UT-PB-002V9 R1

--X-CBMSIV, EL 146-0

  • 12-!N"M STAPT-UP PTSFP iPRP. DWG, NO. t0N-06 *!-201-2-A) 142700 EDD-H58(IA)

B-R-1 MT NT-PE-001 R2 C

1---

LIMITED EXAM 70 85.04% COCE COVERA 33 DUE INTE3RAL ATTACHMENT B10.10 TO INTEGRAL ATTACHMENT.

j CBMSIV, EL 151-0 i

J 9

4 4

e 4

k

.n

.n.

. e DATE: 01/04/95.

PEACH BOTTOM ATONIC PONER STATIott 12rIT 2 PAGE:

. 49 s

REVISIDW 2

INSERVICE INSPECTION SI2WIARY SECOND INTERVAL. THIRD PERIOD, FIRST OUTAGE (94RF)

CIASS 1 CPAUBP STATUS COMP 001ENTS RESIDUAL MEAT REMOVAL NR R ASNE S OEGB SBC. XI T RCEP StNINARY EXANIMATICII AREA CA25Y EXAM A BOOO REMAPJCS

.3RRIBER IDENTIFICATICII ITEM NO METHOD PROCEDURE T CRNR ** CALIBRATION 9thCK

MEAD EPRAY (REF. DNG. NO. DCN-10-MI-206-15) 143250 N-17 F-A,B,C VT.3 MAG-CG-407 R2 C I---

A18CHOR F0.00 IVC, EL 178 0 143275 10-MS-4 3-J PT LP-PE 001 R4 C

X---

- PENT PIPE TO PIPE 39.11 Iff-CBM UT-PS.002V9 R1 I--.

DN, EL 178-0, 257 A2 UT-458 UT PB 002V9 R1 I--=

  • 6-88-8 0. 432-50 P55*

X---

2ND CALIBRATION 910CK: LIN 06. 432 CS ELBON TO PIPE 55.130 UT-458 UT-P8-002V9 R1

--X-DN, IL 178-2, 257 AE

  • *6-88-8 0. 432-50-P55*
  • 143500 10-MS-20 3-J NT-PE-001 R2 C

I---

  • ~

I VALVE To PIPE 39.11

^ -458 UT-PB-002V9 R1 X---

I DN

    • LIM-06.432-CS**

?

A 144075 10DCN-873 F A.3,C VT-3 MAG-CG-407 R2 C

X---

NYDRAUL2C SNURSBR F0.00 DW, EL 181-0, 257 AZ e

3 IN-LOCP A (REF. DNG, No. DE-10-MI-203-9 A) 147250 N-138 P A, B, C VT-3 MAG-CG-407 R2 C X==-

ANCHOR FO.00 SIVR, EL 139 0 Otff (RIF. DNO. No. DCN-10-MI-207-16) a 160800 10DCN-H153 F-A, B, C YT 3 NAG-CG-407 R2 C

X-.-

SPRING MANGER FO.00 VT-4 MAG-CG-407 R2 X-..

DN, EL 139-0, 135 AZ 3

i

?

b-

?

I h-u

i i:

i I

I l1TE: 01/04/95

' PEACH SOC OM ATOMIC POWER STATION UNIT 2 PAGE:

50 REVZSION:

2 INSERVICE INSPECT 1001 S'JMMARY

. SECOND INTERVAL, TKIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 1 CFAURP STATUS COMPONEN*$

)

RES2 DUAL MEAT PEMOVAL NR R

ASMS S 0EOE l

SSC. XI T RCEP.

i

SUMMARY

EXAMINATION AREA CATQT EXAM A EOOO REMARKS NtatBED IDENTIFICATION ITEM No METHCD PROCEDEstE T CRMR ** CALIBRATION BIACK**

l I

OUT (RSP. DMG. MO. DCN-10-Mf-209-16) i 165800 N 12.

F-A,3,C VT-3 MAG-CG-407 R2 C

1--*

i ANCHOR FO.00 i

NIVR, EL 13 9-0 t

i RESIDUAL MEAT REMOVAL (REF. DwG. No. DCN-10-M!-209-16) i 1

365800 10-0-17LU B-J C

No EXAM PERFORMED. NEID IS 1006 '

LONG SEAM UPSM 39.12 INACCESSIBLE, INSIDE PENETRATION.

NIVR, IL 139 0 l

)

OtTT fREF. DWG. No. DCN-10-MI-209-16) i l

865900 10-0 B-F PT LP-PE-001 R4 C

X-==

2ND CAL BLOCK: LIM-20-1.031-CS I

PENT TO PIPE B5.130 UT-0 UT-PE-002V9 RO X-==

NIVR, EL 139 UT-458 UT-PB-002V9 R0 X*--

5 NIVR, IL 139 UT.458 UT*PS 002

--X-

  • SUPP.2V5
  • *2 0-SS-6 0,812 33-PES *
  • I J

i l

I

,,,~-.- -

+

i 1

I 1

I DATE: 01/04/95 PEACH BOTTOM ATOMIC PONER STATION UNIT 2 PAGE:

51 J

REV2SION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, PIRST OUTAGE (94RP) j CLASS 1 CPAUBP STATUS COMPONENTS REACTOR WATER eLEAN-UP NR R'

)

mmE S 05GE SEC. XI T RCEP g

j CDMMARY EXAMINATION AREA CATGY EXAM A EOOO REMARKS 3

WUMBER IDENTIFICATION ITEM No METHOD PROCEDURE T CRMR ** CALIBRATION BUX3t**

4

+

r REACTOR WATER Cte m-UP fREF. DWG. No. DE-12-MI-202-2) l I

a i

j 862025 MO-2 12-68 B-M-2 VT-3 MAG-CG-401 R2 C

1...

GATE VALVE B12.50

+

f' 4

J 4

d I

I i

163075 12 I-1 N/A UT-453 UT.PB-002V9 R0 A Xe I

)

VALVE TO P2PE N/A OBMSIV, EL 158-0

]

    • 4-SS-80.337-65A PEB**

i.

9 I

162100 13DE-H34 P-A,B,C VT*3 MAG-CG-407 R2 C

X+-.

SPRING MANGER P0.00 I

OBMSIV, XL 150 0 6

4 4

]

162250 13 1-1A 3-J PT LP-PE-001 R4 C

Z...

P2PR TO ELBOW E9.11 UT 455 UT-PS-002VS R0 X-..

4 i

OBMSIV, IL 154-0 I

i

i 1

4 I

$63175 12-I-1A N/A UT-458 UT-PE-002V9 R0 A X...

3 PIPE TO ELBOW N/A i

OBMSIV, IL 158-0

  • 4 j

162198 12-2-18 N/A UI-els UT-PB-002V9 R0 C X ELBOW TD P2PE N/A OBMSIV, EL 158-0

i; i

)

163210 12-I.1D N/A TRCR PBM-UT-103 R0 A

X...

PIPE TO VALVE N/A UT-60RL PBM-UT-103 RD X...

I OBMSIV,EL 458 l

    • 09-08-47*'

1 d

i a

E m.

...y,,

DATE: 01/04/95 PEACH BOTICM ATOMIC POWER STATION 12f17 2 PAGE:

52 REVISION:

2 INSERVICE INSPECTION StBIMARY SECOND INTERVAL THIRD PERIOD, P1RST CUTAGE (94RP)

CLASS 1 CPAUBP STATUS COMPONENTS REACTOR WATER C:.RAN-UP NR R ASME S 03GE SEC. XI T RCEP

SUMMARY

EEAMINATION AREA CATGY REAM A B000 REMARKS

}

NUMBER IDENTIPICATION ITEM MQ MFIROD PROCEDURE T CRNR ** CALIBRATION 314CK*+

REAETOR WATER M 8"-UP TREF. DWG, NO. DE-12-MI-202-2) t 162230 12-1-15 N/A UT-453 UT-PS 002V9 R0 -A X...

2ND CAL BLOCKS 4-SS-XX. 674 66-PE3E VALVE TO PIPE N/A OSMSIV, EL 154-0

162250 12DE-M33 P-A,8,C VT-3 MAG-CG 407 R2 C

.X..

IJK3C OF THREAD ENGAGEMENT & "MPRCPER SPRING MANGER P0.00 VT-4 MAG-CG-407 R2-

-X-4 SETTING WAS IDENTIPIED. REWCRK PER A/R OSMSIV, EL 158-0 VT-3 MAG-CG-407 R2 I...

  1. A0000996, OSFSIV, EL 158-0 VT-4 MAG-CG-407 R2 2...

I 162320 12-!*1C N/A UT-458 UT-PB 002V9 RO A X..-

238 CAL SLOCK: 4-SS-XX. 674-66-PE3 PIPE TO VALVE N/A OBMSIV, EL 150-0

    • 4-SS 80.337-65A-PE8 ***

TN (REF. DWG. NO, DE-12-41-202-2) 162400 12-I-2 B-P PT LP'PE-001 R4 C

X*..

2ND CAL BI4CK: 4*SS-XX.674-66-PE3 VALVE TO E!A0W B5.130 UT-458 UT-PB 002V9 RO X*..

OSMSIV, EL 158-0

    • 4-CS 160. 531-27-PSB ***

162450 12 I 2 N/A PT LP-PE-001 R4 A

X-..

2ND CAL BLOCK: 4 SS-XX.674-66-PI3 VALVE TO ELBOW N/A 0T-453 UT-PB-002V9 R0 X.

OBMSIV, EL 158-0

    • 4-CS 160.531-27-PEB ***

OUT ' PEF. DWG. No. DCA-12-MT-201 1) 163201 12-0-801 3-J UT-0 UT-PB-002V9 R1 P Z.

PIPE 70 VALVE 29.11 UT-453 UT-PB-002V9 R1 X...

DN

    • 6-SS-80.432-50-PEB**

I f

i

+

m.

. DATE: 01/04/95 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 PAGE 53 REVISION: '

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 1 CFAUSP STATUB COMPONENTS REACTOR NATER CLEAN-UP NR R ASME S 03GE SEC. XI T RCEP CUMMARY EXAMINATION AREA CATGY.

EXAM J. ' E o O O ' REMARKS NtSIBER IDENTIFICATION ITEM NO METHOD PROCEDIRE T CRMR ** CALIBRATION BIDCE**

OUT (REF. DMG. NO. DCA-12-MI-201-1) 563203 12-0-802 3-J UT-0 UT-PS-002V9 R1 P X-**

VALVE TO PIPE 39.11 UT-455 UT-PS-002V9 R1

-.X..

]

DN -

1

    • 6-88-80,432-50-P53**

l 163700 12-0-25 8-J PT LP-PE-001 R4 C

X---

ELBON TO PIPE 39.11 UT-458' UT-PS-002V9 RO X---

I DN, EL 167-0, 110 A2

    • 6-88-80,432-50-P58**

I i

i 163750 12DCN-87 F-A 3,C VT-3 MAG-CG-407 R2 C

X--'

HYDRAULIC SNUBSER FO.00 DW, IL 167-4,90-120A I

1 164050 12DCN-85 F-A, B, C VT-3 MAG-CG-407 R2 C

X--+

)

HYDRAULIC SNUBBER F0.00

)

DN, IL 167-4,90-120A

]

I 164800 12DCN-H14 9 (IA) '

B-K-1 PT LP-PE-001 R4 C

X---

LIMITED EXAM 70 76.60% CCCE C VERA3B DUE j

INTEGRAL ATTACHMENT B10.10 70 PIPS CIAMP.

]

DN, EL 176-6,90-120A REACTOR WATER CLEAN-UP f 7EF. CWG. NO. CE-12-MI-203-4) 165218 12 OS 4M N/A UT-0 UT PS-002V9 R0 A X-HX N/A UT-45S UT-PB-002V9 R0 Xa REGEN HTX, EL 165-0

  • *4 SS-8 0.33 7 6 5 A-PEB *
  • REACTOR WATER CLEAN-UP fREF. CWG. NO. CE 12-MI-203 6) 165366 12-14-19 N/A UT-45S UT-PB-002V9 R0 A X--.

