Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML100570414 +
- 05000260/LER-1994-004-02, :on 940415,Unit 2 Received a Full Scram from Full Power Due to RPS Trip Signal Generated by Low Scram Pilot Air Header Pressure Signal.Failed Module in Temp Detection Loop +
- ML18058B417 +
- 05000352/LER-1989-053, :on 891022,control Room Personnel Manually Initiated Ventilation Sys Chlorine Isolation,Esf.Caused by High Vinyl Chloride Concentration in Outside Air Intake Plenum.Special Event Procedure Implemented +
- ML19063A497 +
- ML20064F301 +
- ML20062E993 +
- NL-03-143, August 2003 Monthly Operating Report for Indian Point Unit 2 +
- ML20077F315 +
- IR 05000312/1985032 +
- ML20136C071 +
- ML20141H425 +
- IR 05000289/1985017 +
- ML20199D294 +
- ML20199D143 +
- ML20205P674 +
- ML20196H857 +
- ML20195B275 +
- ML20212G726 +
- ML20236C416 +
- BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With +
- NUREG-1530, SECY-23-0020: Enclosure 2 - Regulatory Analysis +
- 05000267/LER-1989-011, :on 890623,discovered That Reheat Steam Attemperation Flow Not Accounted for in Secondary Heat Balance Calculation of Reactor Power.Caused by Inadequate Procedures.Procedure Changes Implemented +
- 05000317/LER-1998-009, :on 980408,required Hourly Fire Watch Missed, When Contractor Maint Worker Failed to Perform Fire Watch Patrol.Caused by Personnel Error.Plant Mgt Reiterated Expectation to Contractor Personnel.With +
- 05000312/LER-1985-022, :on 851120,pressurized Sampling Valve HV-21516 Found in Open Position W/Breaker Racked Out.Caused by Lack of Administrative Control.Process Sampling Procedures & Operator Training Upgraded +
- ML20137T527 +
- 05000293/LER-1992-016, :on 921213,automatic Scram Resulting from Load Rejection Occurred While at 48 Percent Reactor Power.Caused by 345 Kv Switchyard Flashovers Due to Salt Deposited During Severe Coastal Storm +
- ML20094P553 +
- ML20091G865 +
- 05000346/LER-1983-046-03, /03L-0:on 830830-0922,during Fire Protection Barrier Surveillance test,15 Fire Dampers Found Nonfunctional.Caused by Const Installation Error or Equipment Failure.Dampers Repaired +
- 05000413/LER-1990-013-01, :on 900611,approx 5,000 Gallons of RCS Water Inadvertently Transferred to Refueling Water Storage Tank. Caused by Inappropriate Action.Proper Sys Parameters Restored & Analysis of Event Performed +
- IR 05000113/1990001 +
- IR 05000289/1979010 +
- 05000260/LER-2010-002, Regarding Failure to Meet the Requirements of Technical Specifications Limiting Condition for Operation Due to Inoperable Primary Containment Isolation Instrumentation +
- ML17328A675 +
- ML19282B911 +
- ML16341E828 +
- L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With +