Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0261998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 1.With 990115 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr ML18106A9831998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 2.With 981214 Ltr ML18106A9801998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 1.With 981214 Ltr ML18106A9641998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 2. with 981112 Ltr ML18106A9631998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 1. with 981112 Ltr ML18106A9151998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 2.With 981012 Ltr ML18106A9131998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 1.With 981012 Ltr ML18106A8751998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Generating Station,Unit 2.With 980915 Ltr ML18106A8741998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Unit 1.With 980915 Ltr ML18106A8161998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 1. W/980817 Ltr ML18106A8151998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 2. W/980817 Ltr ML18106A7151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 2. W/980715 Ltr ML18106A7141998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 1. W/980715 Ltr ML18106A6541998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 1. W/980615 Ltr ML18106A6531998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 2. W/980615 Ltr ML18106A6121998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Generating Station,Unit 1.W/980515 Ltr ML18106A6111998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Unit 2. W/980515 Ltr ML18106A5561998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem,Unit 1. W/980415 Ltr ML18106A4591998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem Unit 2. W/980415 Ltr ML18106A3771998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 1.W/980316 Ltr ML18106A3761998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 2.W/980316 Ltr ML18106A3281998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 2. W/980217 Ltr ML18106A3271998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 1. W/980217 Ltr ML18106A2721997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem,Unit 2. W/980115 Ltr ML18106A2711997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem Generating Station,Unit 1.W/980115 Ltr ML18106A2081997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 1. W/971212 Ltr ML18106A2071997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 2. W/971212 Ltr ML18102B6811997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 2.W/ 971117 Ltr ML18102B6801997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 1.W/ 971117 Ltr ML18102B6271997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Salem,Unit 2. W/971015 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A5201999-08-12012 August 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A5211999-07-0101 July 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A3151999-04-30030 April 1999 Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18107A2881999-04-0707 April 1999 Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML20205P1671999-01-31031 January 1999 a POST-PLUME Phase, Federal Participation Exercise ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr 1999-09-30
[Table view] |
Text
r AVERAGE. DAILY UNIT POWER LEVEL Docket No. 50-311 Unit Name Salem # 2 Date July 10,1984 Completed by L. K. Miller- Telephone 609-935-6000 Extension 4455-
. Month June 1984 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 1070 2 0 18 1108-3 0 19 1102
-4 0 20 1086 5 0 21 1087 6 0 22 1094 7 0 23 1077 8' 0 1087 9 0 25 1095 10 0 26: 1100 11 0 :27 1107 12- 0 -28 1045 13 0 29 1103 14 574 30 1100 15 1073 31 16 1097 Pg. 8,1-7 R1
$ hK0 R _.
Page 2 ofl10
--- - ,a.
. l OPERATING DATA REPORT
^
Docket No. 50-311 Date July 10, 1984 Telephone 935-6000 Completed by L. K. Miller Extension 4455 Operating Status
- 1. Unit Name Salem No. 2 Notes
- 2. Reporting Period June 1984
- 3. Licensed Thermal Power (MWt) 3411
- 4. Nameplate Rating (Gross MWe) .
1162
- 5. Design-Electrical Rating (Net MWe) IITY
- 6. Maximum Dependable Capacity (Gross MWe)1149
- 7. Maximum Dependable Capacity -(Net MWe) ITUT
- 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
- 9. Power Level to Which Restricted, if any (Net MWe) N/A
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 720 4367 23808
- 12. No. of Hrs. Reactor was Critical 421.0 1918.3 13626.9-
- 13. Reactor Reserve Shutdown Hrs. 0 1442.9 3533.6-
- 14. Hours Generator On-Line 405.4 1769.6 13186.9
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy: Generated (bORI) 1345678 5743709 39214781
- 17. Gross Elec. Energy Generated (MWH) 449880 1904810- 12773100
- 18. Net Elec. Energy Generated ' (MWH) 425465 1784158 12101406-
- 19. Unit Service Factor ~ 56.-3 40.5 55.4
- 20. Unit Availability Factor ' 56.3 40.5 55.4
- 21. Unit Capacity Factor (using MDC Net) 53.4 36.9 46.0
- 22. Unit Capacity Factor (using DER Net) 53.0 36.6 '45.6
- 23. . Unit Forced Outage Rate . 43.7 59.5 34.8
- 24. Shutdowns scheduled over next 6smonths (type,. date and duration of each) .
N/A.