VALVE TO PIPE N/A OBMSIV, IL 154-$

    • 4-SS-80. 337-65A-FIE**

i

... _ -. _. -.....= -

__m m._.

q t

- DATE: 01/04/95 PEACH 30ZW M ATONIC POWER STATION UNIT 2 PAGE:.

54 CEV2SION:

2 INSERVICE INSPECTION

SUMMARY

SECCND INTERVAL. THIRD PERIOD, FIRST OtTTAGE (94RP)

CLASS CPAURP STATUS COMPONENTS f

REACTOR NA.*RE CLEAN-UP NR R ASME S-0EGE

'I SEC. XI T-RCEP StastARY BEANINATION AREA CATGY EXAN A EOOO RENARKS i

NtNISER IDEIFTIFICATIcel.

ITEN NO NETHOD PROCEDURE T-CRNR **ChLIBRATICII SIAM:h**

l l

REACTOB NATER CLEAN-UP fREP, DWG, NO, DE-12-MI-203-6) 165367 12 14-5 N/A UT-458 UT-PB-002V9 R0 A X-l PIPE TO 3140N N/A UT-0.*

UT-PB ;02VS RO X...

OSNSIV, EL 156-6 UT-45

  • UT-PB-002V9 R0
    • X.

i OSIISIV. EL 150-6

  • SUPPLEN.
    • 4-SS 80.337-65A-PEB**

j

. 165360 12 14-17 N/A' UT-0 UT-PB-002V9 RO A X----

PIPE TO 3140W N/A '

UT-458 UT-PS-002V9 R0

.--X-5 i

    • 4 SS-80a.337-65A PE5**

865301 12-14-18 N/A UT-0 UT-PE-002V9 R0 A X-.*

E130W TO PIPE N/A UT-458

' UT-PB-002V9 RO

'X--..

    • 4-SS 80.337-65A-PER**

REACTOR WATER C1.EAN-UP IREP. CWG. NO. PE-12-MI-203-4) l 4,

165359 12-07-8 N/A UT-0 UT-PB-002V9 R0 A X.--

PLANGE TO PIPE N/A UT-458 UT-PB-002V9 RO.

X-

f 1

165390 12-07-9 N/A UT-0 UT-PB-002V9 RO. A X*--

PIPE TO PLANGE N/A UT-455 UT-PS-002V9 RO X*-*

165391 12-07-10 N/A UT-0 UT-PB-002V9 R0 A X-I PLANGE TO PIPE N/A UT-458 UT-PB-002V9 R0 X---

j

)

    • 4-SS 80*.337-65A-PEE **

(

4 1

1 I

-. ~ -

~.. ~

b 2-DATE: 01/04/95 PEAOt BOTTON ATONIC PONER STAT 10011281T S PAGE:

55 R5"f8810N:

2 INSERVICE INSPECION SI5utARY SECOND INTERVAL, THIRD PSRIOD, PIRST OUTAGE (94RP)

CLASS CPAURP STATUS COMPOWE3fTS REACTOR tlkTER CLEAll-UP NR R y

ASNE.

5 05OE-SEC. XI -

T RC3P SUNItARY EXANINATION AREA

-CATGY EXAM' A3000 REMARKS NUMBER IDENT1FICATION

'ITEN NO METHOD PROCEDURE T CRNR **CALIBRATICH BIACK'*

1

(.

mr*f0R ttATER CLEAN-UP (REP. DNG. 10 0. DB-12-Nf-203-4) 165292 12 07-31 N/A UT-0 UT-PB-002V9 R0 A X---

PIPE TO ELBON.

N/A UT-458 UT-PS 002V9 20 X--a i

    • 4-SS-80.337-65A-PBB**

)

j 165394 12-08-2 N/A f#- 0 UT-PB 002V9 R0 A'X---

PIPE TO ELBON N/A UT-458 UT-PB 002V9 R0 Xa - - -

)

' l s

    • 4-SS 80. 337-65A-PBB**

i J

l REACTOR IIATER CLEAN-UP f REP. DNG. HO. DR-12-NT-203-l) 165437 12-10-9 N/A UT-0 UT-P3-002V9 R0 A X---

j VALVE TO PIPS N/A UT-458 UT-PB-002V9 R0 X*--

1

.r I

    • 4-SS-80 337-65A-P'B5**

1

. I 165439 12-10-11 N/A t?;-0 UT PB 002V9 R0 A X--a j

ELBON TO PIPE N/A CT-458 UT-PB-002V9 20 X..*

    • 4-SS-60.337-65A PBB**

i 3

t

~ I 1

1

~

- ~

<me-r rv ws r wvx wm

-n.'-w-~'--

"w*

~'sv t = ' ~~'

j v

e 4

DATBs 01/04/95 PEACH SCITOM ATOMIC PONER STATION UNIT 2 -

PAGE:

55 REv!SION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, PIRST CUTAGS (94RF)

CLASS 1 CFAUBP STATUS COMPONENTS

)-

REACTOR CORE ISCIATION COOLING F

NR R

ASME S O E G E' SEC. XI T.R C E P St2MIARY EIAMINATION AREA CATGY EIAM A EOOO REMARKS NUMBER IDENTIFICATICII ITEM No METHOD PROCEDURE T CRMR ** CALIBRATION BEDCK

l IN (REF. DMG. NO. DDM-13-MI-201 1) l 165446 MO-2-12-21 3-N-2 VT-2 MAG-CG-407 R2 C

1---

GATE VALVE B12.50 j

i 155800 12 2 6 5-J MT Irr-PE-001 R2 C1.-

PIPE TO TER 39.11 fff-458 IPF-PB-002V9 RO

- 4 OBMSIV RM, EL 152-0

    • 4-CS-150.531 27-PEB**

t i

)

i a

l I

1

. ~... _,.

+

l, I'

I 6

D43. 01/04/95 PEACH BOTTOM ATOMIC Pr" ER STATION UNIT 2 PAGE:.

57 i

REUISION:

2 INSERVICE IGPECTION

SUMMARY

SECOND INTERVAL. T%RD PERIOD, PIRST OUTAGE (94RF) i CLASS 1 CFACEP STATUS COMPONENTS f

COBE SPRAY NR R

ASME S 0EGE SEC. XI T RCEP f

SUMMARY

EXAMINATION ARIA CATGY EXtM A EOOO RSMARKS t

NUMBER IDENTIFICATIDW ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION B1bCK**

i Ih0F A (REF. DWG. NO. DCN-14-MI-203-5-B)

I 867500 14-A-12 B-F PT LP-PE-001 k4 C

I**-

2ND CALIBRATION ELOCK: LIM-12.644-38 PIPE TO PIPE B5.130 UT-458 UT-PB-002V9 R0

--X-DW, IL 143,A2 110

    • 12-CS-100.043-3 PEB**

+

867530 14DCN-H74 (IA)

B-K-1 MT NT-PE-001 R2 C

X---

INTEGRAL ATTACHMENT B10.10 DW, IL 146-0,90-120A l

167560 14DCN H74 P-A, B, C VT-3 MAG-CG-4C7 R2 C

X---

I SPRING MANGER FO.00 YT-4 MAG-CG-407 R2 X---

DW, IL 146-0,90 120A 169410 14-A-28 B-F PT LP-PE-001 R4 C

X---

23C CALIBRATION BIACK: LIM-12 684*88 PIPE TO PIPE Bl.130 UT-458 UT-PB-002V9 RO

--X-DW, EL 149-2, 100 AZ

    • 12 CS-100.843 3-PRB**

+

t 169480 14-A-2tLD BJ PT LP-PR-001 R4 C X --

IANG SEAM DNSM 89.12 UT-458 UT-PB-002V9 R0 3 --

DW, EL 148-2, 100 AE

    • 12-SS-43. 687-12 PSB**

l l

169604 14DCN-S23 F-A,B,C VT-3 MAG-CG-407 R2 C

X-==

HERAULIC SNUBBER FO.00 DW, EL 172 3,90-120A LOOP 9 fptF. DWG. NO. CCN-14-MT-2ch t-A) 169800 14-B-3 B-J PT LP-PE-001 R4 C

X-*=

PENT PIPE TO PENT B9.11 UT-0 UT-PB-002V9 R0 X---

UT-458 UT*PB-002V9 R0 X-=*

    • 12 SS-80.687-12-PEB**

l i

i l'

l

+..

. ~.

-~

9 4

n

(

k i

DATE: 01/04/95 PEACH EOTTON ATOMIC PONER STATION tafIT 2 PAGE:

50.

RSYISION:

2.-

INSERVICE INSPECTION SINNLARY SECOND INTERVAL, THIRD PERIOD, PIRST CUTAGE (94RF)

CLASS 1 CPADEP STATUS CCMPONENTS

[

CORE SPRAY e

l i

NR R ASME S OEGE SEC. XI T RC37 i

f 5

StJHNARY EXAMINATION AREA CATGY IIAM A EOOO REMARKS 1

NUMBER IDENTIFICATION ITEN ND' NETHOD

- PROCEDURE T~CRNR ** CALIBRATION ELOCK'*

IDOP 3 (REF. DMG. NO. DOf-14-MI-203-5-Al i_

t l

172897 14DCN-H75(IA)

E-K-1 PT

. LP-PE-001 R4 C-X--.

I INTEGRAL ATTACHMBarf 310.10 i

DM, EL 161-9, 240 AZ 2

+

t k

i 4

i~

t i

a 3

a I

1 2

3 4i I.

(

D I

i T

J s

.d 1

1, 4

1 1

4 4

1 J

4 4

4 v

-~

s.>n.

-y

s e.

D-~

k.

DATBt 01/04/95 PEACH BOTTCM A'!VMIC POWER STATION UNIT 2 PAGE:

59 RE*ISION: -

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 1 CFAURP STATUS CCMPONEFTS N20H PRESSURE COCLANT INJECTICN P

NR R

ASME S 05GE SEC. XI T RCEP 3

SUMMARY

EXAMIMATION AREA CATGY EIAM A EOOO REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE T CRMR ** CALIBRATION 314CK**

2 OtFT fREF. DWG. NO. DBN-21-MI-203-6) 174050 23 DEN-M52 F. A, B, C VT 3 MAG-CG-407 R2 C

X*--

SPRIN3 MAMGER F0.00 VT-4 MAG-CG-407 R2 X-DW. E* 151-11 174360 23DBN S22 F A, B, C VT 3 MAG-CG-407 R2 C

X---

HYDRAULIC SNUBBER F0.00 DW, EL 149-0 1

174300 23DBN-M51(IA)

B-K 1 MT MT-PE-001 R".

C X---

LIMITED EXAM TO 64.92% CCCE COVERAGE DUE g

INTEGRAL ATTACHMENT B10.10 TO PIPE CLAMP.

DW, EL 147 0 3

874400 23DBN-M51 F-A, B, C VT-3 MAG-CG-407 R2 C

X---

i

)

SPRING MANGER F0.00 VT-4 MAG-CG-407 R2 X---

OW, EL 147-0 t

174600 23-0-13 B-J NT MT-PE-001 R2 C

X---

I PIPE To VALVE 89.11 W-0 UT-PB 002V9 R1 X-..

DW ITT-4 58 UT-PS-002V9 R1 X.

