Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12270A444 +
- ML17325B213 +
- ML092260131 +
- ML092240077 +
- ML17342A595 +
- ML20045B448 +
- ML051890359 +
- L-04-133, September 2004 Monthly Operating Report for Beaver Valley Units 1 and 2 +
- PLA-5773, Annual Financial Report +
- ML20064F479 +
- ML20064C318 +
- PLA-5491, Annual Financial Report +
- PLA-5641, Annual Financial Report +
- 05000285/LER-1991-009, Corrected Ltr Forwarding LER 91-009-00.Memo Stationery Inadvertently Used Instead of Letterhead Stationery for Cover Ltr +
- ML20136F702 +
- ML20138Q546 +
- ML20129F549 +
- ML20133F927 +
- ML20071Q773 +
- ML20197E717 +
- 05000311/LER-1982-124, Forwards LER 82-124/03L-0.Detailed Event Analysis Encl +
- ML20204J111 +
- ML20204B540 +
- JAFP-85-0299, 1984 Radiological Environ Surveillance Rept +
- ML20129F418 +
- JAFP-84-0823, Effluent & Waste Disposal Semiannual Rept for Jan-June 1984 +
- BECO-LTR-94-103, Monthly Operating Rept for Aug 1994 for Pilgrim Nuclear Plant +
- 05000414/LER-1988-026-01, :on 880717,Tech Spec Required Shutdown Due to Inoperable Chemical & Vol Control (Nv) Centrifugal Charge Pump.Cause Not Identified.Procedures Enhanced & Nv Pump 2A Replaced +
- 05000499/LER-1989-009-01, :on 890405,reactor Trip & Loss of Offsite Power on Auxiliary Buses & 4.16-kV Train a ESF Bus Occurred, Resulting in Actuation of Auxiliary Feedwater.Caused by Improper Installation of Relay Wiring +
- 05000320/LER-1988-011, :on 880807,control Room Personnel Failed to Recognize Requirements to Enter Action Statement.Caused by Misunderstanding of Requirements of Tech Spec 3.8.1.1. Event Discussed W/Operators +
- 05000333/LER-1997-002, :on 970124,shutdown Cooling Isolation Occurred. Caused by Pressure Transient.Placed Shutdown Cooling in Service After Resetting Isolation Logic & Refilling & Venting Sys +
- 05000352/LER-1991-023-01, :on 911007,reactor Protection Sys Inverter Output Circuit Breaker Tripped,Causing Loss of Power to Power Distribution Panel.Caused by Actuation of Relay. Alternate Test Method Under Development +
- 05000266/LER-1983-004-03, /03L-0:on 830621,breaker Serving MOV-826B Found Open During Normal Operation & Redundant Valve MOV-826C Not Tested Prior to Disabling MOV-826B.Probably Caused by Personnel Accidentally Opening Breaker +
- 05000325/LER-1991-007, :on 910305,reactor Scram Occurred.Caused by Personnel Error Re Failure to Perform Calibr & Installation of Relay.Develop Plan to Address Recurring Problems & Training Provided +
- 05000334/LER-1990-017-01, :on 901027,auxiliary Bldg Ventilation Relignment Occurred Due to Radiation Monitor Alarm +
- 05000334/LER-1990-017, :on 901027,ESF Actuation - Radiation Monitor Alarm Caused Auxiliary Bldg Ventilation Realignment +
- 05000413/LER-1993-003-04, :on 930925,reactor Tripped Due to Inadvertent Closure of Msiv.Caused by Inadequate Self Checking & Independent Verification of Intended Actions.Procedure IP/0/A/3890/01 Will Be Revised +
- IR 05000295/1990020 +
- 05000341/LER-1993-012, :on 930906,HPCI Sys Suction Swap from Condensate Storage Tank to Torus Occurred.Caused by Discrepancies Between HPCI & Torus Water Mgt Sys Instrument. Calibr Performed on Torus Water Mgt Sys +
- 05000498/LER-1993-007, :on 930204,TS Required Shutdown Commenced Due to Inoperability of turbine-driven AFW Pump.On 930203,Unit 2 Experienced Reactor Trip.Caused by Water Instrusion Into Pump.Extensive Testing & Analysis Performed +
- 05000414/LER-1993-003, :on 930925,reactor Tripped Due to Inadvertent Closure of Msiv.Caused by Inadequate Checking.Corrective Actions:Cros Throttled CA Flow & Entered Procedure EP/2/A/5000/01 +
- 05000267/LER-1980-061, Forwards LER 80-061/03L-0 +
- PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058) +
- 05000272/LER-1990-027-01, :on 900812,main Steamline Isolation Actuation Occurred.Caused by Possible Equipment/Design Concerns. Design Mods to Correct Main Steamline Flow Instrumenation Concerns Under Development +
- 05000296/LER-1988-003-04, :on 880826,diesel Generators 3A,3B & 3D Declared Inoperable Due to Seismic Qualification Concerns W/ Battery Racks.Caused by Inadequate Installation Procedure. Braces & Supporting Hardware Installed.W/Undated Ltr +
- 05000388/LER-2015-015, Regarding Loss of Safety Function Due to Inoperability of Both Trains of the Control Room Emergency Outside Air Supply (Creoas) System +
- ML042940585 +
- ML19351E272 +
- 05000298/LER-1999-006, :on 990727,inadvertent half-group VII Isolation Was Noted.Caused by Deenergization of Relay.Reset PCIS-REL-K65 Relay & half-group VII Isolation +
- ML20129J050 +