ML20134L388

From kanterella
Jump to navigation Jump to search
Forwards LER 96-019 Which Repts Operation Prohibited by TS in That Certain Previously Established Surveillance Testing for EDG Did Not Fully Verify Capability to Reject Specified Electrical Load of RHR Pump Motor
Date released: 05/27/2020 Download: ML20134L388


:on 961026,capability to Reject Electrical Load of RHR Pump Not Fully Verified.Caused by Inadequate Test Procedure.Tests Will Be Revised Prior to Next Performance & TS Change Request Is Being Pursued
ML20134L394
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/11/1996
From: Kananter J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20134L394 (4)
Forwards LER 96-019 Which Repts Operation Prohibited by TS in That Certain Previously Established Surveillance Testing for EDG Did Not Fully Verify Capability to Reject Specified Electrical Load of RHR Pump Motor
ML20134L385
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/11/1996
From: Boyce R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20134L385 (1)