Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135C100 +
- ML20140H598 +
- ML20134N281 +
- ML20134N201 +
- ML20134L906 +
- ML20134L875 +
- ML20134L388 +
- ML20134K662 +
- ML20134K574 +
- ML20134K477 +
- ML20134K465 +
- ML20134K240 +
- ML20134K227 +
- ML20134J354 +
- ML20134H272 +
- ML20134G960 +
- ML20134G940 +
- ML20133A128 +
- ML20129K322 +
- ML20129K321 +
- ML20265D183 +
- RC-96-0270, Informs That Implementation of Mod to Green Operating Bands Which Require Change Will Be Completed by 970331 +
- RBG-43339, Responds to NRC Re Violations Noted in Insp Rept 50-458/96-12.Corrective Actions:Restored Transmitter to Svc,Verified Nuclear Boiler Instrumentation line-up & Performed Verification of 2,650 Safety Related Valves +
- BSEP-96-0423, Responds to NRC Re Violations Noted in Insp Repts 50-324/96-13 & 50-325/96-13.Reactor Operator Was Removed from watch-standing Duties Pending Further Investigation of Event +
- NSD-NRC-96-4883, Forwards Responses to Dser Open Items 3.6.2.3-2 & 3.12.3-1 Re Pipe Rupture Hazard Analysis & Piping Analysis +
- LIC-96-0178, Requests Termination of RO License for DA Hochstein (Docket 55-40581,license OP-42355) +
- ST-HL-AE-5505, Forwards Response to NRC Re NOV & Proposed Imposition of Civil Penalties.Corrective Actions:Senior Mgt Team at STP Was Replaced +
- ML20147E422 +
- ML20134P971 +
- ML20134K473 +
- ML20134G336 +
- ML20134F321 +
- 05000412/LER-1996-005-01, :on 961011,motor Control Ctr Auxiliary Control Relays Failed Due to Thermal Aging.Replaced 203 Active J12 Relays +
- 05000304/LER-1996-008-09, :on 961011,SG Tube Indications Were Greater than TS Requirements Due to Stress Induced During Fabrication Process.All Identified Tubes Will Be Reviewed by Corporate & Station SG Engineers +
- VPN-072-96, Forwards Replacement Pages to Rev 1 of Util Tnp Decommissioning Plan +
- ML20129K355 +
- ML20134K119 +
- HNP-96-190, NPDES Noncompliance Notification:On 960930,exceeded Daily Max Limit & Monthly Average Limit of BOD5 During Reporting Period.Caused by Reduction in Chlorine Contact Time.Reviewed Operational Procedures +
- IR 05000335/1996016 +
- ML20133A142 +
- ML20134K115 +
- ML20129K344 +
- 05000352/LER-1996-019, :on 961026,capability to Reject Electrical Load of RHR Pump Not Fully Verified.Caused by Inadequate Test Procedure.Tests Will Be Revised Prior to Next Performance & TS Change Request Is Being Pursued +