Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12108A102 +
- ML12004A014 +
- ML102630003 +
- ML102530044 +
- ML040850644 +
- 05000255/LER-1990-003, :on 900322,inadvertent,automatic Initiation of Auxiliary Feedwater Actuation Sys Received & Auxiliary Feedwater Pump P-8A Started.Caused by Technician Error & Procedure Weaknesses.Procedure Revised +
- ML18331A491 +
- ML20073J706 +
- ML20096C020 +
- ML20095E614 +
- ML20093H831 +
- ML20093F591 +
- ML20091L093 +
- ML20118A138 +
- ML20138Q546 +
- ML20147C865 +
- ML20141G247 +
- ML20069A274 +
- ML20058K863 +
- ML24247A004 +
- ML24260A002 +
- ML24313A016 +
- 05000339/LER-1985-008-02, :on 850725,increased RCS Leakage Occurred. Caused by 2-inch Valve Packing Leak Off RCS Loop A.Maint Performed to Stop Leak +
- 05000353/LER-1996-004-02, :on 960514,reactor Scram Resulted from Main Generator Lockout Due to Actuation of Voltz/Hertz Relay. Caused by Inadequate Design Change Package.Relay 359/381A Drawing Corrected & Relays Inspected +
- 05000286/LER-1984-008-01, :on 840529,reactor Tripped When Closure of Loop 33 MSIV Resulted in Turbine Trip.Caused by Inadvertent Opening of Instrument Air Trip Solenoid Vent Valve Due to Latch Pin Rotation.Valve Reset +
- 05000416/LER-1991-005-03, :on 910617,fault Occurred on B-phase of Breaker J5232,resulting in Loss of Power to Two balance-of-plant & ESF Buses.Caused by Generation of Main Turbine Trip Signal. High Pressure Tanks Replaced +
- 05000416/LER-1991-005, :on 910617,fault Occurred on B-phase of Breaker J5232 (500 Kv).Caused by Inadequate Maint Practices.High Pressure Tank Replaced & Three Adjacent High Pressure Tanks within B-phase Inspected & Cleaned +
- 05000334/LER-1983-002-03, 138-kV Bus 1 Lost.Caused by Inadvertent Operation of Bus back-up Timer Relay 62-Z41. Sbfu & Sru Relays Interchanged,Sbfu Relays Modified & Physical Barrier Around Sbfu Switch Installed +
- 05000261/LER-1983-019-03, /03L-0:on 830729,w/unit at 79% Power,Boric Acid Transfer Pump a Failed During Performance of Periodic Test 7.1A.Caused by Normal End of Component Life for Thermal Switch.Switch Replaced +
- 05000346/LER-1983-026-03, /03L-0:on 830524,one Half Channel Trip in Steam & Feedwater Rupture Control Sys (Sfrcs) Channel 2 Received. Caused by Component Failure.Input Buffer Replaced +
- ML20028E250 +
- ML20033G362 +
- 05000315/LER-1998-042, :on 981023,two RHR Pumps Ran with Unit Depressurized,Contrary to UFSAR Section 9.6.3.2.Caused by Inadequate Communications within Operations Organization. Procedures Have Been Revised.With +
- 05000244/LER-1981-008-03, /03L-0:on 810402,radiation Monitors R-11 & R-12 Were Inoperative & Monitor R-10A Was Not Placed in Operation.Caused by Seized Bearing in Pump Supplying Air Sample to R-11 & R-12.Procedure Modified to Put 10A in Svc +
- 05000458/LER-1988-024, :on 881027,ESF Actuation Occurred Resulting in Isolation of RWCU Sys.Caused by Cross Tripping Phenomenon of Temp Switches & Procedural Error.Changes Made to Surveillance Test Procedures +