Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:M84038 + (December 10, 1993)
- GO2-93-287, Informs That BPA Obligated to Pay Annual Costs of Plant to Util Under Terms of Net Billing Agreements,Included as Attachment to Util .Compliance w/10CFR140.21 Re Guarantee of Payment of Deferred Premium Satisfied + (December 10, 1993)
- GO2-93-290, Special Rept:On 931126,main Control Room Received Stack Monitor Sys Trouble Annunciator & Status Display Indicated High Range Channel Failed self-test.Caused by Component Failure of Stack Monitor Detector.Replacement in Progress + (December 10, 1993)
- GO2-93-289, Responds to Violations Noted in Insp Repts 50-397/93-18, 50-397/93-24 & 50-397/93-29.Corrective Actions:Monitoring & Feedback Mechanism Enhanced by Incorporating Problem Classification Sys + (December 10, 1993)
- 05000244/LER-1993-006, :on 931110,feedwater Transient Occurred,Due to Loss of Ability to Control Feedwater Regulating Valve.Caused by low-low SG Level Reactor Trip.New Screw & Nut Installed in Linkage Arm + (December 10, 1993)
- ML17158A040 + (December 10, 1993)
- ML17158A045 + (December 10, 1993)
- ML17158A043 + (December 10, 1993)
- ML17059A137 + (December 10, 1993)
- ML16224A221 + (December 10, 1993)
- ML17263A495 + (December 10, 1993)
- IR 05000206/1993037 + (December 10, 1993)
- ML13312A741 + (December 10, 1993)
- ML17059A162 + (December 10, 1993)
- ML14181A171 + (December 10, 1993)
- ML17263A492 + (December 10, 1993)
- ML14181A172 + (December 10, 1993)
- ML20058L769 + (December 10, 1993)
- ML20062L194 + (December 10, 1993)
- ML20059E947 + (December 10, 1993)
- IR 05000289/1993008 + (December 10, 1993)
- L-93-057, Forwards Addl Info Re 931124 Application for Renewal of License SNM-33 on Environ Assessment,Including Explanation of Substantive Changes from Previous Renewal Submittals & Replacement Pages to Renewal Application + (December 10, 1993)
- L-93-058, Forwards Response to NRC 931110 RAI Re Decommissioning Funding Plan Submitted on 930528 + (December 10, 1993)
- L-93-302, Forwards Rev 10 to Safeguards Contingency Plan.Encl Withheld Ref 10CFR2.790 + (December 10, 1993)
- TAC:L21637 + (December 10, 1993)
- IR 05000416/1993022 + (December 11, 1993)
- ML20058Q338 + (December 11, 1993)
- 05000369/LER-1993-010-01, :on 931111,discovered That Potential Existed for Loss of RHR Sys as Part of ECCS Because of Design Deficiency.Procedures OP/1&2/A/6200/04, RHR Sys, Encl 4.2 Revised + (December 11, 1993)
- ML20058M084 + (December 12, 1993)
- IR 05000413/1993029 + (December 12, 1993)
- ML20058Q274 + (December 12, 1993)
- ML20058M609 + (December 12, 1993)
- ML20058M513 + (December 12, 1993)
- ML18011B131 + (December 12, 1993)
- Information Notice 1993-95, Storm-Related Loss of Offsite Power Events Due to Salt Buildup on Switchyard Insulators + (December 13, 1993)
- ML18100A768 + (December 13, 1993)
- ML18059A573 + (December 13, 1993)
- ML18059A572 + (December 13, 1993)
- ML20063L056 + (December 13, 1993)
- ML20062M875 + (December 13, 1993)
- ML20062K708 + (December 13, 1993)
- ML20062K706 + (December 13, 1993)
- ML20062K632 + (December 13, 1993)
- ML20062K575 + (December 13, 1993)
- ML20062K573 + (December 13, 1993)
- ML20062K139 + (December 13, 1993)
- ML20059H425 + (December 13, 1993)
- ML20059C639 + (December 13, 1993)
- ML20059B358 + (December 13, 1993)
- ML20058P445 + (December 13, 1993)
- ML20058N417 + (December 13, 1993)
- ML20058M997 + (December 13, 1993)
- ML20058M981 + (December 13, 1993)
- ML20058M911 + (December 13, 1993)
- L-93-305, Forwards Rev 16 to Guard Training & Qualification Plan.W/O Encl + (December 13, 1993)
- ML20058M411 + (December 13, 1993)