    • LIM-10.593-CS-R**

174650 MO-2-23-15 B-M 2

    • T-3 MAG CG-407 R2 C

X---

GATE VALVE B12.50 DW, MIGM PPESSURE C00L INJ fREF. CWG, No. CBN-21-MI-201-6) 175080 23*0-17B B-J MT MT PE-001 R2 C

X*--

PENT TO PENT PIPE 89.11 17; 0 UT-PB-002V9 R0 X---

DW, EL 139 177-458 UT-PB-002V9 R0 X-

    • 10-CS-90.593-7A-PEB**

4 I

a i

...e DATE: 01/04/95 PEAQt 301TCfl ATOMIC POWER STATION UNIT 2 PAGE 60 RE72SION:

2

INSER71CE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD FERIOD, FIRST OUTAGE (94RP)

CLASS 1 CPAUEP STATUS COMPONElfTS HIGH PRESSURE C00!JGrf INJECTION NR R

ASME S 0303 SEC. XI T RCEF

SUMMARY

EXAMINATION AREA CATGY EXAM A BC00 REMARKS

  • NUMEBR IDElff1PICATION ITEM NO METHOD PROCEDURE T-CRNR ** CALIBRATION BIOCK'8 OUT fREF. DMG. MO. DEN-23-MI-203 6) 175350 MO-2-23-16 E-M-2 VT-3 MAG-CG 407 R2 C

X---

GATE VALVE E12.50

~.,%-+w-,

e4-=.w-,

q

~

e.

t e

i DATE: 01/04/95 PEACH BOITCM ATOMIC POWER STATION UNIT 2 PAGE' 61 LEVISION:

2 INSERVICE INSPBCTION SJMMARY 1

SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RP) i CLASS 1 CFAUBP STATUS CCMPONENTS MAIN RECIRCUIATION f.

NR R ASME S 05GE

,f SEC. XI T RCEP CUMMARY RXAMINATION AREA CATGY EXAM A EOOO REMARKS MUMBER IDENTIP! CATION ITEM NO MB1HCD PROCEDURE T CRMR ** CALIBRATION B!4CK**

f IACP A (REF. DWG. NO. ISI-2-02-1) 4

~

j 176340 PUMP A (CIS)

'B-L-2 VT-3 MAG-CG-407 R2 C X 20' 0F NATER EXISTED IN PUMP CASING.

CASING INTERNAL SURF B12.20 EXAMINED WITH BINCCULARS.

3 DW, EL 91-6, 315 A2 4

1 l

-l i

]

176400 PUMP A (PRB)

B.G-1 UT.0

- UT-PBM-107VO RS C. - *.K 2

PRESS-RETAINING BLTS B6.160 DW, BL 91-6, 315 A2

    • LIM-3-STUD-11-CS**

2 d

I s

i 176450 PUMP A (FS)

B-G-1 VT-1 MAG-CG-401 R2 C

X...

EXAMINED WITH BINOCULARS.

~

FLANGE SURFACES BE.190

?

DW i

i 1

176475 PUMP A (NSW)

B-G-1 VT-1 MAG-CG-407 R2 C

1-..

{

NUT, BUSHING & WASHER 86.200 g

DW, EL 91-6, 315 AZ 1

I J

176875 SS2A F-A, B, C VT 3 MAG-CG-407 R2 C

X-..

]

HYDRAULIC SNUBBER FO.00 DW, EL 126-8, 315 AZ MAIN FICIPCULATICM (PIF. CWG. NO. 181-2-02-15

'177456 8833

' F A, B, C VT 3 MAG-CG-407 R C

Z*

MYORX?IC SNUBBER F0.00 DW, IL 135-0, 135 A2 LOCP 9 (PEF. DWG. No. TSI *-C{-$1 177400 H15B (IA)

&-A.

FT LP-PE-001 R4 C

1...

INTEGRAL ATTACHMENT B10.20 j

DW, EL 12 6 -8, 135 A2 ee,ee i

l i

i

-- ~

ew

]

.- l DATE: 01/04/95 PEACH BOTTOM ATOMIC POWER STATION UNIT 2.

PAGE:

62 REVISION:

2 IN85RVICE INEPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF) 1 CIASS 1 CFAURP STATUS COMPONENTS MAIN RECIRCUIATION NR R-l 1

ASME' S OEGB SEC. XI

-T RCEP.

I I

SUMMARY

EXAMINATION AREA CATGY EKAM A EOOO REMARKS l

2 NUMBER IDENTIFICATION ITEM NO METHOD PROCEDtEtB T CRMR ** CALIBRATION S!bCK'*

1 140P 3 (REF. DWG. NO. ISI-2-02-21 178235 SS6B(IA) 8 K-1 PT LP-PE-001 R4 C

1---

INTEGRAL ATTACHMENT 310.20 DW, EL 126-8, 135 A2 ee,ee i

1

)

178400 H168/SSIB(IA)

B-K-1 PT LP-PE-001 R4

- C X---

INTEGRAL A*.TACHMENT 510.30 DW, IL 126-8, 135 A2 ee,ee 1

i e

i i

i i

I y.,-

,s y

n-

DATE: 01/04/95~

PEAOi SOTTOM ATOMIC PONER STATION UNIT 2 PAGE:

63 RE'f2SION 2

INSERVICE INSPECTION

SUMMARY

SECOND IlfrERVAL THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS I CFAURP STATUS COMPONENTS REACRMt PRESSURE VESSEL NR R ASME 8 05GE SEC. XI T RCEF

SUMMARY

EXAMINATION AREA CATGY EXAM A EOOO RWLARKS NUMBER. IDarf!PICATION ITEM NO NETHOD PROCEDURE T CRNR ** CALIBRATION BLOCK

in-i=wnaniaTION NOEELES fREF, DNG, NO. T$I-2-RV-01) 170540 INSTR NOIE 55 VT-2 ST-J-080 675 2 C 1+.a - PERFORNED IN CONJUNCTION WITH THE RPV N11A,8 N12A,8 N16A,8 84,13 LEAKAGE TEST,

\\ --

.. _ ~

..... ~.. -

4 l

e.?

.O s

t i

4 a'

1

. DATE: 01/04/95 PEACH SOTTOM ATOMIC PONER STATIcel tEf!T 2 PAGE:

64 I

BE71810Ns 2

INSERVICE INSPECTION StBERARY i

SECOND INTERVAL, THIRD PERIOD, FIRST CUIAGE (94RF)

J l

CLASS 1 CFAURP STATUS CON N S SYSTEM PRESSURE TESTS

.NR R'

1 ASME S OEGE SEC. XI

' T RCEF

SUMMARY

BEAMINATION ARIA CATGY EXAM A EOOO REMARKS I

WUBIEER IDENTIFICATION.

ITEM No METHOD PROCEDURE T C R R R.** CALIBRATION 3140C'*

3-

- i i

I RPVf Pfeinaf Pumner Valves f

170550 CLASS 1 LEAKAGE TEST E-P YT 2 ST-J-080-675-2 C

-X--

]

PRES $tStB ESTAINING BOUNDARY B15.50*

l i

i.

4 4

4 4

1 b

i N

(

4 i

i i

E i

i 1

1 4

i e

y i

3 1

1 4

1 d

e i

t

... ~., -.,..

r y

y

-.7-

t e.

i e

I.

DATE: 01/04/95 PEACH BOTTOM AIVMIC POWER STATION UNIT 2 PAGE:

65 RE71SION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL I1tIRD PERIOD, FIRST OUTAGE (94RF)

CLASS 2 CFAURP STATUS CCMPCNENTS RESIDUAL HEAT REMOVAL NR R

t ASME S OEGE SEC. XI

.T RCEP

SUMMARY

EXAMINATION AREA CATGY EXAM A EOOO REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDERE T CRMR ** CALIBRATION BLOCR**

i l

(REF. DWG. No, ISI-2-10-1) 200820 RHREX-B-LS P A, B, C VT-3 MAG-CG-407 R2 C

X---

LOWER SUPPORT FO.00 B RHR RM, EL 91 6 1

200825 RNR}Lt-B -US1 F-A. B. C

  • T-2 MAG-CG-407 R2 C

X---

UPPER SUPPCRT 1 FO.00 B RHR RM, EL 116-0 I

l 1

200830 RHREX-3-US2 F-A, B, C VT-3 MAG-CG 407 R2 C

X---

UPPER SUPPORT 2 F0.00 j

B RHR RM, EL 116 0 INTEOPALI.Y-WDED VSL $*'.P*F IRRF. DWG. No. IS!-2-10-11 i

201300 RHRMX-B-US2(IA)

C-C MT MAG-CG-403 R2 C

X---

INTEGRAL ATTACHMENT C3.10 B RHR RM, IL 116-0 201400 RHREX-B-LS (IA)

C-C MT MAG-CG-403 R2 C

X---

INTEGRAL ATTACHMENT C3.10 B RHR RM,EL 91-6 HEAD SP'AY (FE?. DWG.

N" GB-10-MI-206-141 202900 10-2HS6-1 C-F MT MT-PS-001 R2 C

X-REDUCER TO PIPE C5.11 SIVR, EL 158-4 202950 10GB M154 F-A,B,C

%T-3 MAG-CG-407 R2 C

-X-.

SUPPORT NAS MISALIGNED. RTatRKED Ah"D SPRING MANGER F0.00 VT-4 MAG-CG-407 R2 X

-- SATISFACTORILY REXXAMINED.

SIVR, IL 158-4 VT-3 MAG CG-407 R2 1-SIVR, EL 158-4

%T-4 MAG-CG-407 R2 X--.

I U

a y

p -

v a

. _. -. ~. _.

..m i

f a

i.*

a DATE: 01/04/95 PEAQt BOTICM ATOMIC POWER STATION IntIT 2 PAGE:

46

' REVISION:

2 INSERVICE INSPECTION

SUMMARY

f SECOND INTERVAL. THIRD PERIOD, FIRST OtFTAGE (94RF)

[

CLASS 2 CFAURP STATUS CCMPONENTS 4

j W IDUAL MEAT REMOVAL NR R

l AsMr s OEGE.

i SEC. XI T RCEP 4

COMMARY EXAMINATION AREA CATGY EXAM A EOOO REMARKS I

J i

NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C R M R '** CALIBRATION BL0ctee-4 s

j MEAD SPkAY GtEP. DWG. No. GB-10-MI-204-14) i k

j 204000 10-2HS6-18 '

C-F MT NT-PE-001 R2 C

X-*-

i ELBCW TO PIPE C5.11 IVC, EL 178-0

' i 1

e.,ee 1

i Colf*AINMarr SPRAY IN LOCP A (REF. DWG. No. GB-10-MI-20$-13-A) i

}

207350 10GB H131A

- F-A,B,C VT-3 MAG-CG-407 R2 C

1-'**

. l

{'

i SPRING HANGER F0.00 VT-4 MAG-CG-407 R2 X-++

1 SIVR, EL 158-4

)

4

.I l

207t&1 10-2CSIA12-22 C-F MT NT-PE 001 R2 C

X++=

f TBE TO PIPE C5.11 I

IVC, IL 168-1 8

1

]

ee,ee l

i 1

FUEL PTL C00LAlff-LOCP 3 fREF. DWG. No. GB-10-MI-20$.13-9) i 2

i q

309100 10+2FPCB16-8 C-F PT MAG-CG-402 R2 C

X*=*

ELBCW TO PIPE C5.11 i

TC-SEG 06,EL 126-8 e..ee i

i d

i 1

TCPUS-IN-LOOP A (PEF. OW1. NO. GB-10 4'!-2 04

.0- A)

)

J 4

1j 310800 10GB-H61 F.A, B, C VT-3 MAG-CG-407 R2 C

X-i RIGID RESTRAI!C F0.00 TC-SEG 12, EL 109-4 4

4 7

811100 10GB-813 F-A. 8, C VT-3 MAG-CG-407 R2 C - X * -- 1 LOOSE N*."I WAS PC::ND CN IASE PLATE.

RIGID RESTRAINT F0.00 VT-4 MAG-CG-407 R2 X**-

REWORK PEAPORMED CN AR #A*S*1806 AND TC-SEG 12 EL 111*4 VT-3 MAG-CG-407 R2 X--a RE-EKAMINED SAT.

