4/12/2012 - Public Meeting Summary - Watts Bar Nuclear Plant Unit 2, Annual Assessment Presentation
ML12108A102
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/17/2012
From: Haag R
NRC/RGN-II/DCP/CPB2
To: Skaggs M
Tennessee Valley Authority
References
Download: ML12108A102 (16)


Text

Watts Bar Nuclear Plant Unit 2 2011 Annual Assessment 2011 Annual Assessment April 12, 2012

Purpose of Meeting Di th NRC 2011 A l A t

f th

  • Discuss the NRCs 2011 Annual Assessment of the Watts Bar 2 construction project.
  • Provide an overview of the construction inspection Provide an overview of the construction inspection program for Watts Bar 2.
  • Discuss the status of Watts Bar 2 inspections.
  • Introduce resident staff.
  • Respond to questions and comments from the public.

2

=

Background===

  • 1985; TVA suspended construction of Watts Bar Unit 2.
  • 1990-1995; TVA concentrated on construction of Unit 1 d

dd d

lit i U it 1 and addressed quality issues on Unit 1.

  • July 2000; TVA informs NRC that Unit 2 is in a deferred status in accordance with Commission Policy Statement status in accordance with Commission Policy Statement
  • August 3, 2007; TVA informed NRC of its plan to resume construction of Watts Bar Unit 2.
  • July 7, 2008, the NRC issued an Order extending the Watts Bar Unit 2 construction permit completion date to March 31 2013 3

March 31, 2013.

Construction Inspection Organization Region II Construction Inspection Program Division of Construction Inspection Division Of Construction Projects Construction Inspection Branches Construction Projects Branch 3 Senior Project Inspector Project Inspectors Specialist Inspectors 4

Senior Resident Inspector Resident Inspectors

Assessment Process Increased Inspections Cross-cutting aspects reviewed during Mid Cycle & End of Cycle Assessments (Quarterly, Inspection Inspection P

Cause E

l ti Significant

(

y Mid Cycle,

End Of Cycle)

Program Results Evaluation g

Issues Annual Special Inspections 5

Public Meeting

Scope of Inspections in 2011

  • Inspections Completed in 2011:

- Six-week inspection periods that cover resident activities and weekly regional initiatives activities and weekly regional initiatives

- Independent Design Verification Inspection

- Commercial Grade Dedication Inspection

- Electrical Distribution System Functional Inspection

- Problem Identification and Resolution Inspection

  • In addition to four resident inspectors, 27 regional inspectors conducted inspections in 2011.

6

Scope of Inspections in 2011

  • NRC expended 16,350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> of inspection and related activities for Watts Bar 2 in 2011; increase from 14,932 hours0.0108 days <br />0.259 hours <br />0.00154 weeks <br />3.54626e-4 months <br /> in 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br /> in 2010.
  • Key areas of 2011 inspections:

- Quality assurance program;

- Corrective action program;

- Engineering activities; g

g

- Training and qualification of key personnel;

- Procurement;

- Actual construction activities; and 7

- Refurbishment activities.

Inspection Program Results

  • Overall assessment results:

- TVAs program and procedures were adequate to support i

t ti ti iti ongoing construction activities

- TVA was constructing the facility at an acceptable level of quality

  • Thirteen (13) severity level IV violations identified by NRC inspections. No escalated enforcement or civil NRC inspections. No escalated enforcement or civil penalties. No substantive cross-cutting issues.

8

Inspection Program Results

  • No changes to Inspection Program due to 2011 inspection results
  • Continue with planned inspections for Watts Bar 2 9

Construction Inspection Program IMC 2517 W tt B U it 2 C t

ti

  • IMC 2517, Watts Bar Unit 2 Construction Inspection Program, supplements traditional inspection program p

p g

NRC Construction Inspection Program Construction Phase IMC 2512 Startup Testing IMC 2514 Preop Testing

& Operational Prep 10 IMC 2512 IMC 2514 IMC 2513

Inspection Program Elements Previously Completed Allegations Historical Open items (VIO,NCV,IFI..)

Inspection p

inspections Allegations Inspection Program Generic Communications Licensing issues New Or re-work CAPs/SPs 11

Status of Inspection Program

  • Over 500 construction inspection items in the Inspection Planning and Scheduling (IP&S) database database
  • Completed inspections for 190 IP&S items
  • Many other IP&S items inspected, but additional Many other IP&S items inspected, but additional effort required to close the item 12

Status of Inspection Program (contd)

  • Completed inspections for 11 Corrective Action Programs (CAP) and Special Programs (SP)
  • Many of the 500 IP&S items are historical that
  • Many of the 500 IP&S items are historical that TVA previously addressed; Close-out inspection involves verifying proper resolution 13

Upcoming Inspection Activities C

ti t

i t

ti iti ifi d i IMC 2512

  • Continue to inspect activities specified in IMC 2512 and Refurbishment activities
  • Inspect Other Areas Inspect Other Areas

- CAPs and SPs

- Generic Communication items

- Open Items

  • Inspect pre-operational testing of systems 14

Watts Bar Unit 2 Resident Inspectors Russ Lewis - Acting Senior Resident Inspector CJ Fong - Resident Inspector Jamin Seat - Resident Inspector 15

QUESTIONS?

QUESTIONS?

16