- 25. If shutdown at end of Report 1 Period, Estimated-Date of Startup:
N/A s 26. Units in Test Status (Prior to Commercial Operation) :
Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricityg 9/1/80 6/3/81 Commercial. Operation 9/24/80. ~10/13/81-8-1-7.R2' Page-3fof 10
- v. . ,, -- - . . , ,
UNIT SHUTDOWN AND POWER REDUCTIONS Dock 3t No. 50-311 "
REPORT MONTH June 1984' Unit'Name ' Salem No.2 Date. . ' July 10,-1984 Completed by L.K. Miller Telephone. 609-935-6000 Extension 4455 Method of-Duration. Shutting License Cause and Corrective.
Com'ponent Action to-No. Date Type ' Hours Reason Down Event' , System.
1 2 Reactor Report- Code 4 Code 5- Prevent Recurrence' High Pressure Safety
. Injection Core:
84-170-05-30 F 314.6 A 1 -
SF VALVEX - Injection / Core Spray Speed Control,
~ 84-172 06-14 F 4.7 A 5 . -- HH INSTRU ' Feedwater Pump-Traveling. Screen /
Trash' Rack / .84-190 06-23 F .5' B 5 -
HF FILTER Canal Screen Traveling Screen /
Trash-Rack '.~
84-192 06-23 F .2 'E 5- -
HF FILTER Canal Screen' 1 2 Reason 3 Method 4 Exhibit G S Exhibit 1 F: Forced . A-Equipment. Failure-explain 1-Manual Instructions Salem as
, S: Scheduled B-Maintenance or Test 2-Manual Scram, for Prepara- Source.
C-Refueling '3-Automatic Scram, tion of Data D-Regulatory Restriction .4-Continuation of Entry Sheets E-Operator Training & Licensing Exam . Previous' Outage for. Licensee 5-Load Reduction-
~
F-Administrative. . .
Event Report G-Operational. Error-explain. 9-Other -(LER) File H-Other-explain (NUREG 0161)
+
3
< Page 4.of-10 w-k_ ---_ _ _ _ _ _ . _ . _ . _ - _ _ - - - - - - _ v T A _ _ - - _ _
DOCKET NO3 gn-111 MAJOR PLANT MODIFICATIONS *
' REPORT MONTH JUNE 198'4 DATE: JULY 10, 1984 .
COMPLETED BY : L. K. MILLER TELEPHONE: (609) 339-4455 PRINCIPLE SYSTEM SUBJECT
1 .
Circulating Water Provide electrical power feed to-2ET-0944 vendor supplied heat transfer research unit.
2EC-1008 Main Transformers Replace vacuum switch on COPS tank with new model switch and. arrange-ment. Also relocate vacuum switch alarm.
Install noise suppression.
2EC-1387 SEC I 2EC-1620A Reactor Coolant System- Replace existing recorders with I' Wide Range RTD Recordero seismically qualified recorders.
Instrument Nos. TA-0014, TA-0016, TA-0036 and TA-0038. -
t 2EC-1724 Chemical & Volume Replace the 2CV45 and 2Cv50 valves.
j r i
Control 4
1 J
i 1
l 5r i
l
~
i-
^
8-1-7.R1 Page 5 of 10 O
j
-- - ' * - _.__,,._,..y'y,
l MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-311 REPORT MONTH JUNE 1984 UNIT NAME: Salem 2 DATE: July 10, 1984 COMPLETED BY: L.K. Miller TELEPHONE: 609/339-4455 DCR NO. 10CFR 50.59 SAFETY EVALUATION 2ET-0944 This test requires no change to existing systems, nor does it affect any presently performed safety analysis. No unreviewed safety or environmental questions are involved.
2EC-1008 This change in the alarms improves plant reliability by decreasing operator response time. No unreviewed safety or environmental questions are involved.
2EC-1387 Implementation _of this DCR does not involve any unreviewed safety or environmental questions.
2EC-1620A All potential realistic failures have been considered and are not applicable. No unreviewed safety or environmental questions are involved.
2EC-1724 Addition of the blind flange will eliminate two potential paths of unidentified leakage from the reactor Coolant System. No unreviewed safety or environmental questions are involved.
Page 6 of 10
( ..
PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT NO. 2
- WO NO DEFI UNIT EQUIPMENT IDENTIFICATION 954241 - - 0D 2 'NO. 24 OPAT FAILURE DESCRIPTION: INDICATOR STUCK IN MID SCALE (050484)
CORRECTIVE ACTION: REPLACED SEVERAL CAPACITORS AND RECALIBRATED (050484) 954117 .0D .2 NO. 24 STEAM GENERATOR LEVEL INDICATION FAILURE DESCRIPTION: CHANNEL III IS READING 3% LOWER THAN THE OTHER CHANNELS (050784)
CORRECTIVE ACTION: REPAIRED ROOT VALVE PACKING LEAK AND PERFORMED RECALIBRATION (052284) 900108-0-MD 2 VALVE 22WG10 FAILURE DESCRIPTION: BLOCKAGE..IN SUCTION TO WASTE CAS COMER (062584)
. CORRECTIVE ACTION: REPLACED DIAPHRAGM (070384)
~9900019-9 MD 2 4KV VITAL BUS FAILURE DESCRIPTION: REMOVE 83 RELAY FROM 1A 4KV VITAL BUS AND INSTALL ON 2C 4KV VITAL BUS (051584)
. CORRECTIVE ACTION: REMOVED RELAY FROM 1A AND INSTALLED IN 2C, INSTALLED REBUILT RELAY IN 1A AND TESTED (060784)
Page 7 of 10 L_.- _
, !=
UNIT.2 l1
'99022966.MD
.2 2C SAFEGUARDS EQUIPMENT CONTROL CABINET FAILURE DESCRIPTION: - SPURIOUS ALARMS (061184)
CORRECTIVE ACTION:' INCREASED DC VOLTAGE IAW MD84-3215. (061284) 6,L84-05-29-550-0
- CD 2' NO. 21 MOTOR GENERATOR SET
- FAILURE DESCRIPTION: HIGH VIBRATION (052948)
-;, ~
- ' CORRECTIVE ACTION: REPLACED INBOARD AND OUTBOARD. BEARINGS (060584)
V
.s ~~."-~
i F
r
+ -
Page 8 of 10
+
L,.. _ . .____:_. ._.. _ _ _
SALEM UNIT NO. 2 OPERATIONS
SUMMARY
REPORT JUNE 1984 Unit No. 2 began the month shutdown in order to replace 21SJ16 and 22SJ16 valves. These valves, which are in the ECCS flow path, were considered inoperable after radiographs indicated the valve plug and stem orientation were not proper. Inspection of the valves after their removal revealed that the weld that holds the disk nut to the disk was missing. The Unit remained in Mode 5 until June 5, 1984 when plant heatup commenced. No load pressure and temperature of 2235 psig and 5471o!F was reached on June 6, 1984. A plant cooldown to approximately 367*F was reached on June 6, 1984. A plant cooldown to approximately 367 F was initiated on June 7, 1984 to facilitate changeout of No. 23 CVCU motor. No. 23 CFCU motor failed to start in slow speed during surveillance testing thereby requiring its repair or replacement. No. 23 CFCU was subsequently replaced with No. 14 CFCU, however it too failed to start in slow speed. No. 22 CFCU has been placed in the No. 23 CFCU location. No. 12 CFCU has been placed in the No. 22 CFCU location. The apparent cause of the CFCU failures to start in slow speed was misalignmetn of the rotor to stator air gap.
The plant recommenced heatup on June 13, 1984. Criticality was achieved at 1059 hours0.0123 days <br />0.294 hours <br />0.00175 weeks <br />4.029495e-4 months <br /> on June 13, 1984. The Unit was synchronized on June 14, 1984 at 0238 hours0.00275 days <br />0.0661 hours <br />3.935185e-4 weeks <br />9.0559e-5 months <br /> and reached full power on June 15, 1984.
The Unit remained at full power until June 23, 1984 when the Unit load was decreased to 64% at 0932 hours0.0108 days <br />0.259 hours <br />0.00154 weeks <br />3.54626e-4 months <br /> due to heavy grass loading on the Circulating Water Traveling Screens. The Unit returned to full power at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br /> on June 23, 1984 where it remained for the remainder of the period.
l Page 9 of 10
l llEE" REFUELING INFORMATION DOCKET NO.: 50-311 COMPLETED BY: L.K. Miller UNIT NAME: Salem 2 DATE: July 10, 1984 TELEPHONE: 609/935-6000 EXTENSION: 4455 Month June 1984
- 1. Refueling information has changed from last month: -
YES NO X
- 2. Scheduled date for next refueling: January 5, 1985
- 3. Scheduled date for restart follos ing refueling: March 17, 1985
- 4. A) Will Technical Specification changes or other license amendments be required?
YES NO NOT DETERMINED TO DATE 6/1/84 B) Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES NO X If no, when is it scheduled? November 1984
- 5. Scheduled date (s) for submitting proposed licensing action:
December 1984 (if required)
- 6. Important licensing considerations associated with refueling:
NONE
- / . Number of Fuel Assemblies:
A) Incore 193 B) In Spent Fuel Storage 72
- 8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
- 9. Date of last refueling that can be discharged to spent fuel pool assuming the present I licensed capacity: March 2004 l 8-1-7.R4 Page 10 of 10
O PSEG Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station July 10, 1984 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
MONTIILY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of June 1984 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information Sincerely yours, J. Zu o, Jr.
General Manager - Salem Operations LKM:sbh cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia,.PA 19405 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page1 of 10 8-1-7.R4 i