I i

t i

)

i l

is t

3

)

ii J

4

- +. - - -

w e

n,.

,e..-

e..

w-.

.. ~,,, -

.m, a

w v.

.,-.a

j e

)

I o

DALM t 01/04/95 PEACH BOTTCM ATOMIC PONER STATION UNIT 2 PAGE:

67 REVISION:

3 INSERVICE INSPECTION SCMMAJtY SECOND INTERVAL, THIRD PERIOD, FIRST OUTAGE (94RP)

C: ASS 2 CFAUEP STATUS CCMPCNENIS PESTDUAL MEAT REMOVAL NR R

ASME S 0EGE

$$C. XI T RCEP

SUMMARY

EXAMINATION AREA CATGY EXAM A BC00 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION BLOCK **

]

l 1

TOPUS-IN LOOP A (P EP, OWG. NO. GB-10-MI-204*11-Al 311410 10MO-M98 P-A, B, C W-3 MAG-CG-407 R2 C

1---

SETTING FOUND OUT OF RANGE. R3 WORK PER SPRING MANGER FO.00 VT-4 MAG-CG-407 R2

-X-*

AR # ACB71801.

TC-SEG 12 EL 122-4 1

1 l

SM**""CWN COOL SUN I.0C P D iPEP. DWG. NO. HB-10-MT-201-2-D) l 331600 10-2SC3D20-6 C-F MT MAG-CG-403 R2 C

-X--

A 5/8* LON3, 1/16" CEEP GCU3I WAS PIPE TO ELBOW C5.11 VT-1 MAG-CG-401 R2

-X--

IDENTIFIED CN NELD.

NCR 94-!221 NAS GENERATED. INDICATICNS NERE OE* ERMINED TO BE ACCEPTABLE.

DISCMAPGE-LOOP A (PEF. DWG. NO. GB-10-MI-202-3-Al 224330 10MO-H501 F-A, B, C VT-3 MAG-CG-407 R2 C

X---

SPRING HANGER FO.00 VT-4 MAG-CG-407 R2 X...

A RHR RM, EL 98-2 DISCMAPGE-LOOP B fPEF. CWG. NO. GB-10-MI-202-3-9) 226200 10-2CB20-11 C-F MT MAG-CG-403 R2 C

X---

EE.BCN TO FIPS C5.11 B RHR RM,EL 94-6

    • ,ee DIS-uAp;g.toep e <pgy. ;wg. po, c3.go.MI-202-7-Ci 327600 10-20C20-7 C-F MT MAG-CG-403 R2 C

X--.

VALVE TO PIPE C5.11 C RER RM, EL 44-6

.*,ee 1

2*t300 10GB-812 P-A,B,C VT-3 MAG-CG-407 R2 C

X---

HYDRAULIC SNUBBER F0.00 C RHR RM, EL 97-6 1

1 j

4 I

e i

DATE: 01/04/95 PEACH BOITOM ATOMIC POWER STATION UNIT 2 PAGE:

68 REV!SION:

2 INSERVICE INSPECTION

SUMMARY

l SECOND INTERVAL, THIRD PERIOD, FIRST CLTAGE (94RF)

CLASS 2 CFAUSP STATUS COMPCNENTS PESIDUAL MEA? PEMOVAL NR R

ASME S OEGB SEC. XI T RCEP CUMMARY EXAMINATION AREA CATGY EXAM A EOOO REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR *, CALIBRATION B:4CKee DISCMARGB-LOOP C (PEF. tWG. No. GB-10-MI-202-3-C) l 228400 10GB-S51 P-A,B,C VT-3 MAG-CG-407 R2 C

X-..

HYORA:':.IC SICBBER F0.00 C RER RM, El 90-6 I

MEAT EXO?MNGU CtT LOOP A (PEP. DWG. NO. GB *0-MI-202-4-Al 23247,0 10-2XA:20-0 CF MT MAG-CG-403 R2 C

X-VALVE TO ELBOW C5.11 l

A RER RM,RL 100-5 ee,ee l

t I

232900 10GB-H52 F-A. B, C VT-3 MAG-CG-407 R2 C

X...

SETTING PCUND OLT OF PANGE. REWCRKED SPRING MANGER F0.00 YT-4 MAG-CG-4b7 R2

.X..

PER AR #A?t73205 AND RE-EXAMINED SAT.

l C RER RM, EL 106-5 VT-4 MAG-CG-407 R2 X...

i i

i HRAT EXCMANGER OtTT LOOP C (PEF. DWG. NO, GB-10-MI-202-4-C) 235300 10GB-H53 F-A,B,C VT-3 MAG-CG-407 R2 C

X-..

SPRING MANGER F0.00 VT-4 MAG-CG-407 R2 X...

l C RHR RM, EL 123-6 335700 10GB-H54 F-A,B,C

  • 7-3 MAG-CG-407 R2 C

X..

RIGID RESTRAINT F0.00 l

C RHR RM, EL 120-6 HEAT EX5.ANCEP Ot T LOCP D fPEF-CWG. NO. GB

-MI-202 4-D) 236000 10-2XD020-14 C-F MT MAG-CG-403 R2 C

X...

TEE TO FLANGE C5.11 B RHR RM, EL 106-5 ee,ee Coh TAI *Ffff SPRAY IN LOCP A f PEF. DWG. NO. GB-10 itI-203-7-A) 238300 10GB-H67 P-A, B, C VT-3 MAG-CG-407 R2 C

X...

SPRING MANGER F0.00 VT-4 MAG-CG-407 R2 X...

l TC-SEG 15, EL 120-6 l

i r

i f

. - - ~

o l

i.

l DATE: 01/04/95 PEACH BCTTOM ATOMIC POWER STATION UNIT 2 PAGE:

69-i REVISION:

2 INSERVICE INSPECIION

SUMMARY

SECOND INIERVAL. THIRD PERIOD, FIRS? OUTAGE (94RF)

CIASS 2 CFAUBP STATUS CCMPONENTS RESIDUAL HEAT REMOVAL WR R

e ASME S 08GB SEC, XI T RCEP CUMMARY EXAMINATION AREA CATGT EXAM A EOOO REpWtKS f

l Nt2ESER IDENTIFICATION ITEM No METHOD PROCEDURE T C R N R. ** CALIBRATION BIACK**

CONTAfmeNT SPRAY IN Th0P A tREP. DWG, No. GB-10-MI-203-9-A) i l

238400 10-2CSIA24-2 C-F MT MAG-CG-402 R2 C

Z-*-

j PIPE TO TBE.

C5.11 l

l C RHR RM,IL 120-6 l

ee.ee t

l 239300 10GB-M55 F-A,B,C VT-3 MAG-CG-407 R2 3

X-.-

DUE TO REPAIR OF 1035-H12 l

SPRING MANGER F0.00 VT-4 MAG-CG 407 R2 X-**

i 6

f i

C RMR RM, EL 120 6 t

t i

1 239500 10GB-H16 F-A,3, C VT-2 MAG-CG-407 R3 C

X---

i SPRING HANGER FO.00 VT-4 MAG-CG-407 R2 X--*

TC-SEG 14, EL 120-0 PUMPS (REF. DWG. No. 137-2-10-2) l 254600 PUMP-E-8C F-A,3,C TT-2 MAG-CG-407 R2 C'X--

INSULATED SUPPCRT COMPONENTS F0.00 a RHR RM, EL 91-6 I

I I

I i.

l 1

I i

,.~...

e n

~,a s

m....

t l,.

4 I

P 4

f 5

PAGE:

70 DATE: 01/13/95 PEAct 30TICM AtenIC POWER STATION tBtIT 2 REVI*IDW 2

INSERVICE INSPECTION

SUMMARY

SECOIS IW&ltVAL. THIRD PERIOD, FIRST DUTAGE (94RF)

I class 2 CFAUBP STATUS COMPCNEFfS MAIN stem NR.

R y

J

.ASMS S 0EGE l

SBC. XI T RC3P f

SuMnART Exm IxATION m EA CATGT EXAM A E o 0 o. REMARx8 WINIBER IDRIrf!PICATION

' ITEM 900 METHOD 9"We r T CRMR ** CALIBRATION 31dM:R**

l

}

3 MAIN STEast (RAF. TMfG. NO. DB-01 -MI-2 01 C) 1 a

y i

274275 1-2C26 23LU CF MT IIT-PB-001 R2 C

X*.=

^'

LONG SEAM UPSM C5.22 UT-0 UT-PS-002V9 R1 X***

M SEP AREA.EL 152-6 07-452 UT-PS-002V9 R1 X--=

  • *2 6-CS-X 1. 06-2 8 PIS* *

)

d MAINI.INE LOCP C (RIF. CWG NO. CB-01-M!-201-2-T l

274400 1-3 C2 6-23 C-F MT' NT-PE-001 R2 C

X---

0 DEG - 2 SPOT INDICATION 8; A 2* I,1NEAR

{

PIPE TO ELBOW C5.21 W0

' UT PS 002VS R1

- X -

INDICATICN ItAS FOUND BY MT CUTSIDE THE M SEP ARIA.EL 152-6 W-4 58 UT PS-002V9 R1

--X-REQUIRED EXAM AREA AT 16' C'd FROM TDC.

d M SBP ARRA,EL 152-6 THE INDICATIcel14CATED 1.5* UPSM OF TOR.

l REBXAMINE INDICATICNS DURING THE NEXT j

REFUBL OUTAGE AND DISPOSITICII i

ACCORDIteGLY.

    • 26-CS-X-1.06-28-PES **

f i

4 i

274430 1-2C26-23LDI C-F MT Irf-PB-001 R2 C

X-14NG SEAM DNSM EL IR C5.22 UT-0 UT-PS-002V9 R1 X---

j M SEP AREA,EL 152-6 U* 4 58 Ur-PB 002V9 R1 X**-

}

    • 26-CS-X-1.06 28-PBS**

l-4 274460 1 2C26-23LDO C-F MT NT-PS-001 R2 C

X---

8 LONG SEAM DNSM EL OR C5.22 UT-0 Ur-PB-002V9 R1 X.--

4

{

M SEP AREA,EL 152-6 U* 4 55 UT-PB-002V9 R1 X---

j

    • 26-CS-X-1.06-28-fEB**

l 1

4 MAINI.!NE LOOP D (F EF. SW3. NO EB-01-M!-201-2-!'

1 5

276350 1DB-S2A F-A,B,C VT 3 MAG-CG-407 R2 C

X.--

4-4 MYDRX.7LIC SNUERER F0.00 l

FW HT MEZ3, EL 159-4 i

I i

l j

l 276520 1DB-H3 F-A, B, C VT-3 MAG-CG-407 R2 C

X---

RIGID RESTRAINT FO.00 FN HT MEIE, EL 149-4 4

4 4

4 4

4 4

9 i

k v

---_.y y

.. ~

1 I,

{

e

.j b

DATE 01/04/95 PRACH BOTTCM ATOMIC POWER STATION UNIT 2 PAGE:.

71 l

REVISION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 2 CFAUSP STATUS COMPONENTS MAIM STEAff 1

l NR R Aus 8 oaGs i

SBC. 12 T RCEP CUMMARY REAMINATION ARRA CATGY EXAM A BC00 RBILARKS

!r g.

IIUMBER - IDENTIFICATION ITEII 300 METMcD PROCEDURE

'T CRMR ** CALIBRATION B!but**

{

b IRAINLINE LOOP D (REF. DWG. No. DB-01-MI-201-2-Dn i

276240 1DS-H6 F-A,8, C VT-2 MAG-CG-407 R2 C

X-**

i RIGID RESTRAINT F0.00 I

FW KT MEZE, EL 149-4 1

277020 1DB-H10 F A.8,C VT-2 MAG-CQ.407 R2 C

X+*

DIOTG TYPE INDICATION FOL7C ON NBLDLESS a

SPRING HANGER F0.00 VT-4 MAG-CG.407 R2 X. -. STRIIUT. EYE NUT NAS REPLACID PER AR l

M SEP AREA, EL 149-4

  1. A000$$91 AND REEIAMINED.

4 l

l i

i L

6

.L r

F h

b 4

n.-.

r

e a

  • P e

DATE: 01/04/95 PEACH Bo m M ATOMIC POWER STATION UNIT 2 FAGE:

72 REVISION:

2 INSER*.* ICE INSPECTION 81HMARY SECOND I!CERVAL, THIRD PERIOD, FIRST OUTAGE (94RF)

CLASS 2 CFAUEP STATUS "MPONENTS SCFM DISCHAPGE VOLUME NR R

ASME S OEGB SEC. XI T RCEP CUMMARY EXAMINATION AREA CATGY EXAM A BC00 REMAFyJ NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE T CAMR ** CALIBRATION BLOCK **

e NCRW (DEF. DwG. NO. CS-03-MI-201-1-A) 281820 824A B b -A 8, C

'.T. 3 MAG-CG-407 R2 C

.X..

A0847310 TIGHTENED LOCKNUT RIGID RESTRAI1C F0.00

  • ";- 3 MAG-CG.407 R2 X...

N RX BLDG, EL 151 6 284826 825A.B F-A,B,C

  • 7 3 MAG-CG-407 R2 C

-X

. AR #A0887127 ACCEPTS EXTRA 530CS WELD RIGID RESTRAINT FO.00

  • 7-3 MAG-CG-407 R2

.X..

BEAD AS.IS.

AR# AInt7058 (NOR 94-00398)

N RX BLDG, EL 151-6 ACCEPT CLTS/ GOUGE AS-IS, 284532 823 F-A,B.C

  • iT. 4 MAG-CG-407 R2 C

X..

A0887265 C5'.ANGES REJECTION O RIGID RESTRAINT F0.00 ACCEPTANCE.

N RX BLDG, EL 151 6 284840 3-2NSV6-8 C-F MT MAG-CG-403 R2 C X ELBOW TO PIPE C5.11 R

N RX BLDG, EL 151-6 284643 S30 F-A, B, C

  • T-3 MAG-CG-407 R2 C

X...

RIGID RESTRAINT 70.00 N RX BLDG, EL 151 6 284844 S32A.B F-A, B, C

  • tT-3 MAG-CG-407 R2 C

X...

RIGID RESTRAINT F3.00 1

N RX ELDG, EL 151-6 l

l Sot **F ' PEF. CWG. NO. C3-03-M!-201-1-El i

244966 3 258*/6-13 C-F MT MAG-CG-403 R2 C

X...

)

TEE TO PIPE C5.11

)

S RX BLDG, EL 149-7 ee,ee 3

e U

CATE: 01/04/95 PEACH BOTTCM ATOMIC POWER STATION UNIT 2 PAGEt 73 REVISION:

2 INSERVICE INSPECTION SLHMARY SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF) n CLASS 2 CFADEP STATUS COMPONENTS COPE SPRAY NR R

3 ASME S 0EGE SEC. XI T RC3P CUMMARY EXAMINATION AREA CATGY EXAM A EOOO REMARKS 4

NUMBER IDENTIFICATION ITEM NO METHCD PROCEDURE T CRMR ** CALIBRATION BIACK**

1 TORUS SUCION LOOP A iPEF. DWG. No. HB-14-MI-201-1-A) 290550 14MB-H2 F-A,B,C VT-3 MAG-CG-407 R2 C

X---

)

SPRING MANGER FO.00 YT-4 MAG-CG-407 R2 X---

l TC-SE3 12, EL 94-7

)

391075 14HB-H5 F-A,B,C YT-3 MAG-CG-407 R2 C

X---

i SPRIN3 HANGER F0.00

  • 7-4 MAG-CG-407 R2 X- --

C CS RM, EL 94-6

]

1 i

j TCFCS S" 7 ION LOCP C '9 f?

CW3. NO. HP-14-MI-20 C)

\\

294220 14HB-H7 F-A, B, C VT-3 MAG-CG-407 R2 C

X---

SPRING MANGER F0.00 VT-4 MAG-CG-407 R2 X--

TC-SEG 11. EL 94-6 l

COPE SPRAY (PFP. DWG. No. HB -2 4 -MT -2 01 C) 394330 14HB-530 F-A,B,C i,7-3 MAG-CG-407 R2 C

X---

RIGID RESTRAINT F0.00 TC-SE3 11 EL 94 6

)

i l

TCP"3 SUC"l'ICN LOCP C IP!F CWG-NO. H3 M!- 2 01 1 -C) 294240 14HB H8 F-A,B,C

  • i-3 MAG-CG-407 R2 C

X- - -

SFRING MANGER FO.00

  • 7-4 MAG-CG-407 R2 X- --

TC-Sa3 11, EL 94-6 294400 14-TSC16-5 C-F MT MAG-CG-403 R2 C

X--

I ELBCW TO ELBOW C5.11 TC SE3 11. EL 94-6 TCRUS $"CTION LOCP D 'P TP CWG. No. H3-14-M!-:01-1-D) 397400 14-2TSD16-15 CF MT MAG-CG-403 R2 C

X---

PIPE TO TEE C5.11 D CS RM,EL 94-6 ee,ee 5

0 9

1 I

'~!

> e t

I l

I DATat 01/04/95' PEACH $0TICM AICMIC PONBR STATICII 1281T 2 PAGE:

74

'l REV12IOWs

'2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST OUTAGE (94RF) i CLASS 2 CFAUSP STATUS COMPOIERNTS 92Rh SPRAY NR R I

AsMB s,c3GB

'f SSC. XI T RC3P

SUMMARY

EKAMINATION AREA CATGY EIAM A B000 REftARKS NUMBER IDENTIFICATION ITBN B00 METHOD P!ACBDURE T CRNR ** CALIBRATION B!4CK**

i DISCHARGE LCF)P A&c (REF. DWG. No, GB-14-Mf=203-3-A) 296E20 1408-s6 P-A,B,C VT-3 MAG-CG-407 R2 C

1---

l RIGID RECTRAINT FO.00 r

i TC-883 12, IL 127-2 i

l 1

298540 14GB-H36 F A,B,C VT-3 MAG-CG-407 R1 C

1**-

I I

I SPRING HANGER F0.00 VT-4 F.AG-CG-4 07 R2 1---

1 1

TC-SSG 12, IL 127 7

?

l l

r I

l

?

290760 24G8-H30 F A, B. C VT-3 MAG CG-407 R2 C

1---

l SPRING MANGBR F0.00 VT-4 MAG-CG-407 R2 X---

(

TC-SEG 12, IL 128 6 I

I i

I l

t i

J l

i r

i

, _. =, -,

_,..,,__.-.m..--

]

{

0-e-

p DATE: 01/04/95 PEACH BOTItel ATOMIC POWER STATION UNIT 2 PAGE:

75

[

RE71SION:

2 INSERVICE INSPECTION

SUMMARY

l SECOND INTERVAL. THIRD PERIOD, FIRST OUTAGE (94RF) 4 CIASS 2 CFAU3F STATUS CCMPONENTS MIGM PRESSURE COOLANT INJECTION NR R-j D

AME S DEGB i

f SEC. II T RCEF EUMMARY EXAMINATION AREA CATGY-EXAM A EOOO REMARKS

[

NUMBER IDEbrf!FICATION ITEtt NO METHOD PkOCEDURE T CRNR ** CALIBRATION SLOCK'*

I 2

I I

I (REF. DWG. NO. HB-21-MI-204-0) 311765 23HE-8110 F-A, B, C VT-3 NAG-CG-407 R2 C X---'

l RIGID RES3AINI F0.00 NPCI, EL 95-0 311768 23HB-$32 F-A, B, C VT-3 MAG.CG-407 R2 C

X**-

4i SPRING HANGER F0.00 VT-4 MAG-CG-407 R2 X---

HPCI, EL 99-0

{

l 211771 23 2T306 8 C-F MT MAG-CG-403 R2 C

X--

l

~

TER TO PIPE C5.11 HPCI, IL 90-0 l

~e t

r g

311774 23HB 819 F-A, B, C VT 3 MAG-CG-407 R2 C

X---

MECHANICAL SNUBBER F0.00 l

MPCI, IL 99 0 5

f I

HIGH PPES.RURE COOL TN7 '9EP. DWG No. HB 23-MI-204-8) l 8

i 311777 23HB-324(IA)

C-C MT MAG-CG-403 R2 C

X---

INTE3RAL ATTACHMENT C3.20 f

HPCI, EL 99-0 i

i (PEF. OwG. NO MP-21 "!-204-0) 311778 23H5-s*4 F-A, B, C VT-3 MAG-CG-407 R2 C

A-..

RIG *: *-JSTRAINT FO.00 HPCI, EL 99-0 311784 23-2TE20-15 C-F MT MAG-CG-403 R2 C

X---

TES M ELBOW C5.11 HPCI, IL 99 0

.. e.

s h

_~

..m.

_.m.

p i

r i

l i

l

?

k I '

1 l

i l

DATE: 01/04/95 PEACH BOTTOM ATOMIC POWER STATION tEf 72 PAGE:

78 l

REESION:

2c INSERVICE INSPECTION St3NUdtY SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF)-

[

CLAES 2 CFAUBP STATUS CCMPONENTS K2GH PRESSURE C00LAfrf INJECTION NR R ASMR S 0EGE SEC. XI T RC3P f

SUMMARY

EXAMINATION ARIA CATGY EXAM A B C O O' REMARKS 3

NUMEBR ' IDENTIFICATION ITEM No METHOD PROCEDURE T CRMT '* CALIBRATION BLOCK'*

v t

4 k

l (REP. DWG. NO. MB-23-MI-204-0) i 311755 23 27520 17 C-F MT MAG-CG-403 R2 C X---

PIPE To TER C5.11 HPCI, EL 99-0 315798 23 2TE16-22 C-F MT MAG-CG-403 R2 C

X---

ELECW To TER C5.11 HPCI, EL 109-2 i

e.

I TCRUS-5UCTION fREP. CWG. No. HB-23-MT-201-1)'

f 315350 23HB-830 F-A,5 C VT-3 MAG-CG-407 R2 C

X---

HYDRL"LIC SNUBBER F0.00 HPCI RM, EL 93-3 315750 23HB-H23 F-A,5, C VT-3 MAG-CG-407 R2 C

X---

}

SPRING HANGER F0.00 TT-4 MAG-CG-407 R2 X---

t HPCI RM, EL 93-3 i

I LISC5GJGE (Pr?. CwG. N? CCN-2?-MT-202-21

)

l 317150 23CCN HS F A,3, C TT-3 MAG-CG-407 R2 eX-.-

l RIGI: RESTRAI).T TC.C0 HPCI PJt. EL 93-5 l

317300 23-2014 4 C-F PT MAG-CG-402 R2 C

X---

ELBCN To PIPS C5.21 LT UT-PE-002 R4 X---

HPCI, EL 95 0

    • 14-CS-100.936-RA-PER**

l l

315030 23DCN H13 P-A,3, C

'.T - 3 MAG-CG-407 R2 C

X---

l SPRING HANGER FO.00 VT-4 MAG-CG-407 R2 X---

l HPCI RM, IL 109-0 i

l l

i l

l I

l

.... a

m

__m e

I DATFr 01/04/95 PEACH BOTTOM A1tl HIC POWER STATION UNIT 2 PAGE 77 REVISION:.

2 INSERVICE IMSPECTION

SUMMARY

J SECOND INTERVAL, *11(IRD PERIOD, FIRST Otf! AGE (94RF) i CLASS 3 CFAUBP STATUS COMPONENIS J

HIGH PRESSURE SERVICE WATER i

NR R ASME A OEGB-SEC. XI T RCEP

SUMMARY

EXAMINATION AREA CATGY EEAM A EOOO REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION SIDCK'*

l l

I p

tray, ewG. wo, on.32-MI-201-21 l

t r

i 640900 32GB-H15

. F-A,3,C VT.3 MAG-CG.407 R2 C

X-.*

R1GID RESTRAINT F0,00 U/3PT&AT. EL 110 4 I

i l

641800 32GB-SS F-A,5,C VT-3 MAG.CG-407 R2 C

X...

l j

RIGID RESTRAINT F0.00 l

U/3PT&AT, EL 107-0

?

i r

I 642100 32G8-89 P-A, B, C VT-3 MAG-CG-407 R2 C

X-..

l RIGID RESTRAINT F0,00

)

l U/3 PT&AT, EL 107 10 641300 31JB-H408 F-A, B, C VT.3 MAG-CG 407 R2 C

+X..

SIGNIFICANT RUST CN STUCS MC BASE RIGID RESTRAINT F0.00 PLATE. AR #A0060812 WAS GENERATED.

U/3PT&AT, EL 110 4 I

642450 31JB H405 F-A,8,C VT-3 MAG-CG 407 R2 C

.X=.

SIGNIFICANT RUST CN STUDS AC BASE i

RIGID RESTRAINT F0,00 PLATE. AP.S.Jt64f12 WAS GINERATED.'

U/3PT&AT, EL 110-4 I

(PEP. DwG. NO. GB-32-MI-201 3)

{

642650 32:3-821 F-A, B, C VT-3 MAG-CG-407 R2 C

X...

RIGID RESTRAINT F0.04 RBCCW RM, BL 127-6 642700 32G5 821(IA)

D-B VT-3 MAG-CG-407 R2 C

X...

INTEGRAL ATTACHMENT D2.20 l

RBCCW RM, EL 127 6 (P EF. CWG, NO. CB-32-MI-201 4-Al l

I 643200 32GB-H38 F.A,B,C VT-3 MAG.CG.407 R2 C

X...

(.

RIGID RESTRAINT FO.00 l

TC-SEG 2, EL 127-6 r

1

-j i

,m.._

i i

. i 4

. I DATE 01/04/95

' PEACH SCTTCM ATOMIC Pow 3R STATION UNIT 2 -

PAGS' 70 h

REtGS10N s '.

2 INSERVICE INSPBCTION

SUMMARY

I p

1 SBCOND INTERVAL, THIRD PERIOD, FIRS'. CUTAGE (94RF).

CLASS 3 CFAUBP STATUS CCMPONENTS HIGH PRESSURE SERVICE MATER f

[

NR R b

'ASME 8 08GE

[

l SBC. XI T RCBP

[

r

(.

CUMMARY EXAMINATION AREA CATGY EXAM A EOOO REMARRS l

NUMBER IDENTIFICATION ITEM NO METHOD PROCBDURE

-T'CRMR ** CALIBRATION 91bC3t**

. i k

s (RRP. DWG. NO. GB-12-Mf-201-4-A)

{

i i

' 543350 3208 852

. F-A,B,C VT-3 MAG-CG-407 R2 C

1-**

{

RIGID RSSTRAINT.

FO.00 -

l TC SE3 2, BL 127 6 l

j I

i l

. 643500 32GB-856 F-A, B, C VT 3 MAG-CG-407 R2 C

X***

RIG D RESTRAINT F0.00 l

TC-SE3 4, FL 124-6 6

l i

(RIF. SWG, NO, GB-32-MI 01-5-A5

. j

,i l

643700 32GB-H2O F-A,3,C VT-3 MAG-CG-407 R2 C

Z=**

i 4

SPRING MANGBR F0.00.

VT-4 MAG-CG-407 R2

.X***

C RHR RM, EL 112 3 l

3 l

I

' 603750 32GB-H28(1A)

D-3 VT-3 MAG CG-407 R2 C

X-**

l INTEGRAL ATTACHMENT D2.40 a

C RNR RM, EL 112 3 I

' I; 643900 32GB-343 P.A,B,C VT-3 MAG-CG-407 R2 C.X.*

l s

RIGID RESTRAINT FO.00 C RHR RM, IL 111-0 604100 32GB 846 T-A,B,C VT-3 MAG-CG-407 R2 C

X*.*

8"PPORT IS A R.SID MANGER. AN EWR WAS SPRIN3 MANGER FO.00 GENERATED TO REVISE SPEC.

TC SE3 1, EL 124-6 r

644250 32GB 387 F-A,B,C VT 3 MAG-CG-407 R2 C X **

RIGID RESTRAINT FO.00 A RHR RM, EL 111-0 W

k 644400 32GB-364 F-A,B,C VT-3 MAG-CG-407 R2 C

X***

RIGID RESTRAINT F0.00 C RKR RM, 51,111-0 b

.,. ~,

~. -

,,,n,

.-n..

.,. _ ~...

4

=_m DATE: 01/04/95 PEAOI BomM ATOMIC PONER STATION UNIT 2

. PACE:

79 REVISION:

2 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, THIRD PERIOD, FIRST CUTAGE (94RF) i CLASS 3 CFAUEP STAT'JS CCMPONE3CS j

HIGN PRESSURE SERVICE MATER NR R

ASME S OEOE SEC. XI T RCEP

SUMMARY

EXAMINATION ARRA CATGY EXAM A EOOO REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE 7 CRMR ** CALIBRATION BIDCK**

l (REF, DNG. NO. QR-32-MI-201 5-B) 644950 32GB-365 P-A,B,C VT-3 MAG-CG-407 R2 C X RIGID RESTRAliff F0.00 8 RHR RM, EL 106-5 (PEF. DWG. No. GB-32-MT 202-6-A) 645250 32GB h27 F-A.8,C VT-3 MAG CG 407 R2 C

X-..

RIGID RESTRAINT FO.00 C PJ0t RM, EL 113-0 l

645300 32GB K27(IA)

D-8 VT-3 MAG-CG-407 R2 C

X-..

I INTEGRAL AlIACHMENT D2.20 C RHR RM, EL 113 0 645450 32GB-859 F* A,5, C VT-3 MAG-CG-407 R2 C X RIGID RESTRAINT F0.00 C RHR RM, EL 113-0 l

1 i

l I

1 l

l l

[.'

1 I

l

~.

i j

(

l DATE: 01/04/95 PEACH BOTTCM ATDMIC POWER STATICN UNIT 2 PAGE:

80 1

RE'rIIION I 2

INSERVICE INSPECTION

SUMMARY

1 l

SECOND INTERVAL, THIRD PERIOD, FIRST OUTAGE (94RP) 1 CIASS 3 CFADEP STATUS CCMPONENTS EMERGENCY SE7VICE WATER i

NR R

AEME S 08GE SEC. XI T RCEP

SUMMARY

EXAMINATION ARIA CATGY EXAM A EOOO REMARKS NUMBER IDENTIFICATION IT2M NO METHOD PROCEDURE T CRMR ** CALIBRATION BIDCK'*

DIESEL CENEPE"0P (PEF. CW3. NO. MB-11-Mf-201-51 650550 33HB-83 F-A,B,C VT-3 MAG-CG-407 R2 C

X---

RIGID RESTRAINT F0.00 EL 126 11,D DIESEL DIESEL CENEP. AMP (PEF, CWG. No. HB-33-MT-201-?\\

650700 33HB-54 F-A,D,C

',7-3 MAG-CG-407 R2 C

X---

RIGID RESTRAINT F0.00 EL 126-11,A DIESEL DIE 9EL CENERATOR (PEP.

C'en",. No. HB-3 3 -MI-2 01 -2 5 650750 33HB-89 P-A,B,C VT-3 MAG-CG-(07 R2 C

X-RIGID RESTRAINT FO.00 EL 122-2,A DIESEL 650775 33HB-$ 9 (IA)

D-B

  • i 3 MAG-CG-407 R2 C

X---

INTEGRAL ATTACHMEfff D2.20 EL 12.'-2,A DIESEL DIESEL GENEPATOP (PEF. OWG. NC. HB-33-MI-201-4' I

650900 33HB-312 F-A,B C

".T - 3 MAG-CG-407 R2 C

X...

]

RIGID RESTRAINT F0.C0 B DIESIL, EL 134-10 l

650925 33 HB-812 (IA)

D-3

  • T.3 MAG-CG-407 R2 C

X*--

INTEGRAL ATTACHMENT D2.30 B DIESEL, EL 134 10 DIESEL GENEPA*CP (PEF. rWG NC. MP-33-MI-201-44 651200 33HB-818 r-A,B,C

.7-3 MAG-CG-407 R2 C

X- - -

RIGID RESTRAINT F0.00 D DIESEL, EL 126-11 i

1

l I

i DATE: 01/04/95 FRACH BOTTOM ATONIC FCW R STATION UNIT 2 FAGE:

01 EEVISION:

2 IN88RVICE INSFBCTICOI

SUMMARY

I i

SECOND INTERVAL, THIRD FRIOD, FIRST OUTAGE (94RF) l class 3 CFAUEF STATUS COMPONENTS l

EnERGENCY SERVICE WATER I

NR R Asus 4 03GE i

SEC. 12 T RCEF

[UNNARY EXAMINATION AREA CATUY IIAN A EOOO REMARKS NLBISBR IDENTIFICATION ITEM NO METHOD FROCEDRE T CRMR ** CALIBRATION BLOQt**

I 1

I i

DIESEL GENERATOR (REF. DWG, NO. HB-33-MI-201-6) i 651225 33MB-810(IA)

D-3 VT.3 NAG-OB-407 R2 C

X...

i INTBORAL ATTACMMBNT D2,20 l

l D DIBSEL, EL 126-11 j

i l

2 (REF. DWG, NO. NBC-33-MI-201-13)

I i

[

656120 33HBC-H344 F-A, B, C VT 3 NAG-CS.407 R2 C

X...

GUIDE F0.00 i

TC-88G 4 l

(REF. DWG. NO. HBC-33-MI-201-14) l l

656128 33HBC-H307 F-A, B, C VT-3 MAG-CG-407 R2 C

X...

GUIDE FO.00 TC-5BG 5.

656130 33HBC-H3 08 P-A, B, C VT-3 MAG-CG-407 R2 C

X-..

GUIDE F0,00 TC-83G $

+

656132 33Hrc-H309 F-A,B,C VT-3 MAG-CG-407 R2 C X..

ANCHOR F0.00 TC-SEG 6 I

456134 33 HBC-H309 (IA)

D2.20 VT-3 MAG-CG-407 R2 C

X...

ANCHOR D-B TC-SEG 6 I

656136 33HBC-H210 F A, B, C VT-3 MAG-CG-407 R2 C

X...

GUIDE F0.00 TC-SEG E i

i l

l f

i

.~

s. _ _ _. _ _ _ _

.'e DATS: 01/04/95 PEACH BOT *CM ATOMIC POWER STATION UNIT 2.

PAGE:

82 I

'R571SION:

2 INSERVICE INSPECTION

SUMMARY

5

$3COND INTERVAL TNIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 3 CFAUBP STATUS COMPONENTS L

EMER9ENCY SERVICE MATER WR R

)..

'ASMB SOEGE SBC. XI T RCBP

SUMMARY

EKAMINATION AREA

CATGY RIAM A B C 0 0 ""*

NUMBER IDENTIFICATION ITEM NO METHOD PROCBDURE T CRMR ** CALIBRATION BIDCK" 1

i (REF. DNG. NO. HBC-13-MI-201-M 656130 33HBC-H314 F-A,3, C VT 3 MAG CG-407 R2 C

X---

GUIDS 70.00 t

TC-SSG S

?

656140 33HBC-H313

' F-A,3,C VT 3 MAG-CG-407 R2 C

X---

GUIDE

. FO.00 TC-SEG 7 i

'6561(2 33HBC-H312 P-A,8,C VT-3 MAG-CG-407 R2 C

X---

2 GUIDE FO.00 '

TC-85G 7 3

5561(4 33HBC-H311 F-A,3.C VT-3 MAG-CG-407 R2 C X * =~ ~

GUIDE F0.00 f

TC-88G 7 l

(REF. DNG. NO. NB C-3 3 -MI-2 01 -19)

?

656160 33HBC-H322 F-A,B,C VT-3 MAG-CG 407 R2 C

X..-

GUIDE F0.00 TC-SEG 12 656162 33HBC-H322 (IA)

D2.20 VT 3 MAG-CG-407 R2 C X --

GUICE D-B TC-SEG 12 I

l 1

I-I

\\

r L

f l.

t 1

m.

l DATE: '01/04/95 PEAQt BOTTCM ATOMIC F0WER STATION UNIT 2 FAGE:

83 REVISIONt 2

INSERVICE INSFECTION

SUMMARY

SECCND ItrTERVAL, THIRD PERIOD,' FIRST CUTAGE (94RF)

CLASS 2 CPAUEF STATUS COMPONENTS EMERGENCY COOLING WATER NR R J/JMB S 0EGB LEC..I T RCEF CUMMARY EXAMINATION AREA CATGY EXAM A EOOO REMARKS NUMSER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR **CALIBRATICW 3L00t**

EMERGENCY COOLING WATER (RFf. DWG. No. HB-48-MI-001-4)

I 656618 4808-821A F-A,B,C VT-3 MAG =CG-407 R2 "C

X*==

GUIDE F0.00 EMRGNCT COOL TOWERS 656628 4tHB-M12 F-A,3,C VT-3 MAG-CG-407 R2 C

X-**

RIGID RESTRAINT F0.00 EMRGNCY COOL TOWERS 456630 4 th3-H12 (IA)

D-B V'"- 3 MAG-CG-407 R2 C

X===

INTEGRAL ATTACHMENT D2.20 l

l EMRG COOL TWR,EL 1

t EMERGENCY COOLING WATER (REF, DWG. No.'GB-40-MI-001-2) 657444 4808-H24 F-A, B C VT-2 MAG-CG-407 R2 C

X-*-

RIGID RESTRAINT F0.00 EMRG COOL TWR,EL 119 657446 46GB-H24(IA)

D-B VT-2 MAG-CG-407 R2 C

X---

IlrTEGRAL ATTACHMENT D2.20 EMRGNCY COOL TOWERS 657448 4tGB-521D F-A.8,C VT-3 MAG-CG-407 R2 C

X---

GUICE F0.00 BMAG COOL TWR,EL 119 l

i EMEPGENCY COCLING WATER (PEF. DWG. NC GP-40-M! 001-3) 650074 48GB-H15 P-A,3,C VT-3 MAG-CG.407 R2 C

X*--

L RIGID RESTRAINT F0.00 EMRG COOL TWR,EL I

f L

)

i 1

I l.

L i

e i

I l

I *-

DATE:. 01/04/95 PBAOI BO'f70M ATOMIC POMBR STATION UNIT 2 PAGB:

to RBYISION:

2 INSERVICE INSFBCTION

SUMMARY

l' SECOND INTERVAL, THIRD FBRIDO, FIBST OUTAGE (94RF)

CLASS 2 CFAUBP STATUS COMPOWENTS M_C2C1.IP2 M l

NR k

ASMB S OEGB SBC. XI T R C B,F l

LUMMARY EXAMINAT7dt>

CATGY EXAM A BC00 REMARKS NUMBER IDENTIFICA M ITEM NO METHOD FROCBDURE T CRMR ** CALIBRATION BLOCK'*

................~....

i l

BMBRGENCT COOLING WATER (REF. DWG. NO. QS-46-M!-001-3) i t

558075 40GB-NI5(IA)

D-B VT 3 MAG-CG-407 R2 C

1-=*

INTBGRAL ATTACHMENT D2.20 BMRQNCY COOL TOWBRS W

l 656054 40GB-812 F-A,B,C VT-2 MAG-CG-407 52 C X*.*

l j

l RIGID RBSTRAINT FO.00 l

BMRG COOL TWR,BL l

i 658086 48GB-SI2(IA)

D-B VT-3 MAG-CG-407 R2 C

X.--

INTEGRAL ATIACHMENT D2.20 l

BMRGNCT COOL TOWERS j

l i

I 656092 40GB-H2O F-A,B,C VT-2 MAG-CG-407 R2 C

X---

RIGID RBSTRAINT F0.00

)

BNRG Cook TWR,BL i

654094 48GB H20(IA)

D-B VT-2 MAG-CG-407 R2 C

X--*

INTEGRAL ATTACHMENT D2.20 BMRGNCY COOL TOWERS i

658100 48GB-H65 F-A, B, C VT 2 MAG-CG-407 R2 C X.-

RIGID RESTRAINT FO.00 BNRG COOL TWR,BL 658102 48GB-H65(IA)

D-B

  • "T-2 MAG-CG-407 R2 C

X-+-

INTEGRAL ATTACHMENT D2.20 BMRGNCY COOL TOWERS i

658108 48GB-82 F A,B,C VT 2 MAG-CG-407 R2 C

X..*

RIGID LBSTRAINT F0.00 BMRG COOL TWR,BL J

l

[

i l

I I

,e vr 4

  • --T'

. _. _.. ~

~..

)

4

O DATE: 01/04/95 PEAct BOTTON ATONIC POWER STATION UNIT 2 PAGE:

85 CIVISIONa' 2..

INSERVICE INSPECTION

SUMMARY

. SECOND INTERVAL, TMIRD PERIOD, FIRST OL*TAGE (94RF) 3 CLASS 3 CFAUSP STATUS CCMPONENTS BIER 9ENCY COOLING MATER WR R

ASNB S oEGB

)

SBC. XI T RC3P' SunnART axanImATION ARaA CATGy aXAn

'A a 0 0 o RanARxS IRRIBER IDBarTIFICATION

-ITEM po METHOD PROCEDURE T CRNR ** CALIBRATION BLOCK **

ENERGENCY COOLING WATER fREF. DWG. NO. GB-40-MI-001-3) 650510.etGB-32(!A)

D-3

~ VT 3 IRAG-CG-407 12 C

X.--

INTBGRAL ATTAOWlENT D2.20 EMAGNCY COOL' TOWERS D

65t&56.40GB-H16 F-A,B,C VT 3 MAG-CG-407 R2 C

X---

RIGID RESTRAIlfT F0.00 ENRG COOL TWR,BL.

e

'656818 40GB-M16(IA)

D-3 VT-3 IBAG-CG.407 R2 C-X----

INTBGRAL ATTACHMENT D2.20 EIIRGIOCY COOL TOWERS 658124 48G8-838 -

F A,B, C VT-3 IIAG-CG-407 R2-C X.--

GUIDE FO.00 BIERG COOL TWR,BL 2-unamGinci COOLING WATER (REF. DWG. NO. HB-48-MI-001-5)

=

659068 4tHB-522 F-A,3, C VT 3 3 TAG-CG-407 R2 C

X-..

t GUIDE F0.00 EMRO CDOL TWR,EL 659074 4tHB-SI6 F-A, B, C VT 3 ItAG-CG-407 R2 C X*--

RIGID RESTRAINT F0.00 BMRG CCCL TWR,EL 659076 48HB 816(IA)

D-B VT-3 MAG-CG 407 R2 C

X---

INTEGRAL ATTACHMENT D2.20 3

EMRGNCY COOL TOWERS 6

659082 4tHB-83 P-A,B,C VT-2 STAG-CG-407 12 C

k---

I RIGID RESTRAINT F0.00 BMRG COOL TWR,SL n'

i k'

6,.

e.=

e DATE: 01/04/95 PEACH BOTTCM ATOMIC POWER STATION UNIT 2

. PAGE:,

46 REVISIONt 2

IN85RVICE INSPECTION SL91 MARY'.

BBCOND INTBRVAL. THIRD PERIOD, FIRST CUTAGE (94RF)

CLASS 2 CFAUEP STATUS CCMPONENTS EMERGENCY C0 CLING WATER HR R ASME 8 0EGE SBC. XI T RC3P LVMMARY EXAMINATION AREA CATGY-EXAM A BC00 R8 MARKS NUMBER f?BNTIFICATION ITEM NO METHOD PROCEDURE

.T CRMR ** CALIBRATION BLOCK'*

f

---_a COOLING WATER (REF. DWG. No. MB-48-MI.001-$)'

w 459084 4tMB-82(IA)

D-B VT-2

' MAG-CG-407 R2 C X..

INTEGRAL ATTACHMENT D2.20 Q

EMRGMCY COOL TOWERS A

659094 4tHB-81

. F-A,B,C VT-2 MAG-CG-407 R2 C.X...

RIGID RSSTRAtNT FO.00 ENRG C00L TWR,EL a

659096 4tHB-81(IA)

D-B VT-2 MAG-CG-407 R2 C X INTEGRAL ATTAOOtBNT D2.20 3

BNRGNCY COOL TOWERS 659102 4tHB-H2 P-A,B.C VT-2 MAG-CG-407 R2 C X RIGID RESTFAINT FO.00 EMRG COOL TWR,EL k

659104 4 tHB-H2 (IA)

D-B VT-2 MAG-CG-407 R2 C

X-..

)

INTEGRAL ATTACHMENT D2.20 BMRGNCY COOL TOWERS 659110 4tHB-829 P-A, B, C VT-2 MAG-CG-407 R2 C

X..*

GUIDE F0.00 EMRG COOL TWR,EL It e

6 h

_ /%rup nO s

Section 2

SUMMARY

OF REPORTABLE CONDITIONS OBSERVED DURING IN-SERVICE INSPECTION PEACH BOTTOM ATOMIC POWER STATION UNIT 2 DECEMBER 11, 1992'TO OCTOBER 22, 1994

~.

1 t

SECTION 2

SUMMARY

OF' REPORTABLE CONDITIONS

. As a result of examinations performed during the Unit 2, loth Refuel Outage. In-Service ' Inspection (second

interval, third period),

numerous conditions were reported.-

Subsequent examinations and/or evaluations determined.most conditions to be either insignificant or geometric in nature.

However, several reportable conditions'were recorded and are summarized below:

H-1.

H-3. H-4.

H-5. H-6 Core Shroud Welds The final summary report, as required by Generic Letter 94-03, was submitted to the NRC on 11/7/94. The' details of the flaws detected on these welds can be found in. this report.

The evaluation document concluded that there are substantial margin for each of these welds ur.dar conservative, bounding conditions to allow for continued operation of the Unit.

Reference Action Request #A0884592.

Jet Pumns # 3.

4.

6.

7

-Jet Pump Assemblies The Jet ' Pump restrainer wedge was found misaligned to the 1

bearing surface of the restrainer bracket.

An engineering evaluation was performed which justified a

Use-As-Is disposition.

Examination of these conditions will be performed at the next refuel outage. Reference Action Request

  1. A0883009.

Jet Pumn #7 Jet Pump Assembly c

A restrainer adjustment screw tack weld was found cracked.

Each of these adjustment screws have two tack. welds that are 180 degrees apart from each other.

The second tack weld was examined and found to be acceptable.

An engineering evaluation was performed which justified a

Use-As-Is disposition.

Reference Action Request #A0882240.

10MO-H98 Spring Hanger, Residual Heat Removal (RHR) System The as-found spring setting was found out of specified range.

The setting was found acceptable for continued / intended service by an engineering evaluation, however, rework of the hanger was performed.

Reference Action Request #A0871801.

10-2SCSD20-6 Circumferential Weld, RHR System A gouge type indication was found, approximately 5/8" long by 1/16" deep, during a visual and magnetic particle examination of the weld. This indication is located adjacent to the weld.

An engineering evaluation was performed which justified a Use-As-Is disposition.

Reference Action Request #A0861668.

..-.A

7.. _..

f.

L l-i 1DB-H10 Spring Hanger, Main Steam System l-l l

A notch type indication was-found, approximately

.8" long by

.2" deep, on the weldless eye nut during a visual examination

'l of the hanger.

The indication was acceptable: for-continued / intended service by an engineering ' evaluation, however, rework was performed which replaced the eye nut.

Reference Action Request (A0885891.

31JB-H40B & H4OE Rigid Restraints,. High Pressure. Service j

Water. System i

'I Base plate bolting was found to be significantly corroded.

Adjacent component supports were examined in the same plant j

location and were found with similar conditions.

An: Action Request #A0868812 was generated to investigate and determine the appropriate corrective measures.

l l

1 l

. -. - -. - ~.. -.. -.

Section 3 r

5

SUMMARY

OF ASME REPAlRS AND REPLACEMENT COMPLETED FOR PEACH BOTTOM ATOMIC POWER STATION UNIT 2 l

DECEMBER 11,1994 TO OCTOBER 22,1994.

1 l

l i.

o.

SECTION 3 Summary of ASME XI Repairs and Replacements Page 1 of 5

~

SUMMARY

OF ASME SECTION XI REPAIRS AND REPLACEMENTS System 01:

Main Steam System y

LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK P

93-002 C0140002 RV-2-02-071 B Replaced the valve 93404 C0141341 AO-2-01 A-080C Replaced (6) bonnet studs and nuts

~

93-139 C0142560 MO-241H-2322 Replaced the bonnet 94-023 R0249255 RV-2-02-071 B Replaced the valve 94424 R0249333 RV-2-02-071D Replaced the valve 94-025 R0249339 RV-2-02-071 E Replaced the valve 94-026 R0249387 RV-2-02-071F Replaced the valve 94-028 R0249230 BV-2-02-071 A Replaced the valve a

94-029 R0249393 R%2-02-071H Replaced the valve 94-041 R0249586 RV 2-02-070A Replaced the valve

]

94-115 R0491351 RV-2-02-071J Replaced the valve 94-116 R0491354 RV-2-02-071 K Replaced the valve 94-117 R0491355 RV-2-02-071G Replaced the valve 94-118 R0502920 RV-2-02-071C Replaced the valve 94-122 R0486896 RV-2-02-071 L Replaced the valve 94-123 R0486899 RV-2-02470B Replaced the valve 94-169 C0157124 HV-241 A-84A Replaced the bonnet 94-170 C0157129 HV-2-01 A-83A Replaced the bonnet 94-171 C0157132 HV-2-01 A-83C Replaced the bonnet 94-172 C0157134 HV-2-01 A-84C Replaced the bonnet 94-011 R0507539 1-GG-S-7 Replaced snubber with an upgraded pressurized model 94-012 R0507540 1-GG-S-8 Replaced snubber with an upgraded pressurized model 94-013 R0507541 1-GG-S-10 Replaced snubber with an upgraded pressurized model 3

i SECTION 3 Summary of ASME XI Repairs and Replacements Page 2 of 5 System 01:

Main Steam System LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK 94414 80507542 1-GG-S-11 Replaced snubber with an upgraded pressurized model 94-015 R0507543 1-GG-S-21 Replaced snubber with an upgraded pressurized model j

94-053 R0481799 SS-3-D Replaced snubber with an upgraded pressurized model System 02:

Main Recirculation System LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK 94-186 C0157787 HV-2-02-15 Replaced the bonnet 94-106 C0157787 HV-2-02-16 Replaced the bonnet 94-054 R0507533 SS-B-1 Replaced snubber with an upgraded pressurized model 94-051 R0507534 SS-C-1 Replaced snubber with an upgraded pressurized model 94-045 R0507535 SS-C-6 Replaced snubber with an upgraded pressurized model l

l System 03:

Control Rod Drive System LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK 94-031 R0488316 Replaced CRD housing bolting 94-032 R0485419 Replaced CRD flange tubes

t SECTION 3 Summary of ASME XI Repairs and Replacements Page 3 of 5 i

System 06:

Feedwater System j

LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK 94-016 R0507544 6-DDNL-S-11 Replaced snubber with an upgraded 2

pressurized model 4

System 10:

Residual Heat Remmel System LOG 1 WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK I

93-189 R0507606 RV-210181B Replaced the valve 93 190 R0507607 RV-210-181D Replaced the valve 94442 C0149148 MO-2-10-025B Replaced the bonnet 94-126 C0152002 10GB-S51 Replaced non-pressurized hydraulle snubber with a pressurized reservoir snubber 1

94-185 C0157423 10GB-H52 Replaced the spring hanger rod l

93-123 C0145409 10GB-SS2 Replaced snubber and repaired support j

structure 94-052 R0468323 10-GB-S-43-1 Replaced snubber with an upgraded i

pressurized model 4

l 94417 R0507545 10-GB-S-50 Replaced snubber with an upgraded pressurized model j

94-018 R0507546 10-GB-S-53 Replaced snubber with an upgraded j

pressurized model i

i 94-019 R0507547 10-GB-S-55 Replaced snubber with an upgraded pressurized model System 11:

Standby Liqud Control System j

LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK 93-114 C0143529 2APO40 Replaced the pump J

J

t SECTION 3 Summary of ASME XI Repairs and Replacements

[

Page 4 of 5 7

System 13:

Reactor Core isolabon Cooling System LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK 94435 R0468346 13-DDN-S-13 Replaced snubber with an upgraded pressurized model f

94-037 R0507548 13-DBN-S-15 Replaced snubber with an upgraded pressurized model i

l System 14:

Core Spray System LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK 94-034 R04C274 14-DCN-S-26 Replaced snubber with an upgraded pressurized model j

System 23:

High Pressure Coolant Injection System LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK 93-191 C0149177 Tie in pipe weld to large bore pipe to faelitate replacement of level switch LS-2-23498 94-060 R0468360 23-DBN S-29 Replaced snubber with an upgraded pressurized model 94-038 R0507550 23-DDN-S-9 Replaced snubber with an upgraded pressurized model 94-044 R0507551 23-DON-S-25 Replaced snubber with an upgraded pressurized model 94-155 C0151573 MO-2-23-25 Performed Mod 1909, Leak off plug System 32:

High Pressure Service Water System LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK 94-136 R0507680 RV-2-32-180B Replaced valve 4

'N

o I

SECTION 3 Summary of ASME XI Repairs and Replacements Page 5 of 5 System 33:

Emergency Service Wear System LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK 94 005 C0149904 Replaced piping spool piece and valve C0153350 between the 'A' ESW booster pump and the rnain header 94-109 R0265441 CHK443-515A Weld build-up of valve intemal disk back

stops, i.

LOG #

WORK ORDER #

COMPONENT ID DESCRIPTION OF WORK MOD # P00190 Upgrade of motor operated valves and their supports due to power rerate project MOD # 5362 Reactor Water Clean-Up/ Bottom Head j

Drain Une System improvements MOD # P00403 Permanent removal of Residual Heat Removal Head Spray Pipe MOD # 5347 Emergency Service Water System permanent flow monitor installation l

MOD # 8542

injection, Reactor Core Isolation Cooling 4

and Residual Heat Removal Extemal Bypass Piping l

MOD # 8649 Rework of Reactor Water Clean-up I

Support PH-86 on valve MO-2-12-15 l

4 k

4 4

2

.-,n_ _ - _,

s =

1 2

4-i 9-1 l~

4 4

E 3

1 i

t i

I i

1 i

i PECO ENERGY COMPANY

,i PEACH BOTTOM ATOMIC POWER STATION UNIT 2 1

1 1

INSERVICE INSPECTION SJMMARY i

COMPLETED COMPONENTS j

SECOND INTERVAL, SECOND PERIOD I

e i

i i

k a

b a

i E

1 1

1 l

J d

1 i

4 l

d

}6' Section 4 i

)

4 s

i i

)

)

)

i ii

SUMMARY

OF IN-SERVICE INSPECTION RESULTS j

j DURING UNIT 2, PRE-OUTAGE

.i j

(CREDITED TOWARDS SECOND PERIOD)

PEACH BOTTOM ATOMIC POWER STATION UNIT 2 DECEMBER 11, 1992 TO OCTOBER 22, 1994 j

l 4

i 4

a j

i

-=e c

~

...~

, -.. ~. - - -

.~.

I e #

l 6

Y I

J 5

DATBt 12/29/94 PEACH SOTTON ATONIC DON E STATION UNIT 2 PAGE:

1 REVISION:

2 INSERVICE INSPOCTION StBNIARY A

I S$COND INTERVAL, SECOND PERIOD, TNIRD OUTAGE (93RF)

CIASS 2 COMPLETE CONDONENTS SYSTEN PUNCTIONAL TEST NR R

{

ASME -

S OEGE t

SBC. XI T. R C E P j

SUNNARY EXAMINATION AREA CATGY EXAM A 3000 REMARKS

-NUMBER IDENTIFICATION

'ITEN NO NETMOD.

PROCEDIEtB T CRNR ** CALIBRATION 314CK'*

.....................................................................+..............................................

1 1

PRESS VESS. PIPING.VLVS.PDS I

i l

i 222575 Cons SPRAY SYSTEN C-H VT-2 ST-J-000 551 2 C X.--

PULL FUNCTIONAL TEST COMPLBTE..TISTS l

PRESSURE RETAINING COMPONENTS VT ST-J-000-652-2 X---

PERPORNED ON 'S' LOOP ON 4/23/94 AND 'A'

.I VT-2 ST-J 080-652-2..

Z---

LOOP ON 4/12/94.

j VT-2 ST-J-040 656 2 X-..

VT-2 ST-J-060-657-2 X...

)

VT-2

__ST-J 080-558-2

.X--

l l

.i i

l r

r E

I t

i f

1 q

I l

l t

1 i

i i

I t

i I

t DATE: 12/29/94 PEACH SOTTOM ATOMIC POWER STATION UNIT 2 PAGE:

2 REVISIOWs 2

INSERVICE INSPECTION SLleMARY SECOND INTERVAL, SECOND PERIOD, THIRD OLTAGE (93RF)

CLASS 3 SECTION ZZ COMPLETED COMPONENTS SYSTEM INSERVICE OR FUNCTIONAL TRSTS Nk

.R ASMS S 0803 SEC. XI T RC5P

SUMMARY

EXAMINATION AREA CATGT EXAM A B000 REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION 5thCK" EMRPGENCY SERVICS WATER 660000 58W SYSTEM D-B

=

PRESSURE RETAINING COMPCNENTS D2.10

  • T 2 87-3-000 635-2 X...

PARTIAL TESTS ON 2/5/94, 4/9/94, A;4D v

6/6/94.

87-J-080 633 2 WAS CCMPLETED ON 9/15/93. FULL PUNCTIONAL TEST IS COMPLETE.

HIGH PRESSURB SERVCR MA*BR 660025 HP8W SYSTEM D-B

'v7-2 ST-J-080-632+2 C

X-..

FULL FUNCTICNAL TEST COMPLEU. PARTIAL PRB38URE RETAINING COMPONENTS D2.10 TESTS NERE PERFORMED ON 4/13/93, 2/5/94, 4

AND 4/9/94.

l BMERGENCY COOLING 662050 BC SYSTEM D-B VT-2 8T-J.000-635-2 C

.X..

FULL FUNCTICNAL TEST COMPLE"E. TEST PRESSURE RETAINING COMPCNBNTS D2.10 PERPORMED CN 6/6/94.

FUEL POOL C001.ING 660075 FPC SYSTEM D-C

".7-2 MAG-CG-401 R2 C

X...

FL"L FUNCTICNAL TEST COMPLF 3 PRESSURE RETAINING COMPCNENTS D